Local remodel guide · King County
Home remodeling in Seattle, WA
What a Seattle homeowner needs to know before a kitchen, bathroom or basement remodel: when the city wants a permit, which office issues it, what a remodel costs here and what the current ADU rules allow.
By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short version
Remodeling in Seattle at a glance
The facts a homeowner in Seattle asks for first. Each one is explained further down, and the sources are at the end of the page.
| Question | Answer |
|---|---|
| Who issues permits | The Seattle Department of Construction and Inspections (SDCI) issues building and electrical permits. Public Health Seattle & King County issues plumbing and gas piping permits. |
| Where to apply | Online, through the Seattle Services Portal. |
| When no permit is needed | Minor repairs or alterations worth $6,000 or less in any six-month period, unless they touch structure, the outside walls, exits, light, ventilation or fire resistance. |
| Fastest permit | A subject-to-field-inspection (STFI) permit, for small remodels. SDCI says the screening takes a few days. |
| Sales tax | 10.55% on the whole contract, labor included, for October 1 to December 31, 2026. |
| ADUs | No more than two per lot. Each up to 1,000 square feet, or 1,200 with three or more bedrooms. |
Permits
Who issues remodel permits in Seattle
In Seattle a remodel can involve two agencies. SDCI issues the building permit and the electrical permit. Plumbing and gas piping permits come from Public Health Seattle & King County, a separate office with its own inspectors. Public Health requires a permit whenever a plumbing or gas piping system is installed, moved or changed.
SDCI takes most applications online through the Seattle Services Portal, and most of its help is online too: live chat, video calls and email through the SDCI Services page. An information desk on the 4th floor of the Seattle Municipal Tower assists people who need language help or help using the online services.
The $6,000 rule
SDCI does not require a building permit for minor repairs or alterations that cost $6,000 or less in any six-month period, counting the fair market value of labor and parts. The exemption has limits. A permit is always needed for load-bearing supports, for changes to the building envelope, and for work that reduces egress, light, ventilation or fire resistance.
The quick route: subject to field inspection
A remodel or addition needs a construction addition or alteration permit. Small projects can qualify for a subject-to-field-inspection (STFI) permit: SDCI screens the application in a few days, and the inspector checks the work on site. Non-structural interior alterations of baths, kitchens and bedrooms qualify. So do new beams or headers up to 8 feet long under two stories and a roof, or 14 feet under one story and a roof, without an engineer’s drawings.
Not eligible for STFI: second-story additions, turning an unheated attic into living space, lowering a basement floor, creating an ADU or DADU, and roofing replacement.
Permit office
Seattle Department of Construction and Inspections
Seattle Municipal Tower700 Fifth AvenueSeattle, WA 98104Most services are online. The information desk on the 4th floor is open Monday, Wednesday and Friday, 9 am to 3 pm, and Tuesday and Thursday, 10:30 am to 3 pm.
What needs a permit
Which projects need a permit in Seattle
| Project | What Seattle requires |
|---|---|
| Kitchen remodel | Installing cabinets and new surface finishes over existing walls is exempt. New circuits need an electrical permit from SDCI, a moved sink needs a plumbing permit from Public Health, and any change to a bearing wall or an outside wall needs a building permit. A kitchen with no structural changes can use an STFI permit. |
| Bathroom remodel | New finishes over existing walls are exempt. Moving or adding fixtures needs a plumbing permit from Public Health, and new wiring needs an electrical permit from SDCI. A bathroom with no structural changes can use an STFI permit. |
| Basement finishing | A basement finish goes well past the $6,000 exemption and needs a construction permit. Work that reduces egress, light or ventilation always needs one. Lowering the basement floor, or creating a rental unit, is not eligible for STFI and goes through full review. |
| Walls and beams | Load-bearing supports always need a permit. A new beam or header up to 8 feet long (two stories and a roof above) or 14 feet (one story and a roof above) can go the STFI route without an engineer. |
| Additions and dormers | A ground-level, one-story addition up to 750 square feet, or a dormer up to 14 feet wide and 200 square feet, can use STFI. A second story or an attic conversion needs full plan review. |
| ADU or DADU | Always a full permit. Building an accessory dwelling unit, or converting a structure into one, is not eligible for STFI. |
Work that usually needs no building permit in Seattle
- Minor repairs or alterations worth $6,000 or less in any six-month period
- Installing kitchen cabinets
- New surface finishes over existing walls, and painting
- Replacing roofing or siding on a house, when no structural changes are made
- A one-story detached shed with less than 120 square feet of roof area, on a slab on the ground
- A platform less than 18 inches above grade that is not over a basement or another story
- A fence less than 8 feet tall, with no concrete or masonry higher than 6 feet
From SDCI's page Do You Need a Permit? The list does not apply in an environmentally critical area. These exemptions are from the building permit: electrical and plumbing work can still need permits of their own.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs. We also wrote a permit guide for each room: kitchen, bathroom and basement.
Timing
How long a permit takes in Seattle
SDCI says the screening for an STFI permit takes a few days. Fees are based on the value of the project, plus a technology fee. The department’s base fee and hourly rate are $292 in 2026.
Projects that do not fit STFI go through plan review, which starts with an intake appointment. SDCI says it tries to finish the first review of a simple application in two to three weeks and of a complex one in eight weeks, and that the total time depends on how complex the project is, how many corrections the plans need, and how quickly and completely the applicant answers the reviewer’s comments.
One figure the city does publish is for backyard cottages. With one of its pre-approved DADU plans, SDCI says most permits are issued in 2 to 6 weeks.
| Step or route | Published figure |
|---|---|
| STFI screening | A few days |
| Pre-approved DADU plan | 2 to 6 weeks in most cases |
| Intake of an application that needs plan review | Usually within two to three weeks of a complete upload |
| First plan review (SDCI aim) | 2 to 3 weeks for a simple application, 8 weeks for a complex one |
| SDCI base fee and hourly rate, 2026 | $292 |
Cost
What a remodel costs in Seattle
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
Remodeling magazine publishes job costs for the Seattle market each year, and its 2025 figures are a public benchmark anyone can check. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Sales tax in Seattle
Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Seattle is 10.55% for October 1 to December 31, 2026. On a $100,000 contract, 10.55% is $10,550 of tax. The state can change local rates each quarter, so check the rate again when you sign.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU rules in Seattle
Seattle rewrote its ADU rules twice in 2025. Ordinance 127211 brought the city in line with state law from June 30, 2025. Ordinance 127376, passed on December 16, 2025 with the middle housing codes, rewrote the same section of the code and raised the size limit to 1,200 square feet for units with three or more bedrooms.
Older city handouts are out of date. SDCI Tips 116A and 116B still carry an August 2023 date and show rules that no longer apply.
The full rules, with the code sections, are in our Seattle ADU rules guide. For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.
| Rule | In Seattle |
|---|---|
| How many | No more than two per lot: attached, detached or stacked. A lot can hold four or more homes, but only two of them may be ADUs. |
| Size | 1,000 square feet with up to two bedrooms, 1,200 square feet with three or more |
| Parking | No off-street parking required |
| Owner occupancy | Not required |
| Density | ADUs count toward the number of homes allowed on the lot |
| Sale | A unit may be sold as a condominium. It may not be subdivided from the main house. |
| Converting an existing building | An accessory structure that stood before July 23, 2023 may become a detached unit even where it does not meet the lot coverage, yard or setback rules |
| Sewer capacity charge | SDCI reports every ADU permit to King County, which bills a sewage treatment capacity charge |
| Pre-approved plans | A permit in 2 to 6 weeks in most cases |
State and regional rules
Rules that apply in Seattle and across the region
These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.
Check for asbestos before demolition
The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.
Sales tax covers labor too
For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.55% in Seattle this quarter. Ask every bidder whether the price they quote includes it.
Hire a registered contractor
Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.
Giant Builders in Seattle
Remodeling services in Seattle
Giant Builders Seattle is a licensed general contractor based in Seattle. One company handles the design, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See the rooms themselves on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Seattle remodeling questions, answered
01Do I need a permit to remodel my kitchen in Seattle?
Often, yes. Seattle does not require a building permit for minor work worth $6,000 or less in a six-month period, or for installing cabinets and new surface finishes. Moving or adding plumbing needs a plumbing permit from Public Health Seattle & King County, new wiring needs an electrical permit from SDCI, and changing a bearing wall always needs a building permit. Many kitchens qualify for a quicker subject-to-field-inspection permit.
02Do I need a permit to remodel a bathroom in Seattle?
For most remodels, yes. New tile and finishes over existing walls are exempt, but moving or adding fixtures needs a plumbing permit from Public Health Seattle & King County, and new wiring needs an electrical permit from SDCI. A bathroom with no structural changes can use a subject-to-field-inspection permit.
03Do I need a permit to finish my basement in Seattle?
Yes. A basement finish goes well past the $6,000 exemption and needs a construction permit, and any work that reduces egress, light or ventilation always needs one. Lowering the basement floor or creating a rental unit cannot use the quick STFI route and goes through full review.
04What is an STFI permit in Seattle?
STFI means subject to field inspection. It is a construction permit for small projects that SDCI screens in a few days and checks on site, without full plan review. Non-structural kitchen, bath and bedroom alterations qualify, and so do one-story ground-level additions up to 750 square feet. Second-story additions, attic conversions and ADUs do not.
05Who issues plumbing permits in Seattle?
Public Health Seattle & King County issues plumbing and gas piping permits in Seattle and inspects that work. SDCI issues the building permit and the electrical permit. A typical kitchen or bathroom remodel involves both agencies.
06What is the sales tax on a remodel in Seattle?
10.55% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,550. The state can change local rates each quarter.
07How much does a kitchen remodel cost in Seattle?
Remodeling magazine's 2025 Cost vs. Value report puts a midrange minor kitchen remodel in Seattle at $32,271, a midrange major remodel at $95,542 and an upscale one at $188,401. Most full kitchen remodels here land between $75,000 and $130,000, before the 10.55% sales tax.
08How many ADUs can I build on a Seattle lot?
No more than two, and they can be attached, detached or stacked. A unit can be up to 1,000 square feet with up to two bedrooms, or 1,200 square feet with three or more. No off-street parking is required, and the owner does not have to live on the lot.
Free estimate
Planning a remodel in Seattle?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Guides for nearby cities
Sources
- 01Seattle SDCI: Do you need a permit? (read Nov 18, 2026)
- 02Seattle SDCI: house additions and remodels (read Nov 18, 2026)
- 03Seattle SDCI: construction permit, subject to field inspection (read Nov 18, 2026)
- 04Seattle SDCI Tip 316: subject-to-field-inspection permits (read Nov 18, 2026)
- 05Seattle SDCI: construction permit, addition or alteration (review times) (read Nov 26, 2026)
- 06Seattle SDCI: how do you get a permit? (read Nov 18, 2026)
- 07Seattle SDCI: hours and location (read Nov 18, 2026)
- 08Public Health Seattle & King County: plumbing and gas piping permits (read Nov 18, 2026)
- 09Seattle SDCI: 2026 fee subtitle (read Nov 18, 2026)
- 10Seattle Ordinance 127376: the current accessory dwelling unit rules (passed Dec 16, 2025) (read Nov 18, 2026)
- 11Seattle Ordinance 127211: the June 2025 accessory dwelling unit rules (read Nov 18, 2026)
- 12Seattle SDCI: accessory dwelling units (read Nov 18, 2026)
- 13Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 14Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 15Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 16Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 17Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 18Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 19Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)