Skip to the content

Topic · 6 articles

Permits and rules

What needs a permit, how long review takes and the state rules behind the work.

  1. 01How Long Remodel Permits Take in Seattle and the EastsideIn Seattle, a small remodel that qualifies for a subject-to-field-inspection permit is usually processed within a few working days, and many electrical permits are issued the same day online. A remodel that needs full plan review takes longer: SDCI aims to finish the first review of a simple application in 2 to 3 weeks and a complex one in 8. Bellevue's target for a first review of a single-family remodel is 14 days, Kirkland's runs from 3 business days to 4 weeks by review track, and Redmond publishes no target.10 min read
  2. 02How to Check a Contractor in Washington Before You HireIn Washington, every construction contractor must register with the Department of Labor and Industries (L&I), carry a bond of $30,000 for a general contractor or $15,000 for a specialty contractor, and carry liability insurance. You can check all of it for free with L&I's Verify tool by searching the contractor's name, registration number or UBI. The record shows whether the registration is active, the bond and insurance on file, lawsuits against the bond, license violations, workers' comp accounts and safety inspections. Check it before you sign and again before the work starts.9 min read
  3. 03Asbestos Surveys Before a Remodel in the Puget Sound AreaIn King, Pierce, Snohomish and Kitsap counties, the Puget Sound Clean Air Agency requires an asbestos survey of the materials a renovation will disturb before the work starts, whatever the age of the house. An AHERA-certified building inspector must do it, except that an owner who lives in a single-family house may survey it personally for a remodel. Demolishing a house always takes an inspector's survey, a notice to the agency and a 10 day wait. An owner may remove asbestos from the house they live in; elsewhere a certified contractor must.9 min read
  4. 04Lead-Safe Renovation Rules for Pre-1978 Homes in WashingtonIn Washington, anyone paid to renovate, repair or paint in a home built before 1978 must follow the state's lead Renovation, Repair and Painting program, run by the Department of Commerce under chapter 365-230 WAC in place of EPA's federal program. The firm must be certified, a certified renovator must direct the work, and the owner must get the Renovate Right pamphlet no more than 60 days before work starts. Jobs that disturb no more than 6 square feet of paint per room inside, or 20 square feet outside, are exempt unless windows are replaced.7 min read
  5. 05What Washington's Energy Code Means for a RemodelIn Washington, a remodel follows the 2021 Washington State Energy Code, Residential Provisions, in force since March 15, 2024. It does not make you upgrade parts of the house you leave alone. But wall, ceiling and floor cavities opened during the work must be filled with insulation, at least R-15 in 2x4 walls and R-21 in 2x6 walls, and replacement windows must meet a U-factor of 0.30. An addition must meet the code for new houses, and one over 150 square feet must also earn energy efficiency credits. Seattle uses the same rules.9 min read
  6. 06Seattle Tree Rules for Additions and Backyard CottagesSeattle's tree code, SMC chapter 25.11, sorts trees 6 inches or more in trunk diameter into four tiers. For an addition or backyard cottage in a Neighborhood Residential zone, Tier 3 and Tier 4 trees may be removed under the permit, Tier 3 with replacement. A Tier 2 tree, 24 inches or more, may go only if keeping it would block the zone's 50 percent lot coverage, leave part of a home under 10 feet wide, or block required access or utilities. Heritage trees stay unless hazardous. Without a project, two Tier 4 trees may go in three years.9 min read