Skip to the content

Local remodel guide · King and Snohomish Counties

Home remodeling in Bothell, WA

What a Bothell homeowner needs to know before a kitchen, bathroom or basement remodel: how to apply, how long review takes, why the county line matters, what a remodel costs and what the ADU rules allow.

By Giant Builders SeattleUpdated Facts checked Nov 26, 2026

A large family room with wood floors, a leather sectional sofa, a bar with tall stools and a pool table on a patterned rug
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short version

Remodeling in Bothell at a glance

The facts a homeowner in Bothell asks for first. Each one is explained further down, and the sources are at the end of the page.

Bothell in brief
QuestionAnswer
Which countyBoth. Bothell lies in King County and Snohomish County. The county line sets the sales tax rate and which health agency approves septic work. The city issues the permits on both sides of the line.
Who issues permitsThe City of Bothell Permit Center at City Hall issues building, plumbing and mechanical permits.
Electrical permitsFrom the Washington State Department of Labor & Industries (L&I), not the city.
Where to applyOnline only, at MyBuildingPermit.com.
Review timeAbout 3 weeks for the first review of an interior remodel and 4 weeks for an addition, then 2 to 3 weeks per later round. Mechanical and plumbing permits the same day.
Sales tax10.3% in the King County part of Bothell and 10.5% in the Snohomish County part, on the whole contract, labor included, for October 1 to December 31, 2026.
ADUsUp to 1,200 square feet. State law requires the city to allow at least two per lot.

Permits

Who issues remodel permits in Bothell

Bothell’s Permit Center, part of the city’s Development Services, issues the building, plumbing and mechanical permits for a house anywhere in the city, on either side of the county line. Permit and land use applications are accepted online only, at MyBuildingPermit.com, and fees are invoiced there. For a remodel, the fee is based on the value of the work. The city’s general rule: new construction, remodels and repairs to a building or its systems need a permit, and so does replacing a water heater or a furnace.

Electrical permits come from the state

Bothell does not issue electrical permits. They come from L&I, and many can be bought online. The nearest L&I office is in Bellevue.

What a remodel application includes

On MyBuildingPermit.com the path is Building, then Single Family Residential, then the activity type. The city’s checklist for additions and alterations asks, depending on the job, for a plumbing and mechanical fixture count, structural calculations for a story addition, the state energy code form (alterations that add no heated area may be exempt), a soils report where a sensitive area is affected, and a site plan with a hard surface coverage table. An interior-only remodel needs no site plan.

Water, sewer and septic

An addition needs a fire flow letter from the water provider, and fire sprinklers may be required where enough fire flow is not available. Growing a house’s floor area by more than 60% also needs a water and sewer availability certificate. Where the City of Bothell is the provider, its certificate takes about two weeks and must be in hand before the permit application; where Alderwood, Northshore or Woodinville serves the house, the certificate comes from that provider. On a septic system, an addition or a new bedroom needs approval from King County Public Health or the Snohomish Health District, depending on the county.

Permit office

City of Bothell Permit Center

Bothell City Hall, main floor18415 101st Avenue NEBothell, WA 98011

Walk-in Monday to Thursday 8 am to noon and 1 to 4 pm, Friday 8 am to noon. Phone 425-806-6400, email permits@bothellwa.gov.

What needs a permit

Which projects need a permit in Bothell

By kind of project
ProjectWhat Bothell requires
Kitchen remodelA building permit for a remodel, plus city plumbing and mechanical permits for new or moved fixtures and vents, and an L&I electrical permit for wiring. Cabinets, countertops and similar finish work are exempt.
Bathroom remodelA building permit, a city plumbing permit and an L&I electrical permit. Replacing a fixture without changing valves or pipes is exempt under BMC 20.02.095. The regional MyBuildingPermit tip sheet notes that replacing a tub or shower needs a permit.
Basement finishingA building permit with plans and the state energy code form. Adding a bedroom to a house on septic needs health district approval first.
AdditionsA building permit with a site plan, a hard surface coverage table and a fire flow letter, plus structural calculations for a new story. First review takes about 4 weeks.
Water heater or furnaceReplacing either needs a permit, the city says.
DecksNo permit for a deck no more than 30 inches above grade, not over a basement or story and not part of an accessible route. It must still meet the setbacks.
TreesNo tree permit is generally needed on an existing lot under 20,000 square feet with no critical areas, once the subdivision is more than 5 years old. Trees in wetlands, streams, slopes over 40% or the shoreline area need the city's approval.

Work that usually needs no building permit in Bothell

  • Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
  • A deck, sidewalk or driveway no more than 30 inches above grade, not over a story below
  • A fence up to 6 feet high
  • A one-story detached shed or playhouse up to 200 square feet and 12 feet tall
  • Replacing non-structural siding, except veneer, stucco and EIFS
  • Replacing windows in kind with no structural change, meeting energy code values
  • A roofing overlay that leaves no more than two layers
  • Fixing leaks, and replacing prefabricated fixtures without changing valves or pipes

From the City of Bothell's Work Exempt from Permit handout (BMC 20.02.095.B, updated February 2023). The regional MyBuildingPermit tip sheet (June 2026) lists a tear-off re-roof as needing a permit in Bothell, so ask before you re-roof.

Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.

Timing

How long a permit takes in Bothell

Bothell publishes processing times for each kind of permit, measured to the end of the first review. Each later round, for corrections or for a revision after the permit is issued, has its own time.

The city adds a warning on the same sheet: the times always vary with workload, and in busy periods it says to add one to two weeks or more. Where a permit stands can be checked at any time on MyBuildingPermit.com.

An interior remodel with one round of corrections therefore comes to roughly 5 to 6 weeks of city review, plus the time it takes to answer the corrections.

What the city publishes
Step or routePublished figure
Single-family remodel, interior onlyFirst review 3 weeks, each later review 2 to 3 weeks
Single-family additionFirst review 4 weeks, each later review 2 to 3 weeks
New houseFirst review 4 weeks, each later review 2 to 3 weeks
DeckFirst review 3 weeks, each later review 2 to 3 weeks
Mechanical or plumbing permitSame day
Re-roofSame day
City of Bothell, permit processing time sheet (updated September 2025). The city says to add one to two weeks or more when permit volumes are high.

Cost

What a remodel costs in Bothell

Published job costs, Seattle market, 2025
ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$32,271118.1%
Major kitchen remodel, midrange$95,54253.1%
Major kitchen remodel, upscale$188,40138.7%
Bathroom remodel, midrange$36,14646.8%
Bathroom remodel, upscale$107,45135.3%
Basement remodel$68,35868%
Remodeling magazine, 2025 Cost vs. Value report. The report has no separate table for Bothell: Seattle is the nearest market it covers. These are survey averages for a standard project, not a quote for your house.

No public cost survey breaks out Bothell on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.

Sales tax in Bothell

Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Bothell is 10.3% for October 1 to December 31, 2026. That is the rate in the King County part of Bothell. The Snohomish County part pays 10.5%. On a $100,000 contract, 10.3% is $10,300 of tax. The state can change local rates each quarter, so check the rate again when you sign.

Getting closer to your number

The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.

ADUs and backyard cottages

ADU rules in Bothell

Bothell’s ADU rules are in BMC 12.14.135, in the zoning code the council approved with the 2024 comprehensive plan update on December 10, 2024. The new zoning took effect on January 1, 2025. An ADU is built on a single-family building permit, applied for on MyBuildingPermit.com under the accessory dwelling unit activity type.

The city’s ADU checklist (updated December 2025) gives the size and height limits below. It does not repeat how many units a lot may have. State law (RCW 36.70A.681) requires cities to allow at least two ADUs on lots in the urban growth area where houses are allowed, and bars a rule that the owner live on the lot, so ask the Permit Center how the count applies to your lot.

For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.

Accessory dwelling units in Bothell
RuleIn Bothell
How manyState law requires at least two per lot; confirm for your lot
SizeUp to 1,200 square feet. Converting existing space may go larger with the director's approval, up to 40% of the house's floor area
Height of a detached unit30 feet, or 33 feet over an existing accessory structure
Rear setbackThe same as the house. Lots on an alley follow the alley setback rules
Accessory building capDetached ADUs are exempt from the rule that limits accessory buildings to 5% of the lot
Fees at issuanceTraffic, fire and park impact fees for the new unit
City of Bothell ADU submittal checklist 3f (updated December 2025), quoting BMC 12.14.135, and RCW 36.70A.681.

State and regional rules

Rules that apply in Bothell and across the region

These three come from the state or the regional air agency, not from the city. They apply to every remodel in King and Snohomish Counties.

Check for asbestos before demolition

The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.

Sales tax covers labor too

For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.3% in Bothell this quarter. Ask every bidder whether the price they quote includes it.

Hire a registered contractor

Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.

Giant Builders in Bothell

Remodeling services in Bothell

Giant Builders Seattle is a licensed general contractor based in Seattle, and Bothell is part of the area we work in. One company handles the design, the permits and the construction.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Bothell remodeling questions, answered

01

Do I need a permit to remodel my kitchen in Bothell?

For a remodel, yes. Bothell says remodels and repairs to a building or its systems need a permit. The city issues the building, plumbing and mechanical permits, and the electrical permit comes from L&I. Painting, tiling, cabinets, countertops and similar finish work are exempt under BMC 20.02.095.

02

Is my Bothell house in King County or Snohomish County?

Bothell lies in both counties, so it depends on the address. The county decides the sales tax rate on the job and which health agency approves septic work: King County Public Health or the Snohomish Health District. The city's own permits, fees and review times are the same on both sides of the line.

03

How long does a remodel permit take in Bothell?

Bothell's published times are 3 weeks for the first review of an interior-only remodel and 4 weeks for an addition, then 2 to 3 weeks for each later review. Mechanical and plumbing permits are issued the same day. The city says times vary with workload and to add one to two weeks or more in busy periods.

04

Who issues electrical permits in Bothell?

The Washington State Department of Labor & Industries (L&I), not the city. Many can be bought online, and the nearest L&I office is in Bellevue. The city issues the building, plumbing and mechanical permits through MyBuildingPermit.com.

05

What is the sales tax on a remodel in Bothell?

It depends on the county. For October 1 to December 31, 2026 the combined rate is 10.3% in the King County part of Bothell and 10.5% in the Snohomish County part. It is charged on the whole contract, labor included: on a $100,000 remodel, $10,300 or $10,500. The state can change local rates each quarter.

06

Do I need a permit to cut down a tree in Bothell?

Generally not, if all of these are true: the lot is an existing lot of record, it is under 20,000 square feet, the subdivision is more than 5 years old, and there are no critical areas such as wetlands, streams, slopes steeper than 40% or a shoreline designation. Trees in a critical area need the city's approval, and an arborist report is required for any removal that is not exempt.

07

How much does a kitchen remodel cost in Bothell?

No published survey covers Bothell on its own. Remodeling magazine's 2025 Cost vs. Value report for Seattle, the closest market it covers, lists $32,271 for a midrange minor kitchen remodel and $95,542 for a midrange major one. Seattle-area contractors published $75,000 to $130,000 for a full kitchen remodel in 2026. Sales tax of 10.3% or 10.5% comes on top, by county.

08

Can I build an ADU in Bothell?

Yes. Under BMC 12.14.135 an ADU may be up to 1,200 square feet, and a detached one up to 30 feet tall, or 33 feet over an existing accessory structure. State law requires the city to allow at least two ADUs on a lot where a house is allowed and bars an owner occupancy rule. Traffic, fire and park impact fees are due when the permit is issued.

Free estimate

Planning a remodel in Bothell?

Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

What are you planning?
When would you like to start?

We use your details to answer you. Nothing else.

Guides for nearby cities

Sources

  1. 01City of Bothell: Permit Center (hours, applying online, electrical permits) (read Nov 26, 2026)
  2. 02City of Bothell: Permit Center FAQs (read Nov 26, 2026)
  3. 03City of Bothell: Work Exempt from Permit handout (BMC 20.02.095.B, updated February 2023) (read Nov 26, 2026)
  4. 04City of Bothell: permit processing time sheet (updated September 2025) (read Nov 26, 2026)
  5. 05City of Bothell: single-family additions and alterations checklist 3b (updated July 2025) (read Nov 26, 2026)
  6. 06City of Bothell: accessory dwelling unit checklist 3f (updated December 2025) (read Nov 26, 2026)
  7. 07City of Bothell: trees and removal on private property guide (updated May 2023) (read Nov 26, 2026)
  8. 08MyBuildingPermit: construction tip sheet 00, permits required and not required (June 11, 2026) (read Nov 26, 2026)
  9. 09Washington L&I: cities that issue their own electrical permits (Bothell is not one) (read Nov 26, 2026)
  10. 10RCW 36.70A.681: accessory dwelling units (state law) (read Nov 26, 2026)
  11. 11Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
  12. 12Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
  13. 13Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
  14. 14Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
  15. 15Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
  16. 16Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
  17. 17Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)