What a Sammamish homeowner needs to know before a kitchen, bathroom or basement remodel: how the city takes applications, what the water and sewer districts ask for, the tree rules, what a remodel costs and what the ADU rules allow.

By Giant Builders SeattleUpdated Facts checked Nov 26, 2026

A bathroom with gray stone-look tile, a floating wood and white vanity with two black basins, two round lit mirrors and a freestanding white tub
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short version

Remodeling in Sammamish at a glance

The facts a homeowner in Sammamish asks for first. Each one is explained further down, and the sources are at the end of the page.

Sammamish in brief
QuestionAnswer
Who issues permitsThe City of Sammamish Permit Center, part of the Community Development department, at City Hall.
Where to applyOnline only, at MyBuildingPermit.com. A visit to the Permit Center answers questions, but the city says no permit is issued as a result of a visit.
Electrical and plumbing permitsIssued by the city. Sammamish is one of the cities that run their own electrical permits instead of the state.
Review timeThe city screens an application for completeness within four working days and reviews plans in the order received. It publishes no target for the review itself.
Advice before you applyA Project Guidance request, at no charge, gives code information for your property early in planning.
Sales tax10.3% on the whole contract, labor included, for October 1 to December 31, 2026. Addresses outside the regional transit district pay 8.9%.
ADUsUp to two on a lot with a detached house. A detached unit may be up to 1,000 square feet.

Permits

Who issues remodel permits in Sammamish

The City of Sammamish issues the building, electrical, mechanical and plumbing permits for a house in the city. Every application goes in online at MyBuildingPermit.com, which is open around the clock. The city’s rule of thumb is that new construction and alterations or repairs to a building or its systems need a permit, and its examples include changing a layout, adding on, building or repairing a deck, removing trees, and replacing a water heater or furnace.

How an application moves

  • On MyBuildingPermit.com, choose Apply for Permit, select Sammamish as the jurisdiction and pick the permit type.
  • Within four working days the city sends either an invoice for review fees or an email that lists what is missing.
  • Once the review fees are paid, the plans go into the queue of each department involved (building, planning, public works, water and sewer, fire) and are reviewed in the order received.
  • If the reviewers ask for corrections, the corrected documents must be resubmitted within 90 days.
  • After approval and payment of the issuance fees, the permit and approved plans are posted on MyBuildingPermit.com.

What a remodel application includes

The city’s remodel checklist asks for a signed application, a written narrative of the work (walls to be removed, new bedrooms, new plumbing fixtures in bathrooms and the kitchen, where heat pumps or air conditioners go), a plan set, a fixture count form, a historic resources affidavit and a legal description. Structural calculations are added when load-bearing walls change.

Water and sewer certificates

When a remodel adds plumbing fixtures, or its value exceeds 50% of the assessed value of the property, the city asks for certificates of water and sewer availability from the district that serves the house: Sammamish Plateau Water and Sewer District or Northeast Sammamish Sewer and Water District. A house on a septic system needs preliminary approval from King County Public Health instead of the sewer certificate. Sewer capacity is generally calculated by bedroom count, so a new bedroom matters here.

Working hours

Under SMC 16.05.030, construction is allowed from 7 am to 8 pm Monday to Friday and 9 am to 6 pm on Saturday. There is no construction on Sundays, or on New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving or Christmas.

Permit office

City of Sammamish Permit Center

Sammamish City Hall801 228th Avenue SESammamish, WA 98075

Walk-in hours Monday 9 am to noon, Wednesday 1 to 4 pm and Friday 9 am to noon. Virtual appointments can be booked online. Phone (425) 295-0531.

What needs a permit

Which projects need a permit in Sammamish

By kind of project
ProjectWhat Sammamish requires
Kitchen remodelA permit when the layout changes or walls come out, with city plumbing and electrical permits for new fixtures and circuits. New fixtures can also bring the water and sewer certificates. The regional MyBuildingPermit tip sheet lists replacing a sink without changing the plumbing lines as work that needs no permit.
Bathroom remodelThe regional tip sheet notes that replacing a tub or shower needs a permit, while swapping a sink or toilet without changing the plumbing lines does not. Added fixtures count toward the water and sewer certificate threshold.
Basement finishingA remodel permit. The narrative counts any new bedrooms. The city's checklist notes that sewer capacity is generally calculated by bedroom count. A new bathroom adds plumbing fixtures, which brings the water and sewer certificates.
WallsChanging a load-bearing wall needs structural calculations with the application.
Water heater or furnaceReplacing either needs a permit, the city says.
DecksBuilding or repairing a deck generally needs a permit. A deck less than 30 inches above grade is on the regional tip sheet's list of work Sammamish does not require a permit for.
TreesRemoving a significant tree needs a tree removal permit: a conifer over 8 inches or a deciduous tree over 12 inches in diameter at breast height, and any tree in a critical area or its buffer.

Work that usually needs no building permit in Sammamish

  • Painting and other interior finish work
  • Replacing a sink or toilet without changing the plumbing lines
  • Replacing a portable appliance
  • A deck less than 30 inches above grade
  • Re-roofing with the same type of roofing when the sheathing is not altered, or an overlay up to two layers
  • Replacing a window or door in kind, with energy code values, safety glazing and egress kept
  • A one-story detached shed or playhouse up to 200 square feet
  • Replacing non-structural siding, except stucco, veneer and EIFS

From the MyBuildingPermit construction tip sheet 00 (June 11, 2026), written with its member cities, Sammamish among them. On a lot with a critical area, shoreline or sensitive area, ask the city before relying on it. Work must still meet the code and the zoning rules.

Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.

Timing

How long a permit takes in Sammamish

Sammamish does not publish a target number of days for plan review. Its permitting process sheet says review times vary with the scope of the project and the number of permits in the queue, and that plans are reviewed in the order they come in. Status can be followed on MyBuildingPermit.com.

What the city does commit to is the paperwork around the review: a completeness screening within four working days of the first submittal, and again within four working days of each resubmittal. A complete first package, with the water and sewer certificates already in hand where they apply, avoids another round of screening.

What the city publishes
Step or routePublished figure
Completeness screeningWithin 4 working days
Plan reviewNo published target; first come, first served
Corrections due backWithin 90 days of the request
Screening of corrected plansWithin 4 working days
City of Sammamish, permitting process sheet.

Cost

What a remodel costs in Sammamish

Published job costs, Seattle market, 2025
ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$32,271118.1%
Major kitchen remodel, midrange$95,54253.1%
Major kitchen remodel, upscale$188,40138.7%
Bathroom remodel, midrange$36,14646.8%
Bathroom remodel, upscale$107,45135.3%
Basement remodel$68,35868%
Remodeling magazine, 2025 Cost vs. Value report. The report has no separate table for Sammamish: Seattle is the nearest market it covers. These are survey averages for a standard project, not a quote for your house.

No public cost survey breaks out Sammamish on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.

Sales tax in Sammamish

Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Sammamish is 10.3% for October 1 to December 31, 2026. Addresses outside the Regional Transit Authority district pay 8.9%. On a $100,000 contract, 10.3% is $10,300 of tax. The state can change local rates each quarter, so check the rate again when you sign.

Getting closer to your number

The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.

ADUs and backyard cottages

ADU rules in Sammamish

Sammamish allows up to two accessory dwelling units on a lot with a detached house: two attached, two detached, one of each, or a unit made by converting an existing structure. The city points to SMC 21.05.010.C, footnote 5 of its use table, for the rules.

In September 2025 the city issued a director’s code interpretation (COD2025-00639) that an ADU must have its own entrance, separate from the main house. Under state law (RCW 36.70A.681) the city may not require the owner to live on the lot.

For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.

Accessory dwelling units in Sammamish
RuleIn Sammamish
How manyUp to two on a lot with a detached house, attached or detached in any mix
Detached sizeUp to 1,000 square feet
Attached sizeUp to 50% of the house or 1,000 square feet, whichever is larger
Floor area ratioADUs do not count toward the house's floor area ratio
Height24 feet for a detached ADU. 35 feet for an ADU attached to another structure, such as a garage
ParkingNo added parking when the lot already has four or more spaces, counting the garage and driveway
EntranceA separate entrance is required
City of Sammamish ADU page (SMC 21.05.010.C, footnote 5) and code interpretation COD2025-00639 (September 30, 2025). Setbacks depend on the zone: confirm them for your lot.

State and regional rules

Rules that apply in Sammamish and across the region

These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.

Check for asbestos before demolition

The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.

Sales tax covers labor too

For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.3% in Sammamish this quarter. Ask every bidder whether the price they quote includes it.

Hire a registered contractor

Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.

Giant Builders in Sammamish

Remodeling services in Sammamish

Giant Builders Seattle is a licensed general contractor based in Seattle, and Sammamish is part of the area we work in. One company handles the design, the permits and the construction.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Sammamish remodeling questions, answered

01

Do I need a permit to remodel my kitchen in Sammamish?

Usually, yes. Sammamish says alterations to a house or its systems need a permit, and changing a layout is one of its examples. New plumbing fixtures and new circuits need city plumbing and electrical permits, and added fixtures can require water and sewer availability certificates from the district. Painting and other finish work, and swapping a sink without changing the plumbing lines, need no permit.

02

Do I need a permit to replace a water heater in Sammamish?

Yes. The city lists replacing a water heater or a furnace among the work that needs a permit. Apply online at MyBuildingPermit.com and choose Sammamish as the jurisdiction.

03

How long does a remodel permit take in Sammamish?

The city does not publish a target for plan review. It screens a new application for completeness within four working days, then reviews plans in the order received, and says review times vary with scope and the number of permits in the queue. Corrections must be resubmitted within 90 days. Status can be followed on MyBuildingPermit.com.

04

How do I apply for a remodel permit in Sammamish?

Online, at MyBuildingPermit.com: choose Apply for Permit, select Sammamish and pick the permit type. For property-specific answers before you apply, the city offers a free Project Guidance request. The Permit Center at City Hall, 801 228th Avenue SE, has walk-in hours on Monday and Friday mornings and Wednesday afternoons. When you hire us, we prepare and file the application.

05

What is the sales tax on a remodel in Sammamish?

10.3% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,300. Addresses outside the Regional Transit Authority district pay 8.9%. The state can change local rates each quarter.

06

Can I remove trees during a remodel in Sammamish?

Significant trees need a tree removal permit: conifers over 8 inches and deciduous trees over 12 inches in diameter at breast height, and any tree in a critical area or buffer. On a lot under a quarter acre, the most that may be removed is the lowest of 2 trees a year, 6 in 10 years, or half the significant trees over 10 years. On a development site, no tree may come down until the construction permit is issued.

07

How much does a kitchen remodel cost in Sammamish?

No published cost survey covers Sammamish alone. The nearest benchmark is Remodeling magazine's 2025 Cost vs. Value report for Seattle: $32,271 for a midrange minor kitchen remodel and $95,542 for a midrange major one. Seattle-area contractors published ranges of $75,000 to $130,000 for a full kitchen remodel in 2026. Sales tax of 10.3% comes on top, or 8.9% at addresses outside the regional transit district.

08

Can I build an ADU in Sammamish?

Yes. Sammamish allows up to two ADUs on a lot with a detached house. A detached unit may be up to 1,000 square feet; an attached one up to half the size of the house or 1,000 square feet, whichever is larger. ADUs do not count toward the house's floor area ratio, and since September 2025 the city requires each ADU to have its own entrance.

Free estimate

Planning a remodel in Sammamish?

Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.