Local remodel guide · King County
Home remodeling in Woodinville, WA
What a Woodinville homeowner needs to know before a kitchen, bathroom or basement remodel: how the city takes applications, which permits are combined into one, the tree rules, what a remodel costs and what the ADU rules allow.
By Giant Builders SeattleUpdated Facts checked Nov 26, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short version
Remodeling in Woodinville at a glance
The facts a homeowner in Woodinville asks for first. Each one is explained further down, and the sources are at the end of the page.
| Question | Answer |
|---|---|
| Who issues permits | The City of Woodinville's Development Services department, at its Permit Center. |
| Where to apply | Online, through the city's Permit Portal, where most applications are accepted. |
| Plumbing and mechanical | Included in a Combined Building Permit for a remodel. Separate plumbing and mechanical permits are not needed. |
| Electrical permits | From the Washington State Department of Labor & Industries (L&I), not the city. |
| Before the permit is issued | The contractor's Washington state license and a Woodinville business license. |
| Sales tax | 10.4% on the whole contract, labor included, for October 1 to December 31, 2026. Addresses outside the regional transit district pay 9.0%. |
| ADUs | Up to two per lot where zoning allows them, from 300 to 1,500 square feet of habitable floor area. |
Permits
Who issues remodel permits in Woodinville
Woodinville’s Development Services department issues building permits for houses in the city and accepts most applications online through its Permit Portal. An applicant creates a user name and password, chooses the permit type under “New,” finds the address and uploads the plans as PDFs. The city emails an invoice and takes payment through the portal, and inspections are scheduled there once the permit is issued. An inspection can be cancelled online until 6 am on the day.
One combined permit for a remodel
For residential construction the city uses a Combined Building Permit. Mechanical and plumbing work that is part of a building project is permitted as a component of that permit, so separate mechanical and plumbing permits are not needed. Subcontractors are told to check with the general contractor that their part of the work was on the reviewed plans. Electrical permits are the exception: they come from L&I.
Before the permit is issued, the city asks for the contractor’s Washington state license and a Woodinville business license.
Trees
A tree removal permit is required to remove significant trees unless WMC 21.50.030 exempts them. When the trees come down as part of a project that already needs a building permit, site development permit or site plan review, no separate tree permit is needed: the removal is reviewed with the project.
Permit office
City of Woodinville Permit Center
Development Services17301 133rd Avenue NEWoodinville, WA 98072Phone 425-489-2754. Most applications are accepted online.
What needs a permit
Which projects need a permit in Woodinville
| Project | What Woodinville requires |
|---|---|
| Kitchen remodel | A Combined Building Permit covers the remodel along with its plumbing and mechanical work. New wiring needs an L&I electrical permit. Cabinets, countertops, paint and tile on their own are exempt (WMC 21.62.070). |
| Bathroom remodel | A Combined Building Permit for the remodel and its plumbing, and an L&I electrical permit for new wiring. |
| Basement finishing | A Combined Building Permit for the framing, plumbing and mechanical work, and an L&I permit for the wiring. |
| Water heater | A permit is required to install, move or replace any gas or electric water heater. |
| Decks | A permit when any part of the deck surface is more than 30 inches above grade, including repairing or replacing such a deck. |
| Sheds | A permit for a shed or playhouse over 200 square feet. |
| Trees | A tree removal permit for significant trees unless exempt. Removal that is part of a permitted building project is reviewed with that permit. |
Work that usually needs no building permit in Woodinville
- Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
- A one-story detached shed, playhouse or similar structure up to 200 square feet
- A fence up to 7 feet high, measured to the top of the caps
From WMC 21.62.070 and the city's permit FAQ. The pages we could read do not cover window, door or re-roof replacement, so ask the Permit Center before that work. Exempt work must still meet the code and the setbacks.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.
Timing
How long a permit takes in Woodinville
The Woodinville permit pages we could read publish no review target for a residential permit. The city tracks each application in its Permit Portal, where the applicant can follow it from submittal to issuance and then schedule inspections.
Because plumbing and mechanical work is reviewed inside the Combined Building Permit, a remodel goes through one city review rather than several. The electrical permit is separate and comes from L&I.
Cost
What a remodel costs in Woodinville
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
No public cost survey breaks out Woodinville on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Sales tax in Woodinville
Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Woodinville is 10.4% for October 1 to December 31, 2026. Addresses outside the Regional Transit Authority district pay 9.0%. On a $100,000 contract, 10.4% is $10,400 of tax. The state can change local rates each quarter, so check the rate again when you sign.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU rules in Woodinville
Woodinville rewrote its ADU rules in 2025 for the state’s ADU and middle housing laws (House Bills 1337 and 1110). The section in force is WMC 21.41.020, as amended by Ordinance 792. Where the zoning use table (WMC 21.21.050) allows ADUs, a lot may have up to two, and the second one does not count toward the lot’s maximum number of homes.
State law (RCW 36.70A.681) bars cities from requiring the owner to live on the lot.
For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.
| Rule | In Woodinville |
|---|---|
| How many | Up to two per lot where the zoning table allows ADUs |
| Size | At least 300 and no more than 1,500 square feet of habitable floor area |
| How area is counted | Habitable floor area leaves out parking, open-air floors and space with ceilings under 5 feet |
| Short-term rental | Not for stays of fewer than 30 consecutive nights |
| Prefabricated units | Allowed on a permanent foundation |
| Owner occupancy | State law bars a requirement |
State and regional rules
Rules that apply in Woodinville and across the region
These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.
Check for asbestos before demolition
The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.
Sales tax covers labor too
For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.4% in Woodinville this quarter. Ask every bidder whether the price they quote includes it.
Hire a registered contractor
Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.
Giant Builders in Woodinville
Remodeling services in Woodinville
Giant Builders Seattle is a licensed general contractor based in Seattle, and Woodinville is part of the area we work in. One company handles the design, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See the rooms themselves on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Woodinville remodeling questions, answered
01Do I need a permit to remodel my kitchen in Woodinville?
For a remodel that changes plumbing, wiring or layout, yes. Woodinville covers the building, plumbing and mechanical work with one Combined Building Permit, applied for online through the city's Permit Portal, and the electrical permit comes from L&I. Painting, tiling, cabinets, countertops and similar finish work on their own are exempt under WMC 21.62.070.
02Do I need separate plumbing and mechanical permits in Woodinville?
Not when the work is part of a building permit. The city says mechanical and plumbing work associated with a building permit is permitted as a component of the Combined Building Permit, so separate permits are not required. The electrical permit is still separate and comes from L&I.
03Who issues electrical permits in Woodinville?
The Washington State Department of Labor & Industries (L&I), not the city. Woodinville issues the Combined Building Permit, which includes the plumbing and mechanical work.
04Do I need a permit to replace a water heater in Woodinville?
Yes. The city requires a permit to install, relocate or replace any gas or electric water heater.
05What is the sales tax on a remodel in Woodinville?
10.4% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,400. Addresses outside the Regional Transit Authority district pay 9.0%. The state can change local rates each quarter.
06Do I need a permit to remove a tree in Woodinville?
For a significant tree, yes, unless WMC 21.50.030 exempts it. If the tree comes down as part of a project that already needs a building permit, site development permit or site plan review, no separate tree permit is needed: the removal is reviewed with that project.
07How much does a basement remodel cost in Woodinville?
No published survey covers Woodinville alone. The nearest benchmark is Remodeling magazine's 2025 Cost vs. Value report for Seattle, which puts a basement remodel at $68,358. For a kitchen it lists $32,271 for a midrange minor remodel and $95,542 for a midrange major one. Sales tax of 10.4% is added, or 9.0% at addresses outside the regional transit district.
08Can I build an ADU in Woodinville?
Yes, where the zoning table allows ADUs. Under WMC 21.41.020, as amended by Ordinance 792 in 2025, a lot may have up to two, each from 300 to 1,500 square feet of habitable floor area, and the second does not count toward the lot's maximum number of homes. ADUs may not be rented for fewer than 30 consecutive nights.
Free estimate
Planning a remodel in Woodinville?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Guides for nearby cities
Sources
- 01City of Woodinville: permitting (read Nov 26, 2026)
- 02City of Woodinville: apply for a permit online (read Nov 26, 2026)
- 03City of Woodinville: commercial and residential construction permits (Combined Building Permit) (read Nov 26, 2026)
- 04City of Woodinville: mechanical and plumbing permits (read Nov 26, 2026)
- 05City of Woodinville: frequently asked questions (water heaters, decks, sheds, trees, electrical permits) (read Nov 26, 2026)
- 06Woodinville Municipal Code 21.62.070: work exempt from permit (read Nov 26, 2026)
- 07Woodinville Municipal Code 21.41.020: accessory dwelling units (Ordinance 792, 2025) (read Nov 26, 2026)
- 08Washington L&I: cities that issue their own electrical permits (Woodinville is not one) (read Nov 26, 2026)
- 09RCW 36.70A.681: accessory dwelling units (state law) (read Nov 26, 2026)
- 10Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 11Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 12Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 13Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 14Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 15Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 16Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)
