Skip to the content

Design-build remodeling · Seattle & the Eastside

One team draws it, permits it and builds it.

Kitchens, bathrooms, basements, additions and backyard cottages across Seattle and the Eastside. A written, itemized price before work starts, and one project manager from the first visit to the final walkthrough.

Google 5.0 (6 reviews)Thumbtack 4.8 (23 reviews)

Kitchen remodel no. 2: after
Kitchen remodel no. 2: before
BeforeAfter
Drag the line: the same kitchen, before and after103 pairs →
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

Sheet 02 · Before and after

The same room, before the work and after.

Giant Builders project photos, shown without addresses or names. Pick a room type, pick a project and drag the line.

Kitchen remodel no. 7: after
Kitchen remodel no. 7: before
BeforeAfter

Drag the line to compare. Each pair is the same room, before and after.

Sheet 03 · How a project runs

Five steps, in this order, every time.

  1. 01

    A visit at your home

    Free. We measure, look at what can be seen of the wiring, plumbing and structure, and listen to how you want to use the space.

  2. 02

    Design and a written price

    Drawings, material choices and an itemized estimate, so you decide with the whole picture in front of you.

  3. 03

    Permits, filed by us

    We prepare the drawings the city needs, file the application and meet the inspectors on site.

  4. 04

    The build

    One project manager, a schedule before work starts, dust protection, and a clean site at the end of each day.

  5. 05

    The walkthrough

    We go through the finished work with you room by room. The 5-year workmanship warranty covers what our crews built.

From the first visit to the walkthrough: one project manager
  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Quoted as posted. Counts as of November 18, 2026.

Sheet 08 · Questions

The short answers.

More in the full questions and answers page.

Questions and answers
01

Who is Giant Builders Seattle?

Giant Builders Seattle LLC is a Washington general contractor (license GIANTBS782RZ, UBI 604991679) that designs, permits and builds home remodels: kitchens, bathrooms, basements, whole homes, additions, ADUs and garage conversions, in Seattle, the Eastside and south King County. Its registration is public on the Washington Department of Labor & Industries record.
02

Where does Giant Builders work?

In Seattle, Bellevue, Kirkland, Redmond, Mercer Island, Renton, Issaquah, Sammamish, Bothell, Woodinville, Shoreline, Lake Forest Park, Edmonds, Lynnwood, Burien, Tukwila, Kent, Auburn, Federal Way and Tacoma. Each of the larger cities has a local remodel guide on this site with its permit office, tax rate and ADU rules.
03

What does a remodel cost in Seattle?

Remodeling magazine's Cost vs. Value report for Seattle (2025) puts a midrange minor kitchen remodel at $32,271, a midrange major kitchen remodel at $95,542, a midrange bathroom remodel at $36,146 and a basement remodel at $68,358. Real projects vary with size, structure and finishes; the cost guides and calculators on this site show the ranges and what moves them. Washington sales tax applies to the whole contract, labor included.
04

Does Giant Builders pull the permits?

Yes. We prepare the drawings the city asks for, file the application, answer the plan reviewer and meet the inspectors on site. Many cosmetic remodels need no building permit at all; the permit guides explain where the line is in each city.
05

How do I get a price?

Call (425) 757-7872 or send the estimate form. We visit your home for free, measure, and send a written, itemized estimate so you can compare it line by line.