Local remodel guide · King County
Home remodeling in Mercer Island, WA
What a Mercer Island homeowner needs to know before a kitchen, bathroom or basement remodel: how permits work while City Hall is closed, the city's review targets, the island's own code rules, what a remodel costs and what the interim ADU rules allow.
By Giant Builders SeattleUpdated Facts checked Nov 26, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short version
Remodeling in Mercer Island at a glance
The facts a homeowner in Mercer Island asks for first. Each one is explained further down, and the sources are at the end of the page.
| Question | Answer |
|---|---|
| Who issues permits | The City of Mercer Island's Community Planning and Development department (CPD). |
| Where to apply | Building permit plans and forms are uploaded to the city's Permit Submittal Portal. Electrical, mechanical and plumbing permits for a house are bought at MyBuildingPermit.com. |
| In person? | No. City Hall closed in 2023 and permit staff work by phone, (206) 275-7605, and email, epermit.tech@mercerisland.gov. |
| Electrical permits | Issued by the city, not by the state. Mercer Island is one of the cities that run their own electrical permits. |
| Review targets | 2 weeks for the first review of a non-major building permit and 4 weeks for a major one, then 2 weeks for each later round. The city says times may vary. |
| Sales tax | 10.3% on the whole contract, labor included, for October 1 to December 31, 2026. |
| ADUs | Up to two per lot, each up to 1,000 square feet, under interim rules. |
Permits
Who issues remodel permits in Mercer Island
Mercer Island’s Community Planning and Development department (CPD) reviews plans, issues permits and sends the inspector. The city code (MICC 17.14.010, which adopts the building code’s permit rules with local changes) requires a permit to build, enlarge, alter, repair, move or demolish a building, and to work on its electrical, gas, mechanical or plumbing systems. Work may not legally begin until the permit is issued and on the site.
Applying while City Hall is closed
The city closed City Hall in April 2023 after asbestos was found in the building, and the council later voted to close it for good. Permitting runs online. Plans, forms and supporting documents for a building permit are uploaded as PDFs to the Permit Submittal Portal, and staff email back whether the package is complete. Electrical, mechanical and plumbing permits for a house that need no plan review are bought at MyBuildingPermit.com, where permit status can also be checked.
Which route a project takes
- Simple residential projects. Non-structural interior remodels, basic decks, skylights and simple window or door size changes, and minor repairs. These used to be reviewed over the counter. The city says that service is not available at present, so they are submitted online like the rest.
- Small additions and remodels. Less than 500 square feet of new or expanded footprint and less than 500 square feet of new impervious surface, with no change to a critical area or its buffer. No intake screening is needed. The application includes a site development worksheet, a tree inventory and replacement form and, as the work requires, a topographic survey, structural calculations and a stormwater report.
- Work in a critical area. A project that alters a critical area or its buffer needs an intake screening, a review of the documents before the permit application, whatever its size.
Rules particular to the island
- Wet season limits. On lots in an erosion, potential slide or steep slope hazard area, clearing, grading, filling and foundation work are not allowed from October 1 to April 1. A waiver can be requested.
- Lake Washington shoreline. Work within 200 feet of the lake’s ordinary high water mark can need a separate shoreline permit application, which the city lists among the land use reviews that go with a building permit.
- Trees. The city’s answer to whether a tree permit is needed is “almost always yes.” On a building project, tree removal is reviewed with the permit, and an arborist report is needed when trees are removed or work comes near their drip lines.
- Working hours. Construction is allowed from 7 am to 7 pm Monday to Friday and 9 am to 6 pm on Saturday. No work on Sundays or holidays.
- Business license. The city asks applicants to confirm that the contractor holds a Mercer Island business license.
Permit office
Mercer Island Community Planning and Development
Mercer Island City Hall (closed to the public)9611 SE 36th StreetMercer Island, WA 98040City Hall closed in April 2023. Permit staff answer by phone, (206) 275-7605, and email, epermit.tech@mercerisland.gov. Check payments go in the drop box in the City Hall parking lot.
What needs a permit
Which projects need a permit in Mercer Island
| Project | What Mercer Island requires |
|---|---|
| Kitchen remodel | Painting, tile, cabinets and countertops need no building permit if required accessible features are not altered. A kitchen remodel with no structural work is one of the city's simple residential projects. Adding plumbing fixtures adds a water meter sizing worksheet to the application, and new circuits need an electrical permit from the city. |
| Bathroom remodel | A bathroom remodel with no structural work is a simple residential project. The regional MyBuildingPermit tip sheet notes that replacing a tub or shower needs a permit, while swapping a sink or toilet without changing the pipes does not. |
| Basement finishing | Plan on a building permit: finishing a basement is an interior alteration with new walls, wiring and often plumbing. Without structural work it may qualify as a non-structural interior remodel. Ask CPD which route fits. |
| Walls | Removing or changing a load-bearing wall makes a remodel structural. The city lists structurally complex remodels among the projects that cannot use the simple project route. |
| Additions | Under 500 square feet of new footprint and 500 square feet of new impervious surface, outside critical areas: the small additions route. Larger additions, and any work that alters a critical area, go through more review. |
| Windows and doors | Replacing a window in kind needs no permit when no structural member changes and safety glazing, fall protection, egress and energy code values are met. Changing a window or door size, or adding a skylight, is a simple residential project. |
| Decks | No permit for a deck no more than 30 inches above grade with no basement or story below. A basic deck outside geologic hazard areas and critical area buffers is a simple residential project. |
Work that usually needs no building permit in Mercer Island
- Painting, wallpaper, tile, carpet, cabinets and countertops, if required accessible features stay as they are
- Replacing a window in kind with no structural change, keeping safety glazing, egress and energy code values
- Re-roofing in kind on a house, if the roof sheathing is not removed or replaced
- Replacing deck boards without changing structural members or removing guardrails
- A deck, sidewalk or driveway no more than 30 inches above grade, with no story below
- A fence up to 6 feet high
- A one-story detached shed, playhouse or tree-supported play structure up to 200 square feet
From the City of Mercer Island's building permit page (MICC 17.14.010). These exemptions do not apply in flood hazard areas or the city's critical areas, except for work entirely inside, or on the outside walls of, an existing legal building. Electrical, mechanical and plumbing permits can still apply.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.
Timing
How long a permit takes in Mercer Island
Mercer Island publishes target review times. The clock starts once every required document is in. The city calls the targets estimates and says review times may vary; its stated goal is to meet or beat them. There is no expedited review.
The targets add up. A non-major building permit with one round of corrections comes to about 4 weeks of city review, plus about a week for routing and a week to prepare the permit for issuance, plus the time it takes to answer the corrections. The city code (MICC 19.15.030) defines which permits count as major.
An application that requires public notice also carries a 30-day public comment period, which can lengthen the review.
| Step or route | Published figure |
|---|---|
| First review, non-major building permit (Type 1) | 2 weeks |
| First review, major building permit (Type 3) | 4 weeks |
| Each later review after corrections | 2 weeks |
| Revision to a permit | 2 to 3 weeks |
| Intake screening, once all documents are in | 2 weeks |
| Routing once the application is complete | 1 week |
| Preparing an approved permit for issuance | 1 week |
| Electrical, mechanical or plumbing permit | 2 weeks |
Cost
What a remodel costs in Mercer Island
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
No public cost survey breaks out Mercer Island on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Sales tax in Mercer Island
Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Mercer Island is 10.3% for October 1 to December 31, 2026. On a $100,000 contract, 10.3% is $10,300 of tax. The state can change local rates each quarter, so check the rate again when you sign.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU rules in Mercer Island
Mercer Island’s ADU rules are interim regulations, written to meet the state’s ADU law (House Bill 1337). The council adopted them in Ordinance 25C-02 on March 4, 2025, and they took effect on June 30, 2025. The ADU section of the code is MICC 19.02.030.
Interim rules expire unless they are renewed. In June 2026 the council took up Ordinance 26-05 to renew them for six months, and the city says permanent rules will follow more public engagement. Ask CPD which version applies on the day you apply.
An ADU needs its own land use approval as well as the building permit, so it cannot use the simple project route.
For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.
| Rule | In Mercer Island |
|---|---|
| How many | Up to two per lot |
| Size | Up to 1,000 square feet of gross floor area each |
| Shared limit | ADUs, garages and other accessory buildings together may use no more than 25% of the gross floor area allowed on the lot |
| Parking | None within a half mile walk of the light rail station. Elsewhere 1 space per unit on lots under 6,000 square feet and 2 per unit on larger lots |
| Owner occupancy | Not required: the interim rules removed it |
State and regional rules
Rules that apply in Mercer Island and across the region
These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.
Check for asbestos before demolition
The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.
Sales tax covers labor too
For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.3% in Mercer Island this quarter. Ask every bidder whether the price they quote includes it.
Hire a registered contractor
Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.
Giant Builders in Mercer Island
Remodeling services in Mercer Island
Giant Builders Seattle is a licensed general contractor based in Seattle, and Mercer Island is part of the area we work in. One company handles the design, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See the rooms themselves on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Mercer Island remodeling questions, answered
01Do I need a permit to remodel my kitchen on Mercer Island?
It depends on the work. Mercer Island exempts painting, tile, cabinets and countertops from a building permit. Adding or moving plumbing, adding circuits or changing walls needs permits. A kitchen remodel with no structural work is one of the city's simple residential projects, submitted online through the Permit Submittal Portal. Electrical and plumbing permits come from the city and are bought at MyBuildingPermit.com.
02Can I get a permit in person at Mercer Island City Hall?
No. The city closed City Hall in April 2023 after asbestos was found in the building, and the council later voted to close it permanently. Permit staff work remotely and answer at (206) 275-7605 or epermit.tech@mercerisland.gov. Applications go in online, and check payments can be left in the drop box in the City Hall parking lot at 9611 SE 36th Street.
03How long does a building permit take on Mercer Island?
The city's targets are 2 weeks for the first review of a non-major building permit, 4 weeks for a major one and 2 weeks for each later round, counted from the day every required document is in. Routing and preparing the permit for issuance add about a week each. The city says these are estimates and review times may vary. It does not offer expedited review.
04Can foundation work for an addition happen in winter on Mercer Island?
Not on every lot. On lots in an erosion, potential slide or steep slope hazard area, the city prohibits clearing, grading, filling and foundation work from October 1 to April 1. A waiver can be requested. Interior work is not affected. Check whether your lot is in a hazard area before you schedule an addition's excavation.
05What hours can contractors work on Mercer Island?
Construction is allowed from 7 am to 7 pm Monday to Friday, except holidays, and from 9 am to 6 pm on Saturday. No work may be done on Sundays or holidays.
06What is the sales tax on a remodel in Mercer Island?
10.3% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,300. The state can change local rates each quarter.
07How much does a kitchen remodel cost on Mercer Island?
No public cost survey covers Mercer Island on its own. Remodeling magazine's 2025 Cost vs. Value report for Seattle, the nearest market it covers, puts a midrange minor kitchen remodel at $32,271, a midrange major one at $95,542 and an upscale one at $188,401. Contractors in the Seattle area published ranges of $75,000 to $130,000 for a full kitchen remodel in 2026. Sales tax of 10.3% is added on top.
08Can I build an ADU on Mercer Island?
Yes, under interim rules: up to two ADUs per lot, each up to 1,000 square feet, and the owner no longer has to live on the property. ADUs share a cap with garages and other accessory buildings of 25% of the floor area allowed on the lot. The rules are interim and were up for renewal in 2026, so confirm what is in force with the city before you design.
Free estimate
Planning a remodel in Mercer Island?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Guides for nearby cities
Sources
- 01City of Mercer Island: building permits, when they are required (MICC 17.14.010) (read Nov 26, 2026)
- 02City of Mercer Island: simple residential projects (read Nov 26, 2026)
- 03City of Mercer Island: small residential additions and remodels (read Nov 26, 2026)
- 04City of Mercer Island: review timelines (read Nov 26, 2026)
- 05City of Mercer Island: permit FAQ (wet season limits, construction hours) (read Nov 26, 2026)
- 06City of Mercer Island: residential permits without plan review (electrical, mechanical, plumbing) (read Nov 26, 2026)
- 07City of Mercer Island: how to upload a submittal (read Nov 26, 2026)
- 08City of Mercer Island: City Hall closure, accessing city services (read Nov 26, 2026)
- 09City of Mercer Island: letter on the permanent closure of City Hall (October 4, 2023) (read Nov 26, 2026)
- 10City of Mercer Island: tree permits (read Nov 26, 2026)
- 11City of Mercer Island: middle housing and accessory dwelling units (read Nov 26, 2026)
- 12City of Mercer Island: interim development regulations (Ordinance 25C-02) (read Nov 26, 2026)
- 13City of Mercer Island: notice of public hearing on Ordinance 26-05 (June 2, 2026) (read Nov 26, 2026)
- 14Washington L&I: cities that issue their own electrical permits (read Nov 26, 2026)
- 15MyBuildingPermit: construction tip sheet 00, permits required and not required (June 11, 2026) (read Nov 26, 2026)
- 16Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 17Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 18Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 19Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 20Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 21Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 22Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)