What does Seattle's code require for a bathroom fan?

Washington's residential code, which the 2021 Seattle Residential Code carries, requires a local exhaust system in every bathroom and toilet room. The fan must be able to exhaust 50 cfm if it runs intermittently or 20 cfm if it runs continuously, with its listed rate measured at a static pressure of 0.25 inch of water column. Fans must be tested and rated under the Home Ventilating Institute's procedures.

Bathroom exhaust rules in the 2021 Seattle Residential Code
RuleRequirementSection
Minimum airflow50 cfm intermittent or 20 cfm continuous, rated at 0.25 in. of water columnTable M1505.4.4.1
Where it dischargesTo the outdoors only. Never into an attic, soffit, ridge vent or crawl space, and never recirculatedM1501.1, M1505.2
DuctA back-draft damper, and insulation of at least R-4 in unconditioned spaceR303.5.1.1
Outlet locationAt least 3 ft from property lines and from operable windows and doors, 10 ft from mechanical air intakes, and not aimed onto walkwaysM1504.3, R303.5.1
ControlsOn/off switch, timer, or occupancy, humidity or pollutant sensor, readily accessible in the roomM1505.4.4.1
Proof of airflowMeasured as installed with a flow hood or similar device, unless the duct meets the prescriptive size tableM1505.4.4.2

From the 2021 Seattle Residential Code, chapters 3 and 15, which carry Washington's statewide amendments in WAC 51-51. Cities around Seattle enforce the state version of the same 2021 code; ask the city about any local change.

Why does the duct matter as much as the fan?

A fan's rating is measured against a set resistance. The air it delivers drops as the duct gets longer, narrower, rougher or more bent. The code handles this two ways: test the delivered airflow after installation, or follow its prescriptive duct table, which assumes no more than three elbows and takes 10 feet off the allowed length for each extra one.

Prescriptive bathroom exhaust duct sizes
Fan tested at 0.25 in. w.g.Flexible duct, maximum lengthSmooth duct, maximum length
50 cfm4 in: 25 ft. 5 in: 90 ft. 6 in: no limit4 in: 70 ft. 5 in: 100 ft. 6 in: no limit
80 cfm4 in: not permitted. 5 in: 15 ft. 6 in: 90 ft4 in: 20 ft. 5 in: 100 ft. 6 in: no limit
100 cfm5 in: not permitted. 6 in: 45 ft5 in: 50 ft. 6 in: no limit

From Table M1505.4.4.2 of the 2021 Seattle Residential Code. Lengths assume three elbows or fewer; subtract 10 feet for each additional elbow.

The practical lessons: use smooth duct where the framing allows, keep the run short and straight, and do not put a bigger fan on the same small duct. In an attic the duct must carry R-4 insulation, so warm, wet air does not cool and condense inside it on the way out.

Is it a problem if my bathroom fan vents into the attic?

Yes. The code says exhaust air from bathrooms must go directly to the outdoors and may not discharge into an attic, crawl space or other area inside the building (M1505.2). A fan that blows loosely into the attic, or at a vented soffit, puts warm, wet air against cold roof sheathing, where it condenses. The fix is a duct to a proper roof or wall cap with a damper, which is ordinary work during a bathroom remodel.

Older Seattle bathrooms often have no fan at all, or one tied into the attic. The code does not make you upgrade a bathroom you are not touching, but when the bathroom is remodeled, new work must meet the code for new construction (SRC R4404.1 and R4404.2).

How long should a bathroom fan run after a shower?

Long enough to bring the room back down after the shower, which takes longer than the shower itself. The code sets no run time for a switched fan, but it accepts timers and humidity sensors as controls. When a bathroom fan also serves as the house's whole-house ventilation, a fan designed to run faster than its continuous rate must have an occupancy or humidity sensor that boosts it automatically (M1505.4.1.2). A humidity sensor, or a timer that keeps the fan going after you leave, is the simple way to make the fan do its job.

Air has to reach the fan to leave through it. SDCI's code summary says that where an exhaust fan provides the whole-house ventilation, doors must be undercut at least 1/2 inch above the floor covering (Tip 303A). The same gap helps any bathroom fan.

Quiet fans get used. A fan that serves as the continuous whole-house fan must be rated at 1.0 sone or less (M1505.4.1.1), and a fan near that rating is easy to leave running.

Does a bathroom remodel trigger whole-house ventilation?

Usually not by itself. Washington's code requires dwelling units to have local exhaust and a whole-house ventilation system (R303.4 and M1505.4), and SDCI's code summary describes the whole-house options for new houses and additions. Additions with less than 500 square feet of conditioned floor area are exempt from the whole-house requirement. A bathroom remodel inside the house is held to the local exhaust rules above. Ask at permit time if the project also reconfigures other rooms, because reconfigured spaces must be ventilated under section R303 (SRC R4404.5).

Many households choose a quiet, continuous bathroom fan anyway. Run at its continuous rate it can form part of whole-house ventilation, and the energy code sets minimum efficiencies for such fans: 2.8 cfm per watt below 90 cfm and 3.5 cfm per watt at 90 cfm or more (Seattle Energy Code Table R403.6.1).

How do moisture and mold get into a Northwest bathroom?

Mold needs moisture. King County sits in the marine climate zone, 4C, in Washington's energy code, and a shower adds water to the air of any house. The EPA's guidance is to keep indoor relative humidity below 60 percent, ideally between 30 and 50 percent, to dry water-damaged areas within 24 to 48 hours, to cover cold surfaces such as cold water pipes with insulation, and to run the bathroom fan or open the window when showering.

  • Paint peeling or spotting on the ceiling over the shower.
  • A fan that will not hold a square of tissue against its grille while running.
  • Soft or stained subfloor at the edge of the toilet or tub.
  • Loose or hollow-sounding tile, or grout that stays dark long after a shower.
  • Water stains on the attic side of the bathroom ceiling, or a wet duct.
  • Condensation on a cold outside wall or window in winter.

The EPA treats a moldy area of less than about 10 square feet as a job most people can handle themselves; for larger areas or heavy water damage it points to its fuller remediation guidance. Inside the shower walls, the fan cannot help. Wet walls are a waterproofing question: the backer boards the code allows, a membrane where it belongs, and no water-resistant gypsum board where it will be exposed to water (SRC R702.3.7 and R702.4.2). The curbless shower article covers waterproofing in detail.

What should a bathroom remodel include for ventilation?

  • A fan rated by HVI at 0.25 inch of water column for at least 50 cfm, or a continuous fan of at least 20 cfm.
  • A duct sized from the code's table, or an airflow test after installation.
  • Smooth metal duct where possible, as short and straight as the framing allows.
  • A roof or wall cap with a damper, at least 3 feet from operable windows, doors and property lines.
  • R-4 duct insulation through the attic or any unconditioned space.
  • A timer or humidity sensor, reachable in the bathroom.
  • A door gap or other path for air to reach the fan.
  • An electrical permit for the new fan wiring.

Permit details for Seattle bathrooms are in the bathroom permit guide, and costs by scope are in the bathroom cost guide.