The homeowner’s library
Remodeling in Seattle, explained before you sign.
36 long answers on costs, permits, older houses, kitchens, bathrooms, basements and ADUs, and how to hire. Each one starts with the short answer and ends with its sources and the day they were read.
- articles
- 36
- articles
- official sources
- 247
- official sources
- topics
- 6
- topics
Start here
A first remodel, in four reads.
In this order: the budget, the contractor, the permit clock and the checklist that ties them together.
- 01Costs and budgetsHow to Set a Remodel Budget in Seattle: 2026 Guide9 min read
- 02Permits and rulesHow to Check a Contractor in Washington Before You Hire9 min read
- 03Permits and rulesHow Long Remodel Permits Take in Seattle and the Eastside10 min read
- 04Planning and hiringRemodel Planning Checklist: From First Idea to Walkthrough9 min read
Every article
Find an answer.
36 of 36 articles
Costs and budgets9 minHow to Set a Remodel Budget in Seattle: 2026 GuideA remodel budget is more than the contractor's price. Here is how to build one for a Seattle house, line by line, from published figures you can check yourself.
Costs and budgets8 minSales Tax on Remodeling in Washington: Labor IncludedIn Washington, sales tax on a remodel applies to the full price of the job, not only the materials. Here is the rule, where the rate comes from and how it should appear on your bill.
Costs and budgets8 minHow to Read a Remodeling Estimate: The Lines to CheckAn estimate is the first written statement of what you are buying. Read it for what it includes, what it leaves out and how the money moves, and two bids that looked far apart often turn out to price different jobs.
Costs and budgets9 minRemodel Deposits, Draws and Lien Rules in WashingtonWashington law says little about how much to pay and when, and a lot about what happens when someone on the job goes unpaid. Here is the usual practice, and the rules that protect your house.
Costs and budgets9 minHow to Pay for a Remodel: HELOC, Refinance or LoanMost remodels are paid for with savings, the equity already in the house, or a mortgage that lends against the house as it will be. Here is how each option works, according to the agencies that regulate or back them.
Costs and budgets8 minRemodel ROI in Seattle: Which Projects Pay BackSome projects return more than they cost when you sell; most return part of it. Here are the Seattle numbers, where they come from, and the Washington tax rules that change the arithmetic.
Permits and rules10 minHow Long Remodel Permits Take in Seattle and the EastsideThe review targets each city publishes, what the clock counts, and how to plan a start date around them. Where a city publishes no figure, this page says so.
Permits and rules9 minHow to Check a Contractor in Washington Before You HireA walk through the state's free lookup, line by line, with the laws behind each line and what an unregistered contractor means for the homeowner.
Permits and rules9 minAsbestos Surveys Before a Remodel in the Puget Sound AreaThe regional air agency's rule and the state's, in the order a remodel meets them: survey, decision, notice, removal, then demolition.
Permits and rules7 minLead-Safe Renovation Rules for Pre-1978 Homes in WashingtonWashington runs its own version of the federal lead renovation rule through the Department of Commerce. Here is what it requires of the people you hire, and what it does not require of you.
Permits and rules9 minWhat Washington's Energy Code Means for a RemodelThe rules that apply when you open a wall, replace a window or add a room, from the state's published code and Seattle's copy of it.
Permits and rules9 minSeattle Tree Rules for Additions and Backyard CottagesWhich trees Seattle protects, what the 2023 code and its January 2026 update allow when you build, and how a large tree can shape the design and the permit.
Older homes9 minRemodeling a Seattle Craftsman: What to Plan ForCraftsman houses fill whole streets in Seattle. A century on, most need the same few things behind the walls, and a large remodel brings city rules that a small one does not.
Older homes9 minRemodeling a 1950s to 1970s Rambler or Split-LevelMid-century houses are often the easiest in the region to open up and add onto. Their wiring, finishes and garage levels come with a checklist of their own.
Older homes8 minKnob-and-Tube Wiring in Seattle Homes: Remodel RulesThe oldest wiring still found in Seattle houses can legally stay in some walls. A remodel decides how much of it goes, and the code sets a few rules for the part that stays.
Older homes8 minGalvanized Pipes in Seattle Homes: When to RepipeSteel water pipe was standard in houses for most of the last century. It fails slowly, from the inside, and a remodel is the cheapest time to replace it.
Older homes8 minSeismic Retrofit During a Remodel in SeattleMany older wood houses in Seattle can be tied to their foundations with pre-drawn plans and a permit that costs about $300. The best time to do it is while the basement or crawl space is open anyway.
Older homes9 minElectrical Panel Upgrade for a Seattle RemodelA new kitchen, a heat pump or an EV charger can outgrow an older electrical service. Whether yours actually has is a calculation, and in Seattle the upgrade itself runs on City Light's calendar.
Kitchens and bathrooms9 minRemoving a Load-Bearing Wall in Seattle: Beams and PermitsMost kitchen openings in Seattle houses go through a quick permit with no engineer. The length of the new beam and the floors above it decide which ones do.
Kitchens and bathrooms9 minSwitching a Seattle Kitchen From Gas to InductionThe range is the easy part. The circuit behind it, the panel that feeds it and the gas line it leaves behind decide how big the job is.
Kitchens and bathrooms8 minHow Long a Kitchen Remodel Takes in Seattle, Step by StepThe weeks on site are only part of it. Design, ordering, permits and inspections set the pace, and each one has a known place in the order of work.
Kitchens and bathrooms8 minBuilding a Curbless Shower: Floor, Drain and WaterproofingA curbless shower is a floor problem before it is a tile problem. With no curb to hold the water back, the shower floor has to sit lower than the room around it.
Kitchens and bathrooms8 minBathroom Exhaust Fans in Seattle: Code, Ducts and MoldSeattle's code asks every bathroom for a fan that moves a tested amount of air to the outdoors. Here is what that means in a remodel, and why it matters for mold.
Kitchens and bathrooms9 minDesigning a Bathroom to Age in Place: Sizes That WorkNo code requires an accessible bathroom in a private house. The standards written for public buildings and apartments still give the best measurements for one.
Basements, ADUs and additions10 minHow to Keep a Seattle Basement Dry Before FinishingA finished basement hides its walls for decades, so the water question has to be settled first. Here is where the water comes from in this climate, how each fix works, and how to show the space is dry before anything is framed.
Basements, ADUs and additions10 minBasement Egress Window Rules in Washington and SeattleEvery basement bedroom needs a way out that a person can climb through and a firefighter can climb in by. These are the numbers from section R310 of the residential code as Washington adopted it.
Basements, ADUs and additions9 minTurning a Basement Into a Legal Apartment in SeattleA basement apartment is the least visible way to add a home to a Seattle lot, and one of the most rule-bound inside. This is what the zoning allows, what the building code asks of the unit and what comes after the permit.
Basements, ADUs and additions9 minDADU, Basement ADU or Addition: Which Fits Your LotThree projects add room on the lot you already own, and the city treats them very differently. This guide sets the rules, the permits and the published costs side by side, so the lot can make the first cut.
Basements, ADUs and additions9 minConverting a Garage Into an ADU in SeattleMany Seattle garages sit where no new building could go today, and the code lets them become homes anyway. Here is what the conversion rule allows, what the building and energy codes ask of the building, and how the work runs.
Basements, ADUs and additions10 minSecond Story or Bump-Out: Adding Space in SeattleAn addition either takes yard or takes height, and the city's rules treat the two very differently. Here is what each route asks of the permit, the structure, the energy code and the budget.
Planning and hiring9 minDesign-Build or Architect First for a Seattle RemodelThere are two fair ways to get from an idea to a finished remodel. One puts design and construction under one contract; the other keeps them apart so builders can bid on finished drawings.
Planning and hiring9 minQuestions to Ask a Remodeling Contractor in WashingtonWashington's Department of Labor & Industries and the Attorney General's office publish what to check before hiring. Here is that guidance turned into questions you can ask at the kitchen table.
Planning and hiring9 minChange Orders on a Remodel and How to Keep Them SmallMost change orders come from a decision made late, a condition hidden in the walls or a requirement from the inspector. Each one can be planned for before the contract is signed.
Planning and hiring9 minLiving at Home During a Remodel: Dust, Noise and KitchensMost remodels can be lived through if the house still has a place to sleep, wash and cook. The plan for dust, noise and the missing room is made before demolition, not during it.
Planning and hiring9 minWhen to Start a Remodel in Seattle: Permits and RainInside work can start in any month. Work that opens the roof, the walls or the ground is best timed for the dry summer, which means the permit has to be in hand before it.
Planning and hiring9 minRemodel Planning Checklist: From First Idea to WalkthroughEvery step of a remodel in the order it happens, with what to check at each one and where to read more.
Topics
- Costs and budgetsWhat remodels cost here, what the estimate means and how the money moves.
- Permits and rulesWhat needs a permit, how long review takes and the state rules behind the work.
- Older homesWhat Seattle houses of each era hide behind their walls, and what to do about it.
- Kitchens and bathroomsWalls, wiring, water and timelines for the two rooms people remodel most.
- Basements, ADUs and additionsMore living space on the lot you own, built dry, legal and to code.
- Planning and hiringHow to choose a builder, set up the project and live through it.

