Home remodeling in Auburn, WA

Where a permit is filed in Auburn, how long the city takes, what sales tax adds in each county, what the work costs and what the city allows for backyard cottages. Each fact is tied to the city or state page it comes from.

By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

A living room with a two-story ceiling and an open staircase, and a white kitchen seen through a wide opening
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short answer

Remodeling in Auburn, in short

Most remodels in Auburn need a building permit from the city, applied for online at MyBuildingPermit.com, and the city says its review currently takes about 2 to 3 weeks. New wiring needs a separate electrical permit from the state. Auburn lies in two counties, so sales tax is 10.5% in the King County part and 10.4% in the Pierce County part.

The nearest published costs are for the Seattle market: about $75,000 to $130,000 for a typical full kitchen remodel, with survey figures of $36,146 for a midrange bathroom and $68,358 for a basement. Auburn adopted new ADU rules at the end of 2024: two per lot, from 300 to 1,000 square feet each.

Auburn in brief
QuestionAnswer
Who issues building permits?The City of Auburn's Building Division. Permit Center: 253-931-3090, option 2.
How do I apply?Online at MyBuildingPermit.com for most applications.
How long does review take?About 2 to 3 weeks, the city says, and about 2 more weeks when plans are resubmitted.
Who issues electrical permits?The Washington State Department of Labor & Industries (L&I), not the city.
What is the sales tax?10.5% in the King County part of Auburn and 10.4% in the Pierce County part, for October 1 to December 31, 2026.
How many ADUs can a lot have?Two, attached or detached, from 300 to 1,000 square feet each, with no more than two bedrooms.
Which county?Auburn lies in both King and Pierce counties.
Each answer is explained further down. The sources are at the end of the page.

Permits

Permits for a remodel in Auburn

Building permits in Auburn come from the Building Division of the city’s Community Development department, which checks the plans, issues the permit and inspects the work. Most applications are taken online through MyBuildingPermit.com. The Permit Center answers questions at 253-931-3090, option 2.

What needs a permit

The city’s list of work that needs a permit includes building alterations and repairs, plumbing, window replacement, siding, re-roofing, foundation work and demolition. For anything unclear its advice is short: call before you build.

An emergency leak repair can start before the permit is issued, as long as the permit is applied for before the work is covered up.

Electrical permits come from the state

Auburn does not issue electrical permits or inspect electrical work. The Washington State Department of Labor & Industries (L&I) issues every electrical permit for a property inside the city limits. The permit has to be bought by whoever does the wiring, so on a remodel it is the electrical contractor’s and not the homeowner’s.

How long review takes

Auburn says its current review time is about 2 to 3 weeks. When the reviewers ask for corrections, the resubmitted documents go out for another review of about 2 weeks. The cost of a permit depends on the scope of the work, and the fee schedule is on the city’s site.

Permit office

City of Auburn Permit Center

Community Development, Building DivisionMail: 25 West Main Street, Auburn, WA 98001Phone 253-931-3090, option 2
Kitchen, bathroom and basement permits in Auburn
ProjectWhat it takes in Auburn
Kitchen remodelBuilding alterations and plumbing are both on the city's list of work that needs a permit. An L&I electrical permit for new wiring. For a job that is only new cabinets and counters, ask the Permit Center before you start.
Bathroom remodelA permit for the alteration and the plumbing work, and for a replaced window where there is one. An L&I electrical permit for new wiring.
Basement finishingA building permit: finishing a basement is an alteration that adds walls and wiring, and often plumbing. An L&I electrical permit for the wiring.
Drawn from the city's published permit rules. The permit office has the final word on any one project.

Work the city lists as needing no building permit

  • A detached accessory building under 200 square feet, which the city says will likely not need a permit

That building still has to meet the property line setbacks. A deck whose base is more than 30 inches above the existing ground needs a building permit whatever its size. The pages we read give no longer list of exempt work, so call the Permit Center about anything else.

Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs. Our Seattle permit guides explain what turns a simple update into permitted work, room by room: kitchen, bathroom and basement. The office, the forms and the fees are what change in Auburn.

Sales tax

Sales tax on a remodel in Auburn

Auburn is taxed by county. The Washington Department of Revenue lists a combined state and local rate of 10.5% for the King County part of the city and 10.4% for the Pierce County part, for October 1 to December 31, 2026. Seattle’s rate is 10.55%.

On a remodel, the tax is collected on the total contract price. That means labor and the contractor’s markup as well as materials, so it is one of the larger lines in a budget. When you compare bids, ask each bidder whether the number includes it.

The state’s table also lists 9.1% for the King County part of Auburn that lies outside the regional transit district. Your property tax statement shows which county the house is in.

The state can change local rates at the start of each quarter, so check the rate again when you sign.

Sales tax at 10.5% in the King County part of Auburn
Contract priceSales taxTotal
$50,000$5,250$55,250
$100,000$10,500$110,500
$150,000$15,750$165,750
Worked examples at the rate for October 1 to December 31, 2026. The contract prices are round numbers, not quotes.

Costs

What a remodel costs in Auburn

Published job costs, Seattle market, 2025
ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$32,271118.1%
Major kitchen remodel, midrange$95,54253.1%
Major kitchen remodel, upscale$188,40138.7%
Bathroom remodel, midrange$36,14646.8%
Bathroom remodel, upscale$107,45135.3%
Basement remodel$68,35868%
Accessory dwelling unit$210,94432.3%
Remodeling magazine, 2025 Cost vs. Value report. The report has no separate table for Auburn: Seattle is the nearest market it covers. These are survey averages for a standard project, not a quote for your house.

The Cost vs. Value report covers three Washington markets, Seattle, Spokane and Kennewick, so the Seattle table is the nearest published benchmark for Auburn. Typical kitchen projects in the Seattle area run $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.

Add 10.5% sales tax to any of these. What an older house needs behind the walls, such as new wiring, new supply pipes or a floor brought back to level, is priced after a visit and not from a table.

Getting closer to your number

The remodel cost calculator gives a range for your room in a couple of minutes. Our Seattle cost guides go line by line: kitchen, bathroom, basement and ADU and DADU. A written, itemized estimate after a visit is the only price that fits your house.

ADUs and backyard cottages

ADU and DADU rules in Auburn

Auburn replaced its ADU rules with a new chapter of the city code, 18.32, adopted on December 16, 2024 (Ordinance 6959).

An ADU is permitted outright in every residential zone that allows detached houses or middle housing, with a new home or an existing one.

For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction and garage conversions. A home outside the city limits follows its county’s rules instead. For King County, see ADU rules in unincorporated King County.

Accessory dwelling units in Auburn
RuleIn Auburn
How manyTwo on an individually owned lot that meets the zone's minimum lot size: attached, detached or one of each.
SizeNo smaller than 300 square feet and no larger than 1,000, with no more than two bedrooms. Garage space is not counted.
ParkingOne space on the lot for each ADU. None where the lot is within half a mile's walk of a major transit stop.
SellingAn ADU may be sold as a condominium unit, or as a separate property through the city's unit lot subdivision process. It then needs its own water and sewer connection.
SewerEach ADU must be connected to the municipal sewer or served by a septic system.
PaperworkThe owner records a statement on the property's title before the final inspection.
Auburn City Code 18.32.010, adopted by Ordinance 6959 (December 16, 2024).

The sewer capacity charge

King County bills a capacity charge to homes newly connected to a sewer system whose sewage is treated at a King County plant. For an ADU connected in 2026 it is $46.01 a month for 15 years, which is 0.59 of the $77.99 residential rate, or one discounted payment. Your sewer provider can tell you whether your address is in that service area.

What Washington law sets for every city

The state’s ADU law (RCW 36.70A.681) is a floor that a city’s rules cannot go below. Cities in King and Pierce counties had to write it into their codes with the comprehensive plan update that was due by December 31, 2024, and where a local rule still conflicts, the state law overrides it. In Auburn that means:

  • At least two ADUs on a lot where a single-family house is allowed: attached, detached or one of each
  • No rule that the owner must live on the property
  • A size limit of no less than 1,000 square feet for each unit
  • A height limit of no less than 24 feet, unless the main house is held lower
  • No off-street parking requirement within half a mile's walk of a major transit stop
  • An existing building such as a detached garage may be converted, even where it sits inside today's setbacks
  • No ban on selling an ADU as a condominium unit
  • Impact fees of no more than half of what the main house would pay

The limits of the law: it does not apply to a lot with critical areas such as wetlands or steep slopes, a city may refuse an ADU on a lot that is not on public sewer, and a city may restrict short-term rentals.

Your house

What to check before work starts on a house in Auburn

Lots in the floodplain

Auburn sits on the Green and White rivers. Development and redevelopment inside the FEMA regulated floodplain needs a Floodplain Development Permit from the city, under chapter 15.68 of the city code, on top of the building permit. The city publishes a regulatory floodplain map and keeps elevation certificates for many addresses, so it does not take long to find out whether a lot is affected.

Two counties, and addresses outside the city

Auburn lies in both King and Pierce counties. The county decides the sales tax rate and, for a home on a septic system, which county office approves the septic work. The city also keeps a page for checking whether a property is inside the city limits at all. Outside them, permits come from the county and not from the Auburn Permit Center.

Lead paint in houses built before 1978

Under the federal Renovation, Repair and Painting rule, a firm that is paid to disturb painted surfaces in a home built before 1978 must be certified by the EPA as lead-safe and must use lead-safe work practices. Ask any contractor you interview for that certificate.

An asbestos check before any renovation

The Puget Sound Clean Air Agency, whose territory includes King and Pierce counties, requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, unless an owner is surveying the single-family house they live in. The results are shared with everyone who works on the job. Removing friable asbestos takes a notice to the agency first.

Old flooring and wall texture are the usual suspect materials in a kitchen or a bathroom. We look for them at the first visit, so the testing is part of the plan and not a surprise on demolition day. For what else older houses hide, see whole-home remodeling.

Questions

Auburn remodeling questions, answered

01

Do I need a permit to remodel a kitchen or bathroom in Auburn?

For most remodels, yes. Auburn lists building alterations and repairs, plumbing, window replacement, siding and re-roofing among the work that needs a permit. New wiring needs an electrical permit from the Washington State Department of Labor & Industries, because the city does not issue them. The city's advice is to call before you build: the Permit Center is at 253-931-3090, option 2.

02

How long does Auburn take to review a building permit?

The city says its current review time is about 2 to 3 weeks. When the reviewers ask for corrections, the resubmitted plans go out for another review of about 2 weeks. Applications are filed online at MyBuildingPermit.com.

03

Who issues electrical permits in Auburn?

The Washington State Department of Labor & Industries, not the city. L&I issues every electrical permit for a property inside the Auburn city limits and inspects the work. The permit is bought by whoever does the wiring, which on a remodel is the electrical contractor.

04

What is the sales tax on a remodel in Auburn?

It depends on the county the house is in. For October 1 to December 31, 2026 the combined rate is 10.5% in the King County part of Auburn and 10.4% in the Pierce County part. It is collected on the total contract price, labor included. The state can change local rates each quarter.

05

How much does a kitchen remodel cost in Auburn?

Remodeling magazine's Cost vs. Value report has no separate table for Auburn, so its Seattle figures are the nearest published benchmark: in the 2025 edition, $95,542 for a midrange major kitchen remodel and $32,271 for a minor one. Typical full kitchen remodels in the Seattle area land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls starts around $150,000. Sales tax is added to the contract price, at the rate for the county the house is in.

06

Can I build an ADU or a backyard cottage in Auburn?

Yes. Auburn's code allows two accessory dwelling units on an individually owned lot that meets the zone's minimum size: attached, detached or one of each. Each must be between 300 and 1,000 square feet with no more than two bedrooms. One parking space per ADU is required unless the lot is within half a mile's walk of a major transit stop.

07

My address says Auburn. Is the house inside the city limits?

Check before you apply. The city keeps a page for confirming whether a property is inside the Auburn city limits. A home outside them is permitted by King County or Pierce County, not by the Auburn Permit Center, and its sales tax rate is different too.

08

How do I check that a remodeling contractor is registered in Washington?

Look the business up on the Department of Labor & Industries contractor search before you sign anything. A general contractor in Washington must be registered with the state and carry a $30,000 bond and liability insurance. Giant Builders Seattle is registered as GIANTBS782RZ, and anyone can open the record.

Giant Builders in Auburn

Remodeling services in Auburn

Giant Builders Seattle is a licensed general contractor based in Seattle, and Auburn is part of the area we work in. One contract covers the drawings, the permits and the construction.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Free estimate

Planning a remodel in Auburn?

Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

What are you planning?
When would you like to start?

We use your details to answer you. Nothing else.

Sources

  1. 01City of Auburn: Permits, licenses and inspections (read Nov 18, 2026)
  2. 02City of Auburn: Community Development frequently asked questions (read Nov 18, 2026)
  3. 03City of Auburn: Building services and permitting (read Nov 18, 2026)
  4. 04City of Auburn: Floodplain management and flood information (read Nov 18, 2026)
  5. 05Auburn City Code 18.32.010: accessory dwelling unit development standards (read Nov 18, 2026)
  6. 06MyBuildingPermit: the member cities (read Nov 18, 2026)
  7. 07Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
  8. 08Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
  9. 09Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
  10. 10Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
  11. 11Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
  12. 12Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
  13. 13Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)
  14. 14Revised Code of Washington 36.70A.681: accessory dwelling units, limits on local rules (read Nov 18, 2026)
  15. 15Revised Code of Washington 36.70A.680: accessory dwelling units, when cities must comply (read Nov 18, 2026)
  16. 16Revised Code of Washington 36.70A.130: comprehensive plan update deadlines (read Nov 18, 2026)
  17. 17Washington Dept. of Labor & Industries: cities that issue their own electrical permits (read Nov 18, 2026)
  18. 18Washington Dept. of Labor & Industries: electrical permit basics (read Nov 18, 2026)
  19. 19U.S. Environmental Protection Agency: Lead Renovation, Repair and Painting program (read Nov 18, 2026)
  20. 20King County: sewer capacity charge, 2026 rates (read Nov 18, 2026)