Step 1: What do you want the remodel to do?

Start with the problem, not the finishes. Washington's Department of Labor & Industries (L&I) puts planning first in its hiring advice: know your budget and separate what you want from what you need.

Step 2: How much can you spend, and how will you pay?

Set a number you are comfortable with and a number you will not go past. For scale, Remodeling magazine's 2025 Cost vs. Value report puts a midrange major kitchen remodel in Seattle at $95,542 and a midrange bathroom remodel at $36,146. Your house and your choices set the real figure.

  • Get a sense of the range with the remodel cost calculator and how to set a realistic remodel budget
  • Add Washington sales tax, which applies to the whole contract, labor included: 10.55% in Seattle for October 1 to December 31, 2026
  • Add permit fees, design, engineering and any temporary housing
  • Keep a reserve outside the contract for what the house turns up
  • Decide how you will pay; see paying for a remodel
  • If a lender is involved, ask how it pays out during the job

Step 3: What do the house and the lot allow?

Learn what you are working with before anyone draws. The Seattle Department of Construction and Inspections (SDCI) lists this research as the first step toward a permit.

  • Find the year the house was built. A house built before 1978 may have lead paint, which changes how painted surfaces can be disturbed; see lead-safe renovation
  • Read what houses of that age tend to hide in what is behind your walls, and the guides to knob-and-tube wiring, galvanized pipes and seismic bolting and bracing
  • Look up the zoning and any environmentally critical area, such as a steep slope, on SDCI's GIS map
  • Check past permits and any violations on the property in the Seattle Services Portal
  • Check whether the house is a Seattle landmark or in one of the city's eight historic districts, where a Certificate of Approval is needed before changes are made
  • Read your condominium or homeowner association rules for any approval they require
  • For an addition or a backyard cottage, read Seattle's tree rules and the Seattle ADU rules
  • In Seattle, book SDCI's free 20-minute video coaching session for permit questions

Step 4: How will it be designed, and who will build it?

Choose the design path, then check builders the same way. In a design-build remodel one firm designs and builds under one contract; on the architect-first path you hire a designer and put the drawings out to bid. Washington does not require an architect for a house of up to four units (RCW 18.08.410), but beams beyond Seattle's span limits need a structural engineer. L&I advises verifying every contractor's registration, bond, insurance and history, getting at least three written bids and checking references.

Step 5: What must be settled in the contract?

Everything you agreed on, in writing, before work starts. L&I's list for a complete contract: the price including sales tax, payment terms and completion date, permit fees, the specific work, the materials, major suppliers and subcontractors, warranties and the change order process.

  • Scope, materials and allowances, itemized
  • The price with sales tax, and who pays the permit fees
  • A payment schedule tied to completed work, not dates; see deposits, draws and lien rules
  • Start and completion dates
  • How change orders are priced and approved; see change orders
  • Warranty terms
  • How cleanup and cost overruns will be handled, agreed in writing as L&I advises
  • The state's disclosure statement, required before work starts on residential jobs of $1,000 or more (RCW 18.27.114), signed and in your file
  • If you signed at home, whether the FTC's three-day Cooling-Off Rule applies

Step 6: Which permits and checks come before work starts?

The permits, plus the hazard checks the rules require before demolition. A contractor asking you to pull the permit yourself is on L&I's list of warning signs.

  • Find which permits the project needs with the permit navigator, or the Seattle guides for kitchens, bathrooms and basements
  • Know the expected wait: a few days for Seattle's STFI screening, months for full review; see permit timelines and when to start a remodel
  • Check what the energy code asks of the new work
  • Get the asbestos survey before any renovation, as the Puget Sound Clean Air Agency requires; see asbestos surveys
  • In a house built before 1978, confirm the firm is lead-safe certified and that you received EPA's Renovate Right pamphlet, which Washington requires no more than 60 days before work begins
  • Before any digging, make sure the excavator notifies 811 at least two full business days ahead, as RCW 19.122.030 requires; underground lines you own on your property are yours to locate
  • If the project changes the electrical service, ask whether Seattle City Light has to be involved
  • Post the permit where it can be seen on site, as SDCI requires

Step 7: How do you get the household ready?

Plan the weeks of construction before demolition day. The details are in living at home during a remodel.

  • Decide whether to stay, or move out for some or all of the work
  • Set up a temporary kitchen, or line up another bathroom, outside the work area
  • Clear the work area and the crew's path, and lock away valuables
  • Arrange a safe place for pets, and keep children out of the work area
  • Call your home insurer to ask how the remodel affects your policy
  • Tell the neighbors the start date and the hours; Seattle allows construction from 7 a.m. to 10 p.m. on weekdays and 9 a.m. to 10 p.m. on weekends in most residential areas
  • If a dumpster will sit in a Seattle street, confirm someone has the SDOT Street Use permit
  • Agree on keys, parking and how you will communicate

Step 8: What should you do while the work is underway?

Stay in touch, keep records and pay for finished work. L&I's advice for the middle of a project:

  • Check in often: look at completed work, confirm the schedule and make sure inspections are scheduled
  • Make sure required inspections happen before work is covered up
  • Keep copies of permits and confirmations of every inspection
  • Put any change in materials or scope in writing, with its price, before the work is done
  • Pay at milestones, such as the foundation pour, framing or the roof, rather than on a calendar
  • Get a receipt or other proof for every payment
  • Remember that you remain responsible for making sure subcontractors and suppliers are paid, even after paying the contractor in full, and collect lien releases as the job goes

Step 9: How do you close out the job?

The job is done when the city has signed off and the paperwork is in your hands. SDCI says single-family and duplex projects never need a certificate of occupancy; each permit needs a final approved inspection.

  1. 01

    Final inspections

    Each permit, whether building, electrical or plumbing, gets its final approved inspection.

  2. 02

    Walkthrough and punch list

    Walk every room with the contractor and list what still needs fixing or finishing.

  3. 03

    Punch list finished

    Check each item yourself before the last payment.

  4. 04

    Lien releases

    Get completed lien releases from all major subcontractors and suppliers before the final payment, as L&I advises. It publishes a sample form, F625-029-000.

  5. 05

    Final payment

    Pay the balance once the work is complete and you are satisfied, and get a receipt.

  6. 06

    One file of papers

    The contract, permits and inspection records, receipts, change orders, lien releases, the warranty, manuals and paint colors, kept together.

If a problem turns up later, start with the contractor and the warranty. For owner-occupants, L&I's Homeowner Recovery Fund can pay up to $25,000 per claim after a court judgment against a registered contractor.

Giant Builders Seattle starts with a free in-home estimate, ends every job with a walkthrough, and backs its work with a 5-year workmanship warranty.