Skip to the content

Kitchen remodeling · Free consultation

Free kitchen design consultation in Seattle

We come to your kitchen, measure it, look at what is behind the walls and talk through how you want the room to work. Afterwards you get a written, itemized estimate. The visit costs nothing and commits you to nothing.

A kitchen with white shaker cabinets, stainless steel appliances and a gray island with a white stone top
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The visit

What happens in a kitchen design consultation

One visit to the house, at a time that suits you. This is how it runs.

  1. 01

    You get in touch

    Send the form below or call. We answer within one business day and agree on a time to come to the house.

  2. 02

    We walk the room

    You show us what does not work: the cramped corner, the short counter, the dark sink. We ask how you cook and who uses the kitchen.

  3. 03

    We measure and look behind it

    Walls, windows, ceiling height and appliances go on paper. We look at the electrical panel, the plumbing, which walls carry load and where the range hood vents.

  4. 04

    We talk options and budget

    Layouts that would fix what bothers you, cabinet and counter choices, and what each one does to the price.

  5. 05

    You get it in writing

    After the visit we send a written, itemized estimate for the kitchen we talked about. It is yours to keep and compare.

Before we come

What to have ready

A white kitchen with a stone-clad island, two pendant lights and a wooden dining table in front of it

None of this is required. Each item makes the visit more useful, and the estimate that follows it closer to what you will actually build.

  • Pictures of kitchens you like, saved on a phone or cut from a magazine
  • A short list of what bothers you about the kitchen today
  • The appliances you plan to keep, or the ones you have picked, with their sizes
  • A budget range you are comfortable with, even a rough one
  • Any drawings of the house, and the year it was built if you know it
  • Condo or homeowner association rules, if your building has them
  • Everyone who will decide, in the room if they can be

Afterwards

What you get after the consultation

A written, itemized estimate

The price for the kitchen we discussed, broken into its parts, so you can see where the money goes and what would move it up or down.

The permits your kitchen needs

Which permits your scope calls for and who issues each one. We prepare and file them when we build the project.

A picture of the timeline

Design, selections and permits come before construction, and cabinets take weeks to arrive. We tell you how a kitchen like yours fits together in time.

No obligation

The visit and the estimate are free. Take the estimate, compare it with others, and decide when you are ready.

If you go ahead, the same visit is the start of the project. One project manager is your point of contact, we prepare and file the permits, the work area is closed off against dust and cleaned each day, and we walk the finished kitchen with you at the end. The whole sequence is on the kitchen remodeling page.

Decisions

Six things to think about before we meet

You do not need answers. Having thought about the questions is enough.

Layout

Does the sink, range and fridge triangle work, or do people collide? Would an island fit, or does a peninsula make more sense in the room you have?

Storage

Count what has no home today: pots, small appliances, the recycling. Drawers, pull-outs and a pantry are easier to plan from a list.

Counters and backsplash

Quartz, quartzite, granite and butcher block wear differently and cost differently. Decide how much upkeep you will put up with.

Appliances

Sizes drive the cabinet plan, and a move from gas to induction or the other way changes the wiring or the gas line. Pick the big ones early.

Lighting

Ceiling lights for the room, under-cabinet lights for the counter and something over the island or table, each on its own switch.

Budget

Know the number you would like to spend and the number you will not go past. It tells us which choices to put in front of you.

Styles

Four kitchen styles to start from

Most kitchens borrow from more than one. Pointing at a picture is often the quickest way to say what you like.

  • Illustration of a modern kitchen with flat white cabinets, a stone island with a waterfall edge and four wooden stools

    For illustration

    Modern

    Flat cabinet fronts, few visible handles, one stone carried from the counter down the side of the island.

  • A white kitchen with a paneled island, round leather stools, glass globe pendants and white subway tile

    For illustration

    Transitional

    Framed cabinet doors and subway tile with simpler lines and warmer metals than a traditional kitchen.

  • Illustration of a kitchen with oak cabinets, green tile, a farmhouse sink, slate floor tile and copper pendant lights

    For illustration

    Craftsman

    Wood cabinets with visible grain, handmade-looking tile and metal that is meant to age.

  • Illustration of a farmhouse kitchen with sage green cabinets, open wood shelves, a wood-topped island and ceiling beams

    For illustration

    Farmhouse

    An apron-front sink, open shelves, painted cabinets and a wood top on the island.

These four pictures are here to illustrate the styles. They are not Giant Builders projects. For more finished rooms, see the kitchen ideas gallery and our kitchen before and after photos.

Cost

What a kitchen remodel costs in Seattle

A budget is easier to set with a few real numbers in hand. Most full kitchen remodels in Seattle land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls or adds space starts around $150,000.

Washington charges sales tax on the whole remodeling contract, labor included. In Seattle the combined rate is 10.55% this quarter, so put it in the budget from the start.

For a range based on your own room, try the remodel cost calculator. The line-by-line detail is in our guide to kitchen remodel costs in Seattle, and the permit side is in the kitchen permit guide.

Kitchen remodels in Seattle: published job costs
ProjectJob cost
Minor kitchen remodel, midrange$32,271
Major kitchen remodel, midrange$95,542
Major kitchen remodel, upscale$188,401
Remodeling magazine, 2025 Cost vs. Value report, Seattle. Averages for a defined scope, not a quote for your kitchen.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Kitchen design consultation questions, answered

01

Is the kitchen design consultation really free?

Yes. The visit, the measuring and the written estimate cost nothing, and you are under no obligation to hire us afterwards.

02

What happens during the consultation?

We come to the house, walk the kitchen with you, and listen to what is not working. We measure the room and look at the electrical panel, the plumbing, the walls and the range hood vent. Then we talk through layouts, cabinets, counters and budget. After the visit you receive a written, itemized estimate.

03

Do I need to know what I want before you come?

No. A list of what bothers you about the kitchen today is enough to start from. Pictures of kitchens you like help, and so does a rough budget, but most people work out the details during the visit and after it.

04

Do you design the kitchen, or do I need my own designer?

We plan the layout, the cabinet elevations and the material selections with you as part of the project. If you already work with a designer or an architect, we build from their drawings.

05

How much does a kitchen remodel cost in Seattle?

Most full kitchen remodels in Seattle land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls or adds space starts around $150,000. For reference, Remodeling magazine's 2025 Cost vs. Value report puts a midrange major kitchen remodel in Seattle at $95,542 and a minor one at $32,271. Washington sales tax applies to the whole contract, labor included: 10.55% in Seattle.

06

Do I need a permit to remodel my kitchen in Seattle?

Often, yes. Seattle does not require a building permit for minor work worth $6,000 or less in a six-month period, or for installing cabinets and new surface finishes. Moving or adding plumbing needs a plumbing permit from Public Health Seattle & King County, new wiring needs an electrical permit from SDCI, and removing or altering a bearing wall always needs a building permit. We sort out which apply and file them.

07

How long does a kitchen remodel take?

Plan on 8 to 12 weeks of construction for a full remodel, less for a refresh and more when walls move. Design, selections and permits come first and usually take 4 to 10 weeks, and custom cabinets can take 6 to 12 weeks to arrive. We give you a schedule before work starts.

08

Which areas do you serve?

Seattle and the Eastside, including Bellevue, Kirkland, Redmond, Mercer Island, Renton and Issaquah, and south through Kent, Auburn and Federal Way to Tacoma.

Free estimate

Book your free kitchen design consultation

Tell us a little about the kitchen. We call or email within one business day to set a time, then come out, measure and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

When would you like to start?

We use your details to answer you. Nothing else.