Topic · 6 articles

Planning and hiring

How to choose a builder, set up the project and live through it.

  1. 01Design-Build or Architect First for a Seattle RemodelIn Washington, a design-build remodel puts design and construction under one contract with one firm, so the builder prices the work while it is being designed. An architect-first remodel uses separate contracts: an architect or designer draws the project, then contractors bid on the same drawings. State law (RCW 18.08.410) does not require an architect for a house of up to four units, and Seattle says house drawings rarely need a stamp, but a beam longer than the city's span limits needs a structural engineer.9 min read
  2. 02Questions to Ask a Remodeling Contractor in WashingtonBefore hiring a remodeling contractor in Washington, ask for the L&I registration number and check it, then ask who will do the work, which permits the job needs and who will apply for them, what the written bid includes (sales tax, permit fees, materials), how changes are priced and approved, and what each payment is tied to. L&I advises at least three written bids, a written contract, a reasonable down payment and lien releases before the final payment. For residential work of $1,000 or more, the contractor must give you the state's disclosure statement before work starts.9 min read
  3. 03Change Orders on a Remodel and How to Keep Them SmallA change order is a written amendment to a remodeling contract that changes the work, the price or the schedule. In Washington, L&I advises that the contract spell out how changes are handled and that every change in materials or scope be put in writing. Changes come from late decisions, conditions found behind walls and inspector requirements. In Seattle, a change to approved plans may need a permit revision, which costs at least one hour of review ($292 in 2026), and sales tax applies to the added price.9 min read
  4. 04Living at Home During a Remodel: Dust, Noise and KitchensYou can usually live at home during a remodel if you keep a bedroom, a bathroom and some way to cook outside the work area, and the work area is sealed off. In a house built before 1978, firms paid to disturb paint must be lead-safe certified, use lead-safe work practices and verify their cleanup. In Seattle, the noise code allows construction from 7 a.m. to 10 p.m. on weekdays and 9 a.m. to 10 p.m. on weekends in most residential areas, and jackhammers only from 8 a.m. (9 a.m. on weekends) to 5 p.m.9 min read
  5. 05When to Start a Remodel in Seattle: Permits and RainIn Seattle, an interior remodel can start in any month, but work that opens the roof, the outside walls or the ground is easiest from June to September: NOAA's 1991 to 2020 normals put only 4.63 of Sea-Tac's 39.34 inches of yearly precipitation in those four months. Count back from that start. SDCI screens a small STFI permit in a few days, but on November 26, 2026 its dashboard showed 64 days in city control for three in four house addition and alteration permits, and the city says applicants experience about twice that.9 min read
  6. 06Remodel Planning Checklist: From First Idea to WalkthroughA remodel in the Seattle area runs in nine stages: define the project, set the budget, learn what the house and lot allow, choose a design path and a builder, sign a complete contract, get the permits and hazard checks, prepare the household, build with inspections, and close out. The checks that protect you most come from state law and agencies: L&I registration, at least three written bids, the RCW 18.27.114 disclosure statement, the asbestos survey before renovation, inspections before walls close, and lien releases before the final payment.9 min read