What are the main ways to pay for a remodel?

In practice there are five: cash, a home equity line of credit (HELOC), a home equity loan, a cash-out refinance, and a renovation mortgage such as FHA's 203(k) or Fannie Mae's HomeStyle Renovation. Unsecured personal loans and credit cards fill smaller gaps. The table compares how each works, from the Consumer Financial Protection Bureau (CFPB), HUD and Fannie Mae.

How the main ways to pay for a remodel work
OptionHow you get the moneySecured by the housePoints to know
SavingsPaid out as the work progressesNoNo interest or closing costs; keep the contingency in cash too
HELOCA credit line you draw on as needed during a draw period, then repayYesUsually a variable rate; the lender may freeze the line
Home equity loanA lump sum at closingYesFixed or adjustable rate; repayment often required when you sell
Cash-out refinanceA new, larger first mortgage; you take the difference in cashYesReplaces your current mortgage and its rate; closing costs usually apply
FHA 203(k)Purchase or refinance plus repair costs in one FHA-insured mortgageYesBuilding permits must be obtained before work starts
Fannie Mae HomeStyle RenovationPurchase or limited cash-out refinance with renovation money in a first mortgageYesRenovation funds held in a custodial account; 15 months to finish
Personal line of credit or loanBorrowed on your credit, not the houseNoCFPB: limits may be lower and rates higher than home-secured options
Credit cardUp to the card's limitNoCFPB: regular card rates are typically higher than home-secured options

No interest rates are given here. They change daily and depend on the borrower, the loan and the lender.

How does a HELOC work for a remodel?

The CFPB describes a HELOC as an open-end line of credit that lets you borrow repeatedly against your home equity. During the draw period, often 10 years, you can borrow up to the limit. Then the repayment period begins, which lenders often set at 10 or 20 years, and payments are often much higher. Some lenders require the whole balance at the start of repayment. Most HELOCs have a variable rate, so the payment can change month to month; some plans let you convert part or all of the balance to a fixed rate, usually a higher one.

That shape suits a remodel paid in draws: you borrow each draw when it falls due rather than the whole sum on day one. The risks are specific. The CFPB warns that you could lose your home if you cannot repay, that the lender may stop further borrowing if your home's value drops significantly, and that it may freeze the line if your finances change. A line frozen halfway through a kitchen remodel is a real problem, so keep the contingency available from another source if you can.

Home equity loan or cash-out refinance: what is the difference?

A home equity loan is a second loan alongside your mortgage. You receive the full amount at once and repay it in fixed monthly payments, and the CFPB notes that repayment is often required when you sell. A cash-out refinance replaces your existing mortgage with a bigger one, and you take the difference in cash. It changes the rate and terms on your whole mortgage balance, not only on the remodel money, and you often pay closing costs.

That is the core trade-off. If your current mortgage rate is lower than the rate a new loan would carry, a refinance reprices all of it; the CFPB suggests weighing the new rate, especially if it is higher than your current one. A home equity loan or a HELOC leaves the first mortgage alone.

How do FHA 203(k) and Fannie Mae HomeStyle renovation loans work?

Both lend against what the house will be worth after the work, which helps when there is little equity today, such as soon after buying a house that needs work. Both are made by approved lenders, and in both the renovation money is held back and paid out as the work is done.

FHA 203(k)

HUD's 203(k) program insures one mortgage that covers the purchase or refinance and the cost of the repairs. HUD lists kitchen and bathroom remodels, additions, finished attics and basements, accessibility work, energy upgrades and eligible accessory dwelling units among the improvements it can pay for. There are two types:

  • Limited 203(k): minor remodeling and nonstructural repairs, up to $75,000 in total rehabilitation costs (the cap was $35,000 before November 4, 2024), no minimum, and a 203(k) consultant is optional. Repairs must be finished within nine months.
  • Standard 203(k): remodeling and repairs including structural work, a minimum of $5,000 in repairs, no set maximum for the repair costs, and an FHA-approved 203(k) consultant is required. Repairs must be finished within 12 months.

HUD requires all building permits to be obtained before work begins and posted on site. On a Standard 203(k) for a house 30 years or older, the lender must set a contingency reserve of 10 to 20 percent of the repair costs, and at least 15 percent if the utilities are not working. Luxury and recreational items are not eligible.

Fannie Mae HomeStyle Renovation

Fannie Mae's HomeStyle Renovation is a conventional first mortgage for a purchase or a limited cash-out refinance that includes the renovation money. Fannie Mae's product sheet says any renovation or repair permanently affixed to the property is eligible. Renovation costs may not exceed 75% of the as-completed appraised value on a refinance, or 75% of the lower of the purchase price plus renovation costs and the as-completed value on a purchase. The work should be completed within 15 months of closing.

The borrower must have a construction contract with a contractor the lender reviews, and the plans must be prepared by a registered, licensed or certified general contractor, a renovation consultant or an architect. The renovation money sits in a custodial account the lender manages during the work, and any unused funds go to reduce the loan balance. A contingency reserve is optional for a one-unit home and required at 10 percent for two to four units.

Can you cancel a home equity loan or refinance after signing?

Usually, for a short time. Under the federal Truth in Lending rules, a loan that puts a lien on your principal home, other than a loan to buy it, generally comes with a right of rescission: the right to cancel. The CFPB says it covers refinances and home equity loans, and Regulation Z section 1026.15 gives the same right when a HELOC on your principal home is opened.

The time runs until midnight of the third business day after the last of three things: signing the loan, receiving the Truth in Lending disclosure, and receiving the notice of your right to cancel. For this purpose the CFPB counts Saturdays as business days, but not Sundays or legal public holidays. To cancel, use the lender's form or a letter, mailed or delivered before the deadline, and keep proof that it went on time. A mortgage used to buy the home has no such right.

How do you choose between the ways to pay for a remodel?

Match the loan to the size and timing of the project, and to what you already have. The questions below follow from how each product works. A lender, or a HUD-approved housing counselor, can run the numbers for your situation.

  • How much equity do you have today? Little equity points toward a renovation mortgage that lends on the value after the work; more equity opens a HELOC or a home equity loan.
  • Is your current mortgage rate lower than a new loan's would be? Then a cash-out refinance reprices your whole balance, while a second loan does not.
  • Will the money go out over months? A HELOC's draws can follow the contractor's draw schedule.
  • Is the work structural, or over $75,000? Then FHA's Limited 203(k) is out and the Standard 203(k) applies.
  • Can the work be finished within the loan's limit: 9 months on a Limited 203(k), 12 on a Standard 203(k), 15 on HomeStyle?
  • Do the contractor's payment schedule and the lender's release of funds line up? Ask both before you sign either.

Are there tax credits for a remodel in 2026?

Not the federal energy credit most people remember. The IRS says the energy efficient home improvement credit can be claimed for improvements made through December 31, 2025, so 2026 work does not qualify. Utility and local rebates are separate; the energy rebate calculator covers the ones in the Seattle area. Whether interest on a home equity loan is deductible depends on how the money is used and on your own taxes, so ask a tax adviser.

Renovation lenders work from the contractor's written contract and cost figures, so get a written, itemized estimate before you apply. Giant Builders provides one free after an in-home visit.