Which energy code applies to a remodel in Washington?

The 2021 edition of the Washington State Energy Code, Residential Provisions (often shortened to WSEC-R), adopted by the State Building Code Council as chapter 51-11R of the Washington Administrative Code. It took effect in every city and county on March 15, 2024, later than the July 1, 2023 date first set. It covers houses, duplexes and townhouses, and its Chapter 5 sets the rules for existing buildings: additions, alterations, repairs and changes of use.

The next edition is on its way. The council's published schedule for the 2024 codes, revised August 14, 2026, gives an implementation date of Monday, May 3, 2027, and the council's adoption page still listed the final rule as pending when read on November 26, 2026. Under RCW 19.27.095, a complete building permit application is considered under the codes in effect on the day it is filed, so a complete application filed before the new code takes effect is reviewed under the 2021 code.

Does a remodel have to bring the whole house up to code?

No. Section R501.1.1 says unaltered portions of an existing building do not have to comply with the code. Section R503.1 says an alteration must meet the new construction requirements for the work being done, and must leave the house using no more energy than it did before. A kitchen remodel that never opens an outside wall can leave that wall's old insulation alone.

The code also gives the building official room to approve less than full compliance where full compliance is physically impossible or economically impractical, provided the alteration improves the house's efficiency or is needed for health and safety. Section R501.6 lets the code official modify requirements for historic buildings, and Seattle adds a similar section for city landmarks.

What insulation is required when walls or ceilings are opened?

Fill the cavities you open. Exception 2 to section R503.1.1 lets existing ceiling, wall and floor cavities exposed during construction skip the new-house tables, provided they are filled with insulation. Framed walls have minimums: R-15 in a 2x4 wall and R-21 in a 2x6 wall. This is the rule that touches most Seattle-area remodels, because older houses often have little or no insulation in the walls.

Common remodel situations under section R503.1.1 of the 2021 WSEC-R
What the work doesWhat the code asks
Opens a 2x4 wall to the studsFill the cavity: at least R-15
Opens a 2x6 wall to the studsFill the cavity: at least R-21
Opens a ceiling or floor cavityFill the cavity with insulation
Leaves the wall, roof or floor cavity closedNo insulation upgrade required for that assembly
Re-roofs over a roof with no insulation in the cavity, exposing the sheathingInsulate above or below the sheathing
Adds storm windows over existing windowsAllowed without meeting the window table

WAC 51-11R-50300, section R503.1.1 and its exceptions. These exceptions apply only where the building's energy use is not increased.

Opening a wall usually means other trades have been in it too. The insulation goes in after the rough wiring and plumbing are inspected and before drywall, so plan the insulation inspection into the schedule. The knob-and-tube wiring article explains why old wiring and new insulation have to be sorted out together.

What do replacement windows have to meet?

A U-factor of 0.30 or lower. Section R503.1.1.1 says that when all or part of a window is replaced with a new product, including sash and glazing, the new unit must meet the U-factor in Table R402.1.3: 0.30 for windows and 0.50 for skylights. The U-factor measures heat loss through the whole window; the lower the number, the less heat escapes. Where several windows are replaced, an area-weighted average of their U-factors may be used. Replacing only the glass in an existing sash and frame is treated as a repair, not an alteration.

What does the energy code ask of an addition?

An addition meets the code for new construction, without forcing the rest of the house to comply. Section R502.3.1 sends its walls, roof, floor and windows to the same tables a new house uses, and to the same air sealing rules. Seattle-area counties, including King, Snohomish, Pierce and Kitsap, are in climate zone Marine 4, and Washington's table covers it in a single column with zone 5.

Table R402.1.3: minimum insulation and maximum window U-factors, climate zone 5 and Marine 4
Part of the additionRequirement
WindowsU-factor 0.30
SkylightsU-factor 0.50
CeilingR-60, or R-49 where its full height extends over the wall top plate at the eaves; R-38 in a single rafter- or joist-vaulted ceiling with full depth over the top plate
Wood-frame wallR-20 cavity plus R-5 continuous, or R-13 cavity plus R-10 continuous
FloorR-30
Below-grade wallR-10 continuous outside, or R-15 continuous inside, or R-21 cavity with an R-5 thermal break at the slab
SlabR-10 to a depth of 4 feet; R-10 continuous under a heated slab

WAC 51-11R-40213 and section R402.2.1 of the 2021 WSEC-R. Continuous insulation is a layer that runs unbroken over the framing.

Additions also earn energy credits under section R406: points for choices beyond the basic tables, such as the type of heating or more efficient equipment and envelope. An addition of 150 square feet or less is exempt. One from 150 to 500 square feet needs 2.0 credits, and one over 500 but under 1,500 square feet of heated floor area needs 5.0. The house's heating type counts toward the total under Table R406.2: a heat pump earns 3.0 credits, a heat pump with furnace or resistance backup 1.5, electric resistance alone 0.5, and a gas furnace 0. The code does not state a figure for an addition of 1,500 square feet or more, so the designer confirms it with the city.

  • An addition of 500 square feet or more of conditioned floor area must pass a blower door test for air leakage. The limit is 4.0 air changes per hour, or 7.0 for the addition and house tested together when the house was built before the 2009 state energy code.
  • Where an addition over 150 square feet adjoins existing ceilings with attic space, that existing attic must also meet the code's insulation rules.
  • Turning unheated space, such as a garage or an unheated basement, into heated space counts as an addition. SDCI's note in Seattle's code says so, and adds that an ADU created inside space that is already heated needs no energy credits.

What about heating, ducts, water heaters and lights?

New systems installed as part of a remodel meet the code; old ones you keep do not have to. Section R503.1.2 sends new heating, cooling and duct systems to the code's mechanical section, which includes sizing the equipment by calculation and leak testing ducts. Where existing ducts are only extended, runs of less than 40 linear feet in unconditioned space need not be tested, and existing ducts sealed or insulated with asbestos are exempt from testing.

  • Water heaters. A new water heating system meets section R403.5, but a replacement water heater does not have to move inside the insulated part of the house.
  • Lighting. New permanently installed lighting must use only high-efficacy sources, such as LED. A remodel that replaces less than 10 percent of the fixtures in a space, without raising its lighting power, is exempt.
  • Separate units. Where a remodel creates an accessory dwelling unit, its heating and cooling must be controlled by its own programmable thermostat.

How does the energy code affect a Seattle permit?

It can decide which permit you get. Seattle's quick subject-to-field-inspection (STFI) permit is not available for additions and new accessory structures that do not meet the prescriptive requirements of the Seattle Energy Code, according to SDCI Tip 316, updated October 29, 2026. A design that trades a weaker wall for a stronger ceiling, using the code's calculation paths instead of the tables, goes to full plan review. The permit timelines article explains what that does to the schedule.

  1. 01

    Drawings

    Floor plans and wall sections show the insulation R-values and window U-factors; Tip 316 lists both among what an STFI floor plan must show.

  2. 02

    Credits

    For an addition over 150 square feet, the drawings list the energy credit options chosen and their points, as section R406.3 requires.

  3. 03

    Inspection

    The inspector checks insulation in the open walls before drywall, and windows against their labels.

  4. 04

    Testing

    Additions of 500 square feet or more get a blower door test, and new duct systems a duct leakage test, before final inspection.

Outside Seattle the same state code applies, enforced by each city's building department; see the local remodel guides. For what the extra insulation and windows cost in a kitchen or bathroom project, the remodel cost calculator gives ranges.