Local remodel guide · King County
Home remodeling in Federal Way, WA
Where a permit is filed in Federal Way, which projects need one, what sales tax adds, what the work costs and what the city allows for backyard cottages. Each fact is tied to the city or state page it comes from.
By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
Remodeling in Federal Way, in short
Almost every remodel in Federal Way needs a permit from the city’s Permit Center, and Federal Way issues all of them itself, electrical included. An application that needs review is sent in electronically, after you ask the city for an upload link. Sales tax adds 10.4% to the contract.
The nearest published costs are for the Seattle market: about $75,000 to $130,000 for a typical full kitchen remodel, with survey figures of $36,146 for a midrange bathroom and $68,358 for a basement. The city amended its ADU rules in May 2025, and its code now allows up to two accessory dwelling units on a property.
| Question | Answer |
|---|---|
| Who issues building permits? | The City of Federal Way Permit Center, at City Hall, 33325 8th Avenue South. Phone 253-835-2607. |
| How do I apply? | Ask the city for a Document Upload Link, then submit electronically. Simple electrical, mechanical and plumbing permits can go through MyBuildingPermit.com. |
| Who issues electrical permits? | The city. Federal Way runs its own electrical permits and inspections. |
| When is the Permit Center open? | 9 a.m. to 4 p.m. on Monday, Tuesday, Thursday and Friday. It is closed to the public on Wednesdays. |
| What is the sales tax? | 10.4% on the full contract price, for October 1 to December 31, 2026. |
| How many ADUs can a lot have? | Up to two, of no more than 1,000 square feet each, under the code as amended in May 2025. |
| Which county? | King County. |
Permits
Permits for a remodel in Federal Way
Permits in Federal Way come from the Permit Center at City Hall, 33325 8th Avenue South. Staff answer by phone at 253-835-2607 and by email at permitcenter@federalwaywa.gov.
How to apply
Every application that needs review is submitted electronically. You first ask the city for a Document Upload Link. Staff set up a file for the project and send the link, which the city says can take a few days, so ask early. Simple electrical, mechanical and plumbing permits for a house can be applied for at MyBuildingPermit.com without that step.
What needs a permit
The Building Division puts it in one sentence: “Virtually every improvement on a residential or commercial lot requires a permit.” The exceptions it lists for houses are in the box below.
Electrical permits come from the city
Federal Way is one of the Washington cities that issues its own electrical permits and inspects the work. That is different from Kent and Auburn next door, where the state does it.
How long review takes
The city does not publish a standard review time. It says the time depends on the number of applications in line, how complete and clear the plans are, the type of permit and how quickly the owner and the designers answer questions.
Permit office
City of Federal Way Permit Center
Federal Way City Hall33325 8th Avenue SouthFederal Way, WA 98003Phone 253-835-26079 a.m. to 4 p.m. on Monday, Tuesday, Thursday and Friday. Closed to the public on Wednesdays.
| Project | What it takes in Federal Way |
|---|---|
| Kitchen remodel | No permit for new cabinets, counter tops, tile and paint alone. Moving or adding plumbing or wiring takes the matching permits, and changing walls takes a building permit. All of them come from the city. |
| Bathroom remodel | No permit for tile and paint, or for taking out and resetting a toilet. Replacing or rearranging valves, pipes or fixtures needs a plumbing permit, new wiring an electrical permit and changed walls a building permit, all from the city. |
| Basement finishing | A building permit, with electrical, plumbing and mechanical permits for those parts of the work. Finishing a basement is not on the city's list of exempt work. |
Work the city lists as needing no building permit
- Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work
- Fences not over 6 feet high
- One-story detached accessory structures of no more than 200 square feet
- Decks of no more than 200 square feet that are no more than 30 inches above the ground, not attached to the house and not at a required exit door
- Retaining walls not over 4 feet high, unless they hold back extra load
- Stopping a leak or clearing a blocked drain
- Taking out and resetting a toilet, as long as no valves, pipes or fixtures are replaced or rearranged
None of these exceptions applies in a critical area: a wetland, a stream, a landslide hazard area or the buffer around one. The city also notes that other code requirements can still apply to a fence, a sidewalk or a driveway.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs. Our Seattle permit guides explain what turns a simple update into permitted work, room by room: kitchen, bathroom and basement. The office, the forms and the fees are what change in Federal Way.
Sales tax
Sales tax on a remodel in Federal Way
The Washington Department of Revenue lists a combined state and local sales tax rate of 10.4% for Federal Way for October 1 to December 31, 2026. Seattle’s rate is 10.55%.
On a remodel, the tax is collected on the total contract price. That means labor and the contractor’s markup as well as materials, so it is one of the larger lines in a budget. When you compare bids, ask each bidder whether the number includes it.
The state can change local rates at the start of each quarter, so check the rate again when you sign.
| Contract price | Sales tax | Total |
|---|---|---|
| $50,000 | $5,200 | $55,200 |
| $100,000 | $10,400 | $110,400 |
| $150,000 | $15,600 | $165,600 |
Costs
What a remodel costs in Federal Way
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
| Accessory dwelling unit | $210,944 | 32.3% |
The Cost vs. Value report covers three Washington markets, Seattle, Spokane and Kennewick, so the Seattle table is the nearest published benchmark for Federal Way. Typical kitchen projects in the Seattle area run $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Add 10.4% sales tax to any of these. What an older house needs behind the walls, such as new wiring, new supply pipes or a floor brought back to level, is priced after a visit and not from a table.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our Seattle cost guides go line by line: kitchen, bathroom, basement and ADU and DADU. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU and DADU rules in Federal Way
Federal Way amended its ADU rules on May 6, 2025 (Ordinance 25-1010). For the single-family zones, the standards are in section 19.200.180 of the Federal Way Revised Code.
The city’s printed handout has not caught up with the code. Read the note under the table before you rely on it.
For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction and garage conversions. A home outside the city limits follows its county’s rules instead. For King County, see ADU rules in unincorporated King County.
| Rule | In Federal Way |
|---|---|
| How many | Up to two on a property in the single-family zones. |
| Size | No more than 1,000 square feet each, with exceptions for an attached ADU, and no more than two bedrooms. |
| Parking | The code's chart asks for one space per ADU, and none within half a mile of a major transit stop. |
| Lot coverage | The ADUs, other accessory structures and the main house together must stay within the zone's lot coverage and development standards. |
| Homes on the lot | Together with middle housing, up to six homes in all on a single-family lot. ADUs count toward the six. |
| Owner living on site | State law does not let a city require it. |
What the fire district and the utilities ask for
The city’s ADU handout also lists requirements that do not come from the zoning code. They often decide the budget:
- Federal Way has no water or sewer department. Depending on the address, service comes from Lakehaven Water & Sewer District, Tacoma Water, Midway Sewer District or Highline Water District. Certificates of water and sewer availability are required before the building permit application.
- A detached ADU on sewer needs its own sewer service connection permit. More plumbing fixtures can also mean a larger water service line and meter.
- South King Fire & Rescue checks the access for fire engines and the distance to a hydrant, which must be within 350 feet of the lot. Where its conditions are not met, fire sprinklers are required.
- An ADU must stand at least 10 feet from any other structure, or be built with fire-rated construction.
What Washington law sets for every city
The state’s ADU law (RCW 36.70A.681) is a floor that a city’s rules cannot go below. Cities in King and Pierce counties had to write it into their codes with the comprehensive plan update that was due by December 31, 2024, and where a local rule still conflicts, the state law overrides it. In Federal Way that means:
- At least two ADUs on a lot where a single-family house is allowed: attached, detached or one of each
- No rule that the owner must live on the property
- A size limit of no less than 1,000 square feet for each unit
- A height limit of no less than 24 feet, unless the main house is held lower
- No off-street parking requirement within half a mile's walk of a major transit stop
- An existing building such as a detached garage may be converted, even where it sits inside today's setbacks
- No ban on selling an ADU as a condominium unit
- Impact fees of no more than half of what the main house would pay
The limits of the law: it does not apply to a lot with critical areas such as wetlands or steep slopes, a city may refuse an ADU on a lot that is not on public sewer, and a city may restrict short-term rentals.
Your house
What to check before work starts on a house in Federal Way
Streams, wetlands and slopes
Federal Way’s list of work that needs no permit comes with one firm exception. Any work in a critical area is not exempt, and the city names wetlands, streams, landslide hazard areas and the buffers around them.
If your lot has a stream or a wetland on it, or slopes steeply, expect even a small deck or shed to need a permit. Ask the Permit Center before you plan an addition or a backyard cottage there.
Lead paint in houses built before 1978
Under the federal Renovation, Repair and Painting rule, a firm that is paid to disturb painted surfaces in a home built before 1978 must be certified by the EPA as lead-safe and must use lead-safe work practices. Ask any contractor you interview for that certificate.
An asbestos check before any renovation
The Puget Sound Clean Air Agency, whose territory includes King and Pierce counties, requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, unless an owner is surveying the single-family house they live in. The results are shared with everyone who works on the job. Removing friable asbestos takes a notice to the agency first.
Old flooring and wall texture are the usual suspect materials in a kitchen or a bathroom. We look for them at the first visit, so the testing is part of the plan and not a surprise on demolition day. For what else older houses hide, see whole-home remodeling.
Questions
Federal Way remodeling questions, answered
01Do I need a permit to remodel a kitchen or bathroom in Federal Way?
For most remodels, yes. The city's own wording is that virtually every improvement on a residential lot requires a permit. The listed exceptions include painting, tiling, carpeting, cabinets, counter tops and similar finish work. Once walls, plumbing or wiring change, permits apply, and Federal Way issues all of them itself, electrical included.
02How do I apply for a permit in Federal Way?
Electronically. For any application that needs review, you first ask the Permit Center for a Document Upload Link, and the city says the link can take a few days to arrive. Simple electrical, plumbing and mechanical permits for a house can be applied for at MyBuildingPermit.com. The Permit Center is at City Hall, 33325 8th Avenue South, phone 253-835-2607, and is closed to the public on Wednesdays.
03Who issues electrical permits in Federal Way?
The city does. Federal Way is one of the Washington cities that issues its own electrical permits and inspects the work, so you do not go to the state Department of Labor & Industries as you would in Kent or Auburn.
04What is the sales tax on a remodel in Federal Way?
10.4% for October 1 to December 31, 2026, collected on the total contract price, labor included. On a $100,000 remodel that is $10,400. The state can change local rates each quarter.
05How much does a kitchen remodel cost in Federal Way?
Remodeling magazine's Cost vs. Value report has no separate table for Federal Way, so its Seattle figures are the nearest published benchmark: in the 2025 edition, $95,542 for a midrange major kitchen remodel and $32,271 for a minor one. Typical full kitchen remodels in the Seattle area land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls starts around $150,000. Sales tax of 10.4% is added to the contract price.
06Can I build an ADU or a backyard cottage in Federal Way?
Yes. Federal Way amended its ADU rules in May 2025, and its code now allows up to two accessory dwelling units on a single-family property, each of no more than 1,000 square feet with no more than two bedrooms. The city's printed ADU handout is dated November 2023 and still describes the older one-unit rule, so confirm the details with the city's planning staff before you design.
07Who provides water and sewer in Federal Way?
Not the city. Federal Way has no water or sewer department. Depending on the address, service comes from Lakehaven Water & Sewer District, Tacoma Water, Midway Sewer District or Highline Water District. For an ADU, the city asks for certificates of water and sewer availability before the building permit application.
08How do I check that a remodeling contractor is registered in Washington?
Look the business up on the Department of Labor & Industries contractor search before you sign anything. A general contractor in Washington must be registered with the state and carry a $30,000 bond and liability insurance. Giant Builders Seattle is registered as GIANTBS782RZ, and anyone can open the record.
Giant Builders in Federal Way
Remodeling services in Federal Way
Giant Builders Seattle is a licensed general contractor based in Seattle, and Federal Way is part of the area we work in. One contract covers the drawings, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See finished rooms on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Plan your project
Calculators and Seattle-area guides
Calculators and tools
- Remodel cost calculatorA price range for a kitchen, bathroom or basement in two minutes.
- ADU cost calculatorBudget a backyard cottage, a garage conversion or a basement unit.
- Permit navigatorWhich permits a project like yours usually needs.
- Energy rebate calculatorUtility rebates that can go with a remodel.
Seattle cost guides
Seattle permit guides
Free estimate
Planning a remodel in Federal Way?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Sources
- 01City of Federal Way: Permit Center (read Nov 18, 2026)
- 02City of Federal Way: Building Division (read Nov 18, 2026)
- 03City of Federal Way: Residential permit exemptions (read Nov 18, 2026)
- 04City of Federal Way: Accessory dwelling unit informational handout (November 2023) (read Nov 18, 2026)
- 05Federal Way Revised Code chapter 19.200: single-family residential zones (19.200.180, ADUs) (read Nov 18, 2026)
- 06Federal Way Revised Code: ordinance table (Ordinance 25-1010) (read Nov 18, 2026)
- 07MyBuildingPermit: the member cities (read Nov 18, 2026)
- 08Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 09Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 10Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 11Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 12Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 13Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 14Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)
- 15Revised Code of Washington 36.70A.681: accessory dwelling units, limits on local rules (read Nov 18, 2026)
- 16Revised Code of Washington 36.70A.680: accessory dwelling units, when cities must comply (read Nov 18, 2026)
- 17Revised Code of Washington 36.70A.130: comprehensive plan update deadlines (read Nov 18, 2026)
- 18Washington Dept. of Labor & Industries: cities that issue their own electrical permits (read Nov 18, 2026)
- 19Washington Dept. of Labor & Industries: electrical permit basics (read Nov 18, 2026)
- 20U.S. Environmental Protection Agency: Lead Renovation, Repair and Painting program (read Nov 18, 2026)