When does a basement bedroom need an egress window?

Whenever a new sleeping room is created. Section R310.1 of the residential code says basements, habitable attics and every sleeping room need at least one operable emergency escape and rescue opening, and that a basement with sleeping rooms needs one in each of them. For an existing basement, section R310.6 (as Seattle's code numbers it) narrows this: new sleeping rooms created in an existing basement need the opening, and other alterations or repairs of an existing basement do not.

So a basement family room, office or gym can go without one, and a basement bedroom cannot. A room without an escape opening is not a legal sleeping room and should not be rented or listed as one.

The exceptions

  • Storm shelters, and basements used only to house mechanical equipment with no more than 200 square feet of floor area.
  • A house with an automatic sprinkler system installed under section P2904, where the basement has either one code-compliant means of egress plus one escape opening, or two code-compliant means of egress.
  • Additions follow their own rule: each new sleeping room needs an opening, and a new basement needs one unless it has a bedroom with an opening or connects to an existing basement that has one (section R310.5).

The rules are statewide. Washington's building code, which includes the International Residential Code with the state's amendments, is in effect in every county and city (RCW 19.27.031); the current edition took effect on March 15, 2024, with the state's R310 amendments in WAC 51-51-03100. SDCI says Seattle's 2024 codes will take effect no sooner than May 2027. Other cities may adopt local amendments.

What size does a basement egress window have to be?

The numbers are minimums for the clear opening, the space a person passes through when the window is opened the normal way, not the size of the frame.

Net clear opening, or 5 sq ft for a grade-floor opening
5.7 sq ft
Net clear opening, or 5 sq ft for a grade-floor opening
Minimum clear height
24 in
Minimum clear height
Minimum clear width
20 in
Minimum clear width
Highest the bottom of the opening may be above the floor
44 in
Highest the bottom of the opening may be above the floor
Escape opening rules in section R310, as adopted in Washington
RuleRequirementSection
Clear opening areaAt least 5.7 sq ft. At least 5 sq ft for a grade-floor opening, one whose sill is no more than 44 in above or below the ground outside.R310.2.1; chapter 2 definitions
Clear heightAt least 24 inR310.2.2
Clear widthAt least 20 in, from normal operation of the window or doorR310.2.2
Sill heightBottom of the clear opening no more than 44 in above the floorR310.2.3
OperationOpens from inside without keys, tools or special knowledge. Window opening control devices meeting ASTM F2090 are allowed, no more than 70 in above the floor.R310.1.1
DoorsA door used as the escape opening must be side-hinged or sliding.R310.3
Bars, grilles and coversMust leave the required clear opening and release from inside without a key, a tool or more force than opening the window takes.R310.4.4

Read in the 2021 Seattle Residential Code, chapter 3, which prints Washington's amendments to section R310. The inspector applies the code to your window; this table is a summary.

The arithmetic

The area and both dimensions have to be met at once. 5.7 square feet is 820.8 square inches, so an opening exactly 24 inches high needs about 34.2 inches of clear width, and one exactly 20 inches wide needs about 41 inches of clear height. An opening at the 24 by 20 inch minimums gives only 480 square inches, about 3.3 square feet, and fails.

A casement swings its whole sash out, while a slider or a hung window opens only one of its two sashes and needs a larger frame for the same clear opening. Ask for the net clear opening of the exact model and size.

What does a basement window well need?

A well, which the code calls an area well, is required wherever the bottom of the escape opening is below the ground outside (section R310.4).

Area well rules in section R310.4
RuleRequirementSection
SizeAt least 9 sq ft of horizontal area, projecting at least 36 in from the wall and at least 36 in wideR310.4.1
Room to openThe well must let the window or door open fullyR310.4.1
Ladder or stepsRequired, permanently fixed, when the well is deeper than 44 in. The open window may not block them.R310.4.2
Ladder rungsAt least 12 in inside width, projecting at least 3 in from the wall, no more than 18 in apart vertically for the full depthR310.4.2.1
StepsAt least 12 in wide, treads at least 5 in deep, risers no more than 18 inR310.4.2.2
EncroachmentThe ladder or steps may take up to 6 in of the required well dimensionsR310.4.1, exception
DrainageConnected to the foundation drainage system, unless the house sits on well-drained Group I soilsR310.4.3
CoversRemovable or releasable from inside without a key, a tool or extra force, leaving the required openingR310.4.4

Drainage is the line that matters most in Seattle's wet season, since a well with no drain collects rain right against the window. The dry basement guide covers the foundation drain the well ties into.

Where can a basement escape window open to?

To the outside, with a way to the street. Section R310.1, as amended by Washington, says the opening must open directly to a public way, or to a yard or court with an unobstructed path at least 36 inches wide that leads to a public way.

  • Gates on that path are allowed if they open without keys, tools or special knowledge.
  • A window well with a removable cover that meets section R310.4.4 does not count as an obstruction.
  • Under a deck, porch or cantilever, the opening must open fully and have a clear path at least 36 inches high and 36 inches wide, and no more than 60 inches long, to a yard or court. The path is measured from the outside face of the glass, or from the far wall of the window well.

Look outside before choosing the room. The escape window often decides the floor plan, because the bedroom has to sit on a wall where a well clears the gas meter, the side sewer, the property line and the path to the street.

Can an existing basement window count as the escape opening?

Sometimes. For a new bedroom in an existing basement, Seattle's code accepts an operable window that meets section R310.6.1 (the exception still cites its old number, 310.7.1). That section sets lower numbers for existing windows: a net clear opening of at least 4 square feet, at least 22 inches high and 20 inches wide. A replacement window also qualifies if it meets those numbers and is the manufacturer's largest standard size that fits the existing frame or rough opening, in the same operating style or one that opens at least as wide.

Replacing an old window that does not serve a new bedroom is simpler still: Seattle's existing-buildings chapter exempts the replacement from the size rules if it is the largest standard size that fits the opening, in the same style or one that opens wider, and is not part of a change of use (section R4402.5.4). It still has to meet the energy code.

What permit does a new basement egress window take in Seattle?

A building permit, every time. SDCI says a permit is needed for any change to the building envelope, however small the project, and cutting a new opening in a foundation wall is one. A basement bedroom with no other structural change fits the subject-to-field-inspection (STFI) permit, a quicker permit the city typically processes within a few working days and the inspector checks on site. Three things can push it toward engineering or full plan review:

  • Structure. SDCI Tip 316 says that when you add a window or door in an exterior wall you must show the structure still resists wind and earthquake loads, and the city may ask for an engineer's stamped plans.
  • Digging near the lot line. Excavation deeper than 4 feet near a property line, or 3 feet next to a right-of-way, falls off the STFI route unless it can be contained on the site with cuts at a 45-degree slope.
  • Critical areas. Exterior work on a lot with a steep slope or another environmentally critical area needs SDCI staff approval to stay on STFI.

The new window must also meet the Seattle Energy Code's prescriptive requirements, which cap the U-factor of windows at 0.30 (Table R402.1.3). The basement permit guide covers the rest of the permit for the room.

  1. 01

    Pick the wall

    One where the well clears utilities and the lot line, with a 36-inch route to the street or alley.

  2. 02

    Check the structure

    Size the header over the opening and decide whether the city will want an engineer's stamp.

  3. 03

    Get the permit

    SDCI says work that needs a permit may not start until the permit is issued.

  4. 04

    Excavate, cut and set

    Dig the well, saw-cut the wall, frame the opening, set the window, the well, any ladder and the drain.

  5. 05

    Inspect

    The inspector checks the opening, the well and the rest of the bedroom.

What else does a legal basement bedroom need?

The window is one of several rules that make a basement room a bedroom under the 2021 Seattle Residential Code:

  • A ceiling of at least 6 feet 8 inches, with beams and ducts allowed down to 6 feet 4 inches (section R4404.6).
  • At least 70 square feet of floor and 7 feet in every direction (section R304).
  • Smoke alarms throughout the house to the new-home standard, including one in the bedroom, and carbon monoxide alarms outside each sleeping area and on each level (sections R314 and R315).
  • Heat able to hold 68 degrees F without portable heaters (section R303.10).

Giant Builders measures the ceiling and finds the wall where an escape window can go at the free in-home estimate, then prepares and files the permits. The basement finishing page and the basement cost guide cover the rest of the project.