Topic · 6 articles
Kitchens and bathrooms
Walls, wiring, water and timelines for the two rooms people remodel most.
- 01
Removing a Load-Bearing Wall in Seattle: Beams and PermitsIn Seattle, cutting or removing a load-bearing wall always needs a building permit from the Seattle Department of Construction and Inspections (SDCI), however small the job. Most interior openings qualify for the quick subject-to-field-inspection (STFI) permit. SDCI's Tip 316, updated October 29, 2026, lets a new beam go in without an engineer's stamp when it spans no more than 8 feet under two stories and a roof, or 14 feet under one story and a roof. A longer beam, or one under three stories, needs plans stamped by a civil or structural engineer.9 min read - 02
Switching a Seattle Kitchen From Gas to InductionSwitching a Seattle kitchen from a gas range to induction usually means a new 240-volt circuit, a check that the panel and service can carry it, an electrical permit from SDCI, and capping the gas line under a gas piping permit from Public Health Seattle and King County. The kitchen still needs a range hood ducted outside; Washington's code sets the minimum at 160 cfm over an electric range and 250 cfm over gas, or a tested capture efficiency. Neither Seattle City Light nor Puget Sound Energy listed a residential induction rebate on November 26, 2026.9 min read - 03
How Long a Kitchen Remodel Takes in Seattle, Step by StepA full kitchen remodel in the Seattle area typically takes 8 to 12 weeks on site, after several weeks of design, selections, ordering and permits. A refresh that keeps the layout takes about 3 to 6 weeks, and a project that moves walls about 12 to 20. In Seattle, SDCI typically processes a subject-to-field-inspection permit within a few working days, the permit stays valid for 18 months, and inspections fall between the stages: rough wiring and plumbing before insulation, insulation before drywall, and finals at the end.8 min read - 04
Building a Curbless Shower: Floor, Drain and WaterproofingA curbless shower needs its floor set lower than the bathroom floor, or the bathroom floor raised, so water slopes to the drain with no curb to stop it. In a wood floor that usually means recessing the subfloor without notching joists past the code's limits; on a slab, cutting the concrete. Washington's plumbing code sets the minimum size at 900 square inches that can hold a 30-inch circle. In Seattle the drain and valve need a plumbing permit from Public Health Seattle and King County, and framing changes need an SDCI building permit.8 min read - 05
Bathroom Exhaust Fans in Seattle: Code, Ducts and MoldSeattle's residential code requires a local exhaust fan in every bathroom, able to move at least 50 cubic feet per minute when it runs on a switch, or 20 cfm when it runs all the time. The air must go outdoors, never into an attic, soffit or crawl space, through a duct with a backdraft damper that is insulated to R-4 where it crosses unconditioned space. Airflow is either measured as installed or met by the duct sizes in the code's table. The EPA advises keeping indoor humidity below 60 percent, ideally 30 to 50.8 min read - 06
Designing a Bathroom to Age in Place: Sizes That WorkNo code requires an accessible bathroom in a single-family house in Washington: Seattle's residential code applies accessibility rules only to buildings with four or more units, and the ADA does not cover strictly residential facilities. The 2010 ADA Standards and ICC A117.1 still give measurements to borrow as guides: grab bars 33 to 36 inches above the floor and strong enough for 250 pounds, a 32-inch clear door opening, a toilet seat 17 to 19 inches high, and a 60-inch circle of turning space.9 min read