Skip to the content

Whole-home remodeling · Seattle & the Eastside

Whole-home remodeling in Seattle

Several rooms, or all of them, planned and built as one project by one licensed contractor. Here is what a whole-house remodel includes, what it costs in this city, how it is phased and what the city requires.

An open main floor in an older house with fir trim kept, a painted beam where a wall was removed, and a navy kitchen island
Illustration
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

What is included

The whole house, planned once and built in order.

Remodeling room by room over ten years means opening the same walls more than once. A whole-house remodel puts every room and every system in one plan, so each trade comes through once.

One plan for the whole house

Every room is drawn, priced and scheduled together, so the wiring, the plumbing and the heating are each done once, in the right order, and no finished room is opened again.

Kitchens and bathrooms

The rooms that carry most of the cost and most of the trades, built the same way we build them as single projects.

Wiring, plumbing and heating

A new electrical service and circuits, new supply and drain lines, and heating and cooling sized for the finished house, all replaced while the walls are open.

Structure and layout

Walls opened or moved with properly sized beams, floors leveled and stiffened, stairs rebuilt to code and the house tied to its foundation.

Insulation, windows and air

Insulation in the walls, the attic and the crawl space, new windows where they are due, and ventilation that keeps a tighter house fresh.

Floors, trim and paint

Hardwood refinished or woven into what is there, doors and trim that suit the age of the house, and paint throughout.

Cost

What a whole-house remodel costs in Seattle

The price follows how much of the house changes, more than its size. These three levels are typical for Seattle-area houses of about 1,500 to 2,500 square feet in 2026.

Level 01

Rooms and surfaces

$150,000 to $300,000

About 3 to 5 months on site

The kitchen and the bathrooms are remodeled, and the rest of the house gets new floors, lighting and paint. Most walls stay where they are.

  • A full kitchen remodel
  • One or two bathrooms
  • Floors refinished or replaced, new trim and paint
  • Building, electrical and plumbing permits

Level 02

Down to the studs

$350,000 to $700,000

About 5 to 9 months on site

The inside of the house is opened up and rebuilt, with new wiring, plumbing, heating and insulation behind new finishes in every room.

  • New electrical service, wiring and plumbing
  • Insulation, windows and heating
  • Walls moved, with new beams where needed
  • Likely a substantial alteration, with seismic work

Level 03

Remodel plus more space

$700,000 and up

About 9 to 14 months on site

Everything in a down-to-the-studs remodel, plus an addition, a second story or a basement dug out and finished.

  • New foundation and framing for the added space
  • The old structure upgraded to carry it
  • Full plan review by the city
  • Most families move out for the build

Nobody publishes a benchmark for remodeling a whole house, because no two are alike. These ranges are built from published Seattle room figures (Remodeling magazine’s 2025 Cost vs. Value report: $95,542 for a midrange major kitchen, $36,146 for a midrange bathroom, $68,358 for a basement) plus the wiring, plumbing, insulation and finishes between those rooms, at typical local pricing. Sales tax is charged on the full contract in Washington: 10.55% in Seattle. Your written estimate is for your house, not an average. Try the remodel cost calculator.

Phasing

Staying or moving out: how a whole-house remodel is phased

A whole-house remodel can be built in one run with the house empty, or in phases while you live in part of it. Both work. They cost different amounts of time and money.

All at once

With the house empty, each trade works through every room in one pass: demolition, then framing, then plumbing, wiring and heating, then insulation and drywall, then finishes. It is the shortest schedule and the lowest construction cost. You pay for somewhere else to live for those months.

In phases

The house is divided into zones, and one zone is finished before the next begins, so you always have a bedroom, a bathroom and somewhere to cook. Work that serves the whole house is done first, so no finished room is opened again. Phasing adds time and some cost, because the crew sets up, protects and cleans up more than once.

An order that works for most houses

  • Structure, the roof and anything letting water in.
  • The systems that serve every room: electrical service, main water and drain lines, heating.
  • Bedrooms and bathrooms, one floor at a time.
  • The kitchen and the main floor.
  • The basement, the outside and the final finishes.

When moving out is the better choice

  • The only bathroom and the kitchen will be out at the same time
  • Asbestos or lead paint has to be removed from rooms you use
  • The roof or the outside walls will be open to the weather
  • Floors are being refinished through the whole house
  • Someone at home is very young, elderly or has trouble breathing

Permits and structure

Permits, structure and earthquake work in Seattle

Remodeling a whole house in Seattle needs a construction addition or alteration permit from the Seattle Department of Construction and Inspections (SDCI), an electrical permit from SDCI and a plumbing permit from Public Health Seattle & King County. How the building permit is reviewed depends on how much of the house you change.

What does not have to change

Seattle does not make you bring parts of the house you are not remodeling up to current code. The new work must meet it, and any effect the new work has on the structure has to be dealt with in the design.

When the city calls it a substantial alteration

If you reconfigure rooms or replace the wall surfaces in more than 60 percent of the house, SDCI is likely to treat the project as a substantial alteration. That brings required upgrades throughout the structure, including in rooms you are not changing. To keep such a project on the quicker subject-to-field-inspection route, the city asks for one of three things: seismic upgrade plans stamped by an engineer, an approved Earthquake Home Retrofit plan, or proof that the house was built under the 1985 building code or a later one.

Earthquake retrofit

Seattle’s Earthquake Home Retrofit permit covers three steps: anchor the house to its foundation, brace the short wall between the foundation and the first floor, and connect that wall to the floor framing. The city provides standard plans for houses that fit them, charges reduced permit fees for projects that use them and typically does its first review in two weeks. With the walls already open, a whole-house remodel is the least disruptive time to do it.

Moving walls

On a field-inspection permit, new beams and headers in bearing walls can be built without an engineer’s stamp up to 8 feet long under two stories and a roof, or 14 feet under one story and a roof. Longer spans need drawings stamped by a licensed civil or structural engineer.

Asbestos and lead

The Puget Sound Clean Air Agency requires a check for asbestos before any renovation. For houses built before 1978, Washington's lead rules, run by the Department of Commerce, require firms that are paid to disturb paint to be certified and to use lead-safe work practices.

The permit navigator works out the permit list for your project, the local remodel guides cover the offices and fees in ten cities, and the energy rebate calculator shows the utility rebates that apply to heating and insulation work.

What we check at the first visit

  • The foundation, and whether the house is bolted to it
  • The electrical service, the panel and the age of the wiring
  • Supply lines, drains and the sewer line
  • Which walls and posts carry the house
  • The heating system and the insulation
  • The roof, the gutters and signs of water in the basement

Older houses

What older Seattle houses hide

A whole-house remodel opens most of the walls, so it finds everything. These are the conditions we look for at the first visit, so they are in the price, not a change order.

Knob-and-tube and ungrounded wiring

Houses from before the Second World War often still have live knob-and-tube wiring behind the plaster, and many later ones have two-prong circuits with no ground. A whole-house remodel is when all of it is replaced.

Galvanized and cast iron pipes

Steel supply pipes that rust shut from the inside and cast iron drains that crack. Replacing the full runs costs far less with the walls open than as an emergency later.

No bolts and no bracing

Many older houses rest on their foundations without anchor bolts, and the short walls under the first floor have no bracing. The fix is made from the basement or the crawl space, and it is easiest during a remodel.

Framing surprises

A bearing wall taken out by an earlier owner, beams that are too small, joists notched for old plumbing, and floors that slope toward the middle of the house.

Little or no insulation

Empty wall cavities, a thin layer in the attic and single-pane windows. With the walls open, insulating them adds little cost, and Seattle does not ask for a permit to insulate an existing building.

Asbestos and lead paint

Old flooring, duct wrap, siding and wall texture can contain asbestos, and houses built before 1978 can have lead paint. A check for asbestos is required before any renovation, and Washington's lead rules set how lead paint is handled when it is disturbed.

Before and after

Rooms from Giant Builders projects, before and after

A whole-home remodel is these rooms done together. Pick a room type, pick a project and drag the line.

Kitchen remodel no. 7: after
Kitchen remodel no. 7: before
BeforeAfter

Drag the line to compare. Each pair is the same room, before and after.

Process

How a whole-home remodel runs

  1. 01

    Visit and measure

    A free visit to walk the whole house, from the foundation to the attic, and hear what you want it to become.

  2. 02

    Design and price

    Floor plans, material selections and a written, itemized price for the whole project, room by room and system by system.

  3. 03

    Permits and orders

    We file the permits, bring in a licensed structural engineer where the plans call for one, and order windows, cabinets and other long-lead items.

  4. 04

    Build

    Protection and dust walls first, then demolition, structure, plumbing, wiring and heating, inspections, insulation, drywall and finishes, in that order.

  5. 05

    Walkthrough

    We walk the finished house with you, room by room, and close out every item on the list before we call it done.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Whole-home remodeling questions, answered

01

How much does a whole-house remodel cost in Seattle?

It depends on how much of the house changes. Remodeling the kitchen and the bathrooms and renewing floors and paint throughout typically runs $150,000 to $300,000. Taking the house down to the studs, with new wiring, plumbing, insulation and finishes, typically runs $350,000 to $700,000, and projects that also add space start around $700,000. Nobody publishes a benchmark for a whole house, but the room figures in Remodeling magazine's 2025 Cost vs. Value report show the scale: $95,542 for a midrange major kitchen and $36,146 for a midrange bathroom in Seattle. Washington sales tax applies to the whole contract, labor included: 10.55% in Seattle.

02

How long does a whole-home remodel take?

Plan on 3 to 5 months of construction when the work is kitchens, bathrooms and surfaces, 5 to 9 months for a down-to-the-studs remodel, and 9 to 14 months when space is added. Design, engineering and permits come first and take several months when the project needs full plan review. Phasing the work so you can stay in the house adds time. We give you a schedule before work starts.

03

Can we live in the house during a whole-home remodel?

Sometimes. If the work can be split into zones, so that you always have a bedroom, a bathroom and somewhere to cook, many families stay. If the only bathroom and the kitchen are out at the same time, if the roof or outside walls are open, or if asbestos or lead paint is being removed from rooms you use, moving out for part of the job is safer and usually faster. We plan this with you before the price is set, because it changes the schedule.

04

Is it cheaper to remodel all at once or in phases?

All at once. Each trade works through the whole house in one pass, and the crew sets up, protects and cleans up one time. Phasing lets you stay in the house and spread the spending, but the total construction cost and the total time are higher. If you phase, do the work that serves the whole house first: the electrical service, the main water and drain lines and the heating.

05

Do I need a permit for a whole-house remodel in Seattle?

Yes. You need a construction addition or alteration permit from the Seattle Department of Construction and Inspections (SDCI), an electrical permit from SDCI and a plumbing permit from Public Health Seattle & King County. Smaller projects may qualify for a subject-to-field-inspection permit. Larger ones, and any that add a second story, go through full plan review. We prepare and file all of them.

06

Do I have to bring the whole house up to current code?

Not as a rule. Seattle does not make you upgrade parts of the house you are not remodeling, but the new work must meet current code and so must anything it affects. The exception is a substantial alteration. If you reconfigure rooms or replace the wall surfaces in more than 60 percent of the house, the city is likely to treat it as one, and that brings required upgrades throughout the structure, including in rooms you are not changing.

07

What is an earthquake retrofit, and does my house need one?

A retrofit anchors the house to its foundation, braces the short wall between the foundation and the first floor, and connects that wall to the floor framing. Many older houses have none of this. Seattle issues an Earthquake Home Retrofit permit for the work, with standard plans for houses that fit them and reduced permit fees. We check for anchor bolts and bracing at the first visit, from the basement or the crawl space.

08

What should be done first in a whole-house remodel?

Start with the parts you will not see. Fix the structure, the roof and any water problem first, then replace wiring, plumbing and heating, then insulate. Kitchens, bathrooms, floors and paint come after, so nothing finished has to be opened again.

Free estimate

Get a price for your house

Tell us what you are planning. We come out, walk the house with you, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

When would you like to start?

We use your details to answer you. Nothing else.