What makes a shower curbless, and what size does it need to be?

A curbless shower, also called zero-threshold or roll-in, has no dam at its entry. The bathroom floor runs straight into the shower, and the shower floor slopes down to a drain. It is the usual choice for a bathroom built to age in place, and it suits large tile and open bathrooms.

Washington's plumbing code, the 2021 Uniform Plumbing Code as amended in chapter 51-56 WAC, still applies. A shower compartment must have at least 900 square inches of finished floor and be able to hold a 30-inch circle, measured at the height of the threshold and kept clear up to 70 inches above the drain. Showers designed to ICC A117.1, the national accessibility standard, and receptors at least 30 by 60 inches are exempt from those minimums (WAC 51-56-0400, section 408.6).

How do you get the shower floor lower than the bathroom floor?

Three ways to drop a shower floor
MethodHow it worksWhat to watch
Recess a wood floorThe subfloor in the shower area comes out and is reset lower on new framing between or beside the joists, leaving depth for the slope and the waterproofingJoists may not be notched past the code's limits, so new or reinforced framing is common. This is structural work
Cut a concrete slabOn a slab or in a basement, the concrete is cut out, the drain is trenched in, and the area is poured back lowerThe depth and slope of the drain line under the slab
Raise the rest of the roomThe bathroom floor outside the shower is built up to the level the shower needsA step at the bathroom door, unless the hall floor rises too

Seattle's residential code limits notches in sawn lumber joists to one-sixth of the joist's depth and bars them from the middle third of the span. Holes bored for a drain line may not exceed one-third of the joist's depth or come within 2 inches of its top or bottom. Cuts in I-joists and other engineered lumber are prohibited unless the manufacturer allows them or a registered design professional designs them (SRC R502.8).

Cutting the joists down to make room is therefore rarely allowed as is. The usual answers are a lowered subfloor on new framing, added or sistered joists, or an engineered design. Any of these is a change to the structure and needs a building permit. In Seattle an interior alteration like this may qualify for SDCI's quick subject-to-field-inspection route, but Tip 316 sends any project that lowers a basement floor to full plan review.

Which drain works best: a center drain or a linear drain?

A center drain needs the floor sloped down from all four sides, which is why small tiles are common there: they follow the four-way slope. A linear drain, a long, narrow channel along the back wall or across the entry, lets the whole floor slope one way. That suits large tile, and a wheelchair rolls more easily over a single plane.

Washington's plumbing code requires a shower waste outlet and tailpiece of at least 2 inches. When a tub is replaced with a shower in a home and a 2-inch line is not readily available, the authority may approve a 1 1/2-inch waste, but only with a single showerhead of 1.8 gallons per minute. Every showerhead is limited to 1.8 gallons per minute at 80 psi (WAC 51-56-0400, sections 408.2 and 408.4).

Plan the valve with the drain. In an April 17, 2024 plumbing newsletter, Public Health Seattle and King County said tiled, glass-enclosed showers had failed final inspection under the code's rule on valve and showerhead locations, and that if a typical adult cannot reach the temperature controls without getting wet, the installation is likely not compliant. A valve near the entry, with the head on the far wall, avoids that.

How is a curbless shower waterproofed?

A waterproof layer has to run without a break across the shower floor, up the walls and into the drain. Tile and grout are not waterproof on their own. There are two common systems: a liner under a sloped mortar bed, with weep holes at the drain, or a bonded membrane, sheet or liquid, applied directly under thin-set tile. For a bonded membrane, look for one made to ANSI A118.10, the American National Standard for load-bearing, bonded, waterproof membranes under tile, and installed to ANSI A108.13.

With no curb, some water will reach the floor outside the shower. A sound curbless design carries the waterproofing past the shower opening, often across the whole bathroom floor, and keeps the room's floor level or sloped gently toward the shower.

Behind wall tile, Seattle's code lists the backer boards allowed in tub and shower areas: glass mat gypsum, fiber-reinforced gypsum, fiber-cement and cementitious backer units (SRC Table R702.4.2). Water-resistant gypsum board may not be used where it will be directly exposed to water, and may not go over a Class I or II vapor retarder, such as polyethylene sheet, in a shower or tub compartment (SRC R702.3.7).

Before tile goes on, the waterproofed floor should be flood tested: the drain is plugged and water is left standing on the pan, then checked for any drop. Ask whether the plumbing inspector wants to see the test.

What makes a curbless shower safe to use?

  • Slip resistance. ANSI A326.3, the tile industry's slip test, classes tile for level interior floors walked on when wet at a wet dynamic coefficient of friction of 0.42 or more, or as the maker declares. Ask for that classification, and remember that a shower floor is sloped, not level.
  • Safety glass. Glass in a shower enclosure, or within 60 inches of the shower's edge, counts as a hazardous location when its bottom edge is less than 60 inches above the floor, and must be safety glazing (SRC R308.4.5).
  • Water temperature. The Consumer Product Safety Commission urges lowering water heaters to 120 degrees Fahrenheit to reduce scald injuries.
  • Headroom. Seattle's code wants a ceiling of at least 6 feet 8 inches over a 30 by 30 inch area at the showerhead (SRC R305.1).
  • Walls ready for grab bars and a seat. Solid backing framed in while the walls are open; see the aging-in-place article.

What permits and costs come with a curbless shower in Seattle?

Three permits are usual in Seattle. A plumbing permit from Public Health Seattle and King County covers the drain and the valve, at $137 plus $27 per fixture in 2026. An electrical permit from SDCI covers a fan, lights or a heated floor. A building permit from SDCI is needed when the floor framing or walls change. The bathroom permit guide covers each one. In other King County cities, the city's building department issues the plumbing permit.

On cost, the most useful published local figure is Remodeling magazine's 2025 Cost vs. Value report. It prices a universal design bathroom remodel in Seattle at $58,151, against $36,146 for its midrange bathroom remodel, and estimates the universal design project recovers 59.2% of its cost at resale, against 46.8%. The bathroom cost guide has ranges by scope.

Smallest shower floor Washington's plumbing code allows, able to hold a 30-inch circle
900 sq in
Smallest shower floor Washington's plumbing code allows, able to hold a 30-inch circle
Seattle plumbing permit in 2026, plus the second figure per fixture
$137 + $27
Seattle plumbing permit in 2026, plus the second figure per fixture
Universal design bathroom remodel, Seattle, Cost vs. Value 2025
$58,151
Universal design bathroom remodel, Seattle, Cost vs. Value 2025