Local remodel guide · Pierce County
Home remodeling in Tacoma, WA
Tacoma is in Pierce County, with its own permit portal, its own electrical permit office and its own utility. Here is where a permit is filed, what sales tax adds, what the work costs and what the city allows for backyard cottages.
By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
Remodeling in Tacoma, in short
Tacoma is in Pierce County, and its paperwork is its own. A remodel needs a building permit from the city’s Planning and Development Services, applied for online at TacomaPermits.org, and the electrical permit comes from Tacoma Power. Sales tax adds 10.5% to the contract.
The nearest published costs are for the Seattle market: about $75,000 to $130,000 for a typical full kitchen remodel, with survey figures of $36,146 for a midrange bathroom and $68,358 for a basement. Tacoma allows two accessory dwelling units on a residential lot, with no parking requirement, and offers pre-approved plans for detached ones.
| Question | Answer |
|---|---|
| Who issues building permits? | The City of Tacoma's Planning and Development Services, 747 Market Street, 3rd floor. Phone 253-591-5030. |
| How do I apply? | Online at TacomaPermits.org, or in person at the Tacoma Municipal Building. |
| Who issues electrical permits? | Tacoma Power, the electric utility. Its permit office is separate from the city's building permit office. |
| What is the sales tax? | 10.5% on the full contract price, for October 1 to December 31, 2026. |
| How many ADUs can a lot have? | Two, on any legally established residential lot, with up to 1,000 square feet of living area each. No parking is required. |
| What zoning applies to houses? | The Urban Residential zones UR-1, UR-2 and UR-3, since February 1, 2025 (Home in Tacoma). |
| Which county? | Pierce County. |
Permits
Permits for a remodel in Tacoma
Tacoma is in Pierce County. The permit office, the online portal, the office that issues electrical permits and the utility are all different from the ones in Seattle and the King County cities.
Building permits come from the city’s Planning and Development Services (PDS), on the third floor of the Tacoma Municipal Building at 747 Market Street. The phone number is 253-591-5030. Applications are made online at TacomaPermits.org, which runs on the city’s Accela permit portal, or in person at PDS.
What needs a permit
PDS answers the question in one sentence: “Remodels and additions require a building permit, and associated plumbing and mechanical permits.” A plumbing permit covers replacing or adding fixtures. The finish work that is exempt on a house is in the box below.
Electrical permits come from Tacoma Power
Electrical permits in Tacoma are issued by Tacoma Power, the electric utility that is part of Tacoma Public Utilities. Its electrical permit office is separate from PDS, so the building plans and the electrical plans are submitted to each one. Both are applied for through the same online portal, and the electrical permit fee is paid before the permit is issued. Tacoma Power’s electrical inspection office is at 253-502-8277.
Fees and review times
Most building permit fees are based on the value of the work, and the city has an online fee estimator. On its permit timelines page, PDS publishes how long its reviews have taken over the last six months. The figures there now cover May 1 to October 31, 2026. PDS also says many permits are available for same-day issue as ePermits.
Permit office
City of Tacoma Planning and Development Services
Tacoma Municipal Building, 3rd floor747 Market StreetTacoma, WA 98402Phone 253-591-5030| Project | What it takes in Tacoma |
|---|---|
| Kitchen remodel | No permit for cabinets, counter tops, tile and paint alone. A building permit for a remodel that goes further, with a plumbing permit when fixtures are replaced or added and a mechanical permit for that part of the work. An electrical permit from Tacoma Power for new wiring. |
| Bathroom remodel | No permit for tile and paint alone. A plumbing permit when fixtures are replaced or added, a building permit for the remodel, and an electrical permit from Tacoma Power for new wiring. |
| Basement finishing | A building permit with the plumbing and mechanical permits that go with it, and an electrical permit from Tacoma Power. |
Work the city lists as needing no building permit
- Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work
- Fences not over 7 feet high
- One-story detached accessory structures of no more than 200 square feet
- Decks of no more than 200 square feet that are no more than 30 inches above the ground, not attached to the house and not at a required exit door
- Retaining walls not over 4 feet high, measured from the bottom of the footing, unless they hold back extra load
- Re-roofing a house or duplex when the old roofing comes off first, the new roofing weighs no more than 2.5 pounds per square foot and the framing is not changed
- Ordinary repairs that do not touch the structure, the exits or the piping
These are the exemptions for houses, duplexes and townhouses in the city's tip sheet G-101. Sidewalks and driveways need no building permit but may need a site development permit.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs. Our Seattle permit guides explain what turns a simple update into permitted work, room by room: kitchen, bathroom and basement. The office, the forms and the fees are what change in Tacoma.
Sales tax
Sales tax on a remodel in Tacoma
The Washington Department of Revenue lists a combined state and local sales tax rate of 10.5% for Tacoma for October 1 to December 31, 2026. Seattle’s rate is 10.55%.
On a remodel, the tax is collected on the total contract price. That means labor and the contractor’s markup as well as materials, so it is one of the larger lines in a budget. When you compare bids, ask each bidder whether the number includes it.
Just outside the city limits the rate changes. For unincorporated Pierce County the state lists rates from 8.2% to 10.2%, depending on the taxing districts an address is in.
The state can change local rates at the start of each quarter, so check the rate again when you sign.
| Contract price | Sales tax | Total |
|---|---|---|
| $50,000 | $5,250 | $55,250 |
| $100,000 | $10,500 | $110,500 |
| $150,000 | $15,750 | $165,750 |
Costs
What a remodel costs in Tacoma
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
| Accessory dwelling unit | $210,944 | 32.3% |
The Cost vs. Value report covers three Washington markets, Seattle, Spokane and Kennewick, so the Seattle table is the nearest published benchmark for Tacoma. Typical kitchen projects in the Seattle area run $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Add 10.5% sales tax to any of these. What an older house needs behind the walls, such as new wiring, new supply pipes or a floor brought back to level, is priced after a visit and not from a table.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our Seattle cost guides go line by line: kitchen, bathroom, basement and ADU and DADU. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU and DADU rules in Tacoma
Tacoma’s ADU rules are in its Land Use Code, chapter 13.06 of the Tacoma Municipal Code, and the city sums them up in tip sheet L-150, dated March 2025.
The main points: two ADUs per lot, no minimum lot size and no parking requirement. A detached unit goes in the rear yard.
For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction and garage conversions.
| Rule | In Tacoma |
|---|---|
| How many | Two per lot, as an accessory use to a main home, on any legally established lot whatever its size or width, in zones that permit homes. |
| Size | Up to 1,000 square feet of living area each. Non-living areas are not counted. |
| Height | The standard height limit of the zone. |
| Where a detached ADU goes | In the rear yard: at least 5 feet from the side property lines (8 feet where the main entrance faces a side line) and 15 feet from the rear line. No setback is required from an alley. |
| Parking | Not required. If you add parking, it goes in the rear of the lot and is reached from there. An ADU may not remove parking that the main house is required to have. |
| Yard | At least 10% of the lot stays usable yard space. |
| Utilities | A detached unit needs its own outside connections to sewer and water. Each home must be able to control its own heating and water heater. |
| Address | A separate address, visible from the street. |
| Permits | Required for creating, converting or legalizing an ADU. Depending on the project: building, plumbing, mechanical, site development, side sewer, stormwater, water and electrical. |
Home in Tacoma zoning
On February 1, 2025, the Home in Tacoma zoning rules took effect. Single-family zoning was replaced across the city by three Urban Residential zones, UR-1, UR-2 and UR-3, which allow more homes on a lot: a baseline of four, six and eight on a 6,000 square foot lot. The city does not treat an ADU as a housing type of its own. One can be built within any of the housing types the new zones allow.
Pre-approved plans for a detached ADU
Tacoma offers pre-approved plans for detached ADUs in four base models, with options for the roof and the siding. The city is clear that a pre-approved plan is not a pre-issued permit. Staff still visit the site with you and your contractor, and changes beyond the listed options go back through the designer for a fee.
What Washington law sets for every city
The state’s ADU law (RCW 36.70A.681) is a floor that a city’s rules cannot go below. Cities in King and Pierce counties had to write it into their codes with the comprehensive plan update that was due by December 31, 2024, and where a local rule still conflicts, the state law overrides it. In Tacoma that means:
- At least two ADUs on a lot where a single-family house is allowed: attached, detached or one of each
- No rule that the owner must live on the property
- A size limit of no less than 1,000 square feet for each unit
- A height limit of no less than 24 feet, unless the main house is held lower
- No off-street parking requirement within half a mile's walk of a major transit stop
- An existing building such as a detached garage may be converted, even where it sits inside today's setbacks
- No ban on selling an ADU as a condominium unit
- Impact fees of no more than half of what the main house would pay
The limits of the law: it does not apply to a lot with critical areas such as wetlands or steep slopes, a city may refuse an ADU on a lot that is not on public sewer, and a city may restrict short-term rentals.
Your house
What to check before work starts on a house in Tacoma
Historic districts and landmarks
Tacoma has locally designated historic districts and City Landmarks, and they add a step before the building permit. In the North Slope Historic District, an exterior change that needs a building permit also needs design review by the Landmarks Preservation Commission. So does any exterior work on a City Landmark that can be seen from the street.
The Commission generally meets on the second and fourth Wednesday of each month, and an application has to be complete two weeks before the meeting. The city says simple projects typically take two to four weeks. The review is about the outside of the building, so plan it into the schedule for an addition or a detached ADU.
Power, water and rebates come from Tacoma Public Utilities
The city’s permit pages send questions about electric and water service to Tacoma Public Utilities. Rebates follow the utility too. For a Tacoma address that means Tacoma Power, not Seattle City Light.
Tacoma Power’s heat pump page currently lists rebates of up to $2,000, and loans at 0% interest of up to $20,000 over seven years for homes with electric heat, when the work is done by one of its participating contractors. It says the amounts can change without notice.
Lead paint in houses built before 1978
Under the federal Renovation, Repair and Painting rule, a firm that is paid to disturb painted surfaces in a home built before 1978 must be certified by the EPA as lead-safe and must use lead-safe work practices. Ask any contractor you interview for that certificate.
An asbestos check before any renovation
The Puget Sound Clean Air Agency, whose territory includes King and Pierce counties, requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, unless an owner is surveying the single-family house they live in. The results are shared with everyone who works on the job. Removing friable asbestos takes a notice to the agency first.
Old flooring and wall texture are the usual suspect materials in a kitchen or a bathroom. We look for them at the first visit, so the testing is part of the plan and not a surprise on demolition day. For what else older houses hide, see whole-home remodeling.
Questions
Tacoma remodeling questions, answered
01Do I need a permit to remodel a kitchen or bathroom in Tacoma?
For most remodels, yes. The city says remodels and additions require a building permit, with plumbing and mechanical permits for that part of the work. Painting, tiling, carpeting, cabinets, counter tops and similar finish work on a house or duplex are exempt. Electrical permits are separate and come from Tacoma Power.
02How do I apply for a building permit in Tacoma?
Online at TacomaPermits.org, the city's permit portal, or in person at Planning and Development Services on the third floor of the Tacoma Municipal Building, 747 Market Street. The office's phone number is 253-591-5030. Most building permit fees are based on the value of the work, and the city has an online fee estimator. When we build your project, we prepare and file the application.
03Who issues electrical permits in Tacoma?
Tacoma Power, the electric utility that is part of Tacoma Public Utilities. Its electrical permit office is separate from the city's building permit office, so a remodel with new wiring has two sets of permits. Both are applied for through the same online portal.
04What is the sales tax on a remodel in Tacoma?
10.5% for October 1 to December 31, 2026, collected on the total contract price, labor included. On a $100,000 remodel that is $10,500. Tacoma is in Pierce County, and the rates in the unincorporated county around it are different. The state can change local rates each quarter.
05How much does a kitchen remodel cost in Tacoma?
Remodeling magazine's Cost vs. Value report has no separate table for Tacoma, so its Seattle figures are the nearest published benchmark: in the 2025 edition, $95,542 for a midrange major kitchen remodel and $32,271 for a minor one. Typical full kitchen remodels in the Seattle area land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls starts around $150,000. Sales tax of 10.5% is added to the contract price.
06Can I build an ADU or a backyard cottage in Tacoma?
Yes. Tacoma allows two accessory dwelling units per lot, whatever the lot's size, in zones that permit homes. The living area of each can be up to 1,000 square feet, no parking is required, and a detached unit goes in the rear yard. The city also offers pre-approved plans for detached units.
07My house is in a Tacoma historic district. What changes?
Exterior work may need design review before the building permit. In the North Slope Historic District, an exterior change that needs a building permit also needs review by the Landmarks Preservation Commission, and so does exterior work on a City Landmark that is visible from the street. The city says simple projects typically take two to four weeks.
08Is remodeling in Tacoma different from remodeling in Seattle?
In the paperwork, yes. Tacoma is in Pierce County. Building permits come from the City of Tacoma's own portal, electrical permits come from Tacoma Power, and electricity and water come from Tacoma Public Utilities, so Seattle's offices and forms do not apply. The sales tax rate is also set separately for Tacoma.
09How do I check that a remodeling contractor is registered in Washington?
Look the business up on the Department of Labor & Industries contractor search before you sign anything. A general contractor in Washington must be registered with the state and carry a $30,000 bond and liability insurance. Giant Builders Seattle is registered as GIANTBS782RZ, and anyone can open the record.
Giant Builders in Tacoma
Remodeling services in Tacoma
Giant Builders Seattle is a licensed general contractor based in Seattle, and Tacoma is part of the area we work in. One contract covers the drawings, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See finished rooms on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Plan your project
Calculators and Seattle-area guides
Calculators and tools
- Remodel cost calculatorA price range for a kitchen, bathroom or basement in two minutes.
- ADU cost calculatorBudget a backyard cottage, a garage conversion or a basement unit.
- Permit navigatorWhich permits a project like yours usually needs.
- Energy rebate calculatorUtility rebates that can go with a remodel.
Seattle cost guides
Seattle permit guides
Free estimate
Planning a remodel in Tacoma?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Sources
- 01Tacoma Permits: What requires a permit (tip sheet G-101) (read Nov 18, 2026)
- 02Tacoma Permits: Frequently asked questions (read Nov 18, 2026)
- 03Tacoma Permits: Permit timelines (read Nov 18, 2026)
- 04Tacoma Public Utilities: Electrical permitting (read Nov 18, 2026)
- 05City of Tacoma: Accessory Dwelling Unit tip sheet L-150 (March 2025) (read Nov 18, 2026)
- 06Tacoma Permits: Pre-approved detached accessory dwelling units (read Nov 18, 2026)
- 07City of Tacoma: Home in Tacoma, new residential zoning and incentives (brochure) (read Nov 18, 2026)
- 08City of Tacoma: Historic preservation design review (read Nov 18, 2026)
- 09Tacoma Power: Heat pump rebates and loans (read Nov 18, 2026)
- 10Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 11Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 12Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 13Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 14Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 15Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 16Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)
- 17Revised Code of Washington 36.70A.681: accessory dwelling units, limits on local rules (read Nov 18, 2026)
- 18Revised Code of Washington 36.70A.680: accessory dwelling units, when cities must comply (read Nov 18, 2026)
- 19Revised Code of Washington 36.70A.130: comprehensive plan update deadlines (read Nov 18, 2026)
- 20Washington Dept. of Labor & Industries: cities that issue their own electrical permits (read Nov 18, 2026)
- 21Washington Dept. of Labor & Industries: electrical permit basics (read Nov 18, 2026)
- 22U.S. Environmental Protection Agency: Lead Renovation, Repair and Painting program (read Nov 18, 2026)