The short answer
A Seattle Craftsman, built roughly 1900 to 1930, often still has knob-and-tube wiring, galvanized steel water pipe, lead paint and a frame that is not bolted to its foundation. Before demolition, the Puget Sound Clean Air Agency requires an asbestos survey, and Washington's lead rules require a certified firm for paid work that disturbs paint. If the remodel replaces wall surfaces in more than 60 percent of the house, SDCI is likely to treat it as a substantial alteration, which brings seismic upgrades, and an altered brick chimney must meet SDCI Director's Rule 7-2025.
Key points
- 01Plan for the house's age first: wiring, pipes, foundation bolts, lead paint and asbestos come before cabinets and tile.
- 02The Puget Sound Clean Air Agency requires an asbestos survey before any renovation, and pre-1978 paint calls for a lead-safe certified firm.
- 03Replacing wall surfaces in more than 60 percent of the house is likely a substantial alteration in Seattle, which brings seismic work and, for a brick chimney, Director's Rule 7-2025.
- 04A designated landmark, or a house in one of Seattle's eight historic districts, needs a Certificate of Approval before exterior changes.
In this article (8 sections)
- 01What counts as a Seattle Craftsman?
- 02What is usually behind the walls of a Craftsman?
- 03What has to happen before demolition starts?
- 04When does a Craftsman remodel bring earthquake work?
- 05What happens to the brick chimney?
- 06Do I need approval to change the outside of a historic house?
- 07Can the basement or attic of a Craftsman become living space?
- 08In what order should a Craftsman be remodeled?
What counts as a Seattle Craftsman?
A Seattle historic resources survey of Fremont houses, published by the Department of Neighborhoods, dates the Craftsman style to about 1900 to 1930, and the one or one-and-a-half story Craftsman bungalow to about 1905 to 1930. It describes the look: a low-pitched roof with wide eaves, exposed rafter ends and braces, wood siding or shingles, a prominent porch, a brick or stone chimney and double-hung windows with divided panes.
Washington's Department of Archaeology and Historic Preservation calls the Craftsman the most frequently built house type in the country between 1903 and 1930. Seattle had its own bungalow trade, with a bungalow magazine published here from 1912 to 1918, and the Fremont survey found that most houses it studied were built from standard plan books.
The same survey dates the American Foursquare, the two-story box with a low hipped roof that Seattle calls the Classic Box, to about 1890 to 1920. It shares most of the conditions below. For houses of other decades, see what is behind your walls.
What is usually behind the walls of a Craftsman?
In a house that has not already been redone, expect some or all of the conditions in this table. Each one is cheaper to deal with while the walls and floors are open.
| Condition | What the source says | What it means for the remodel |
|---|---|---|
| Knob-and-tube wiring | HUD's rehabilitation inspection guide says it is still found fairly often in houses built before 1930, and its insulation turns brittle with age. | Rewire the rooms you open. Insulating over live knob-and-tube needs a licensed electrical contractor's written survey in Seattle. |
| Galvanized steel water pipe | HUD puts its service life at 20 to 50 years; rust-colored water and low pressure are signs of advanced wear. | Replace it back to a sound connection while walls and floors are open. |
| Lead paint | EPA: 87% of homes built before 1940 have some lead-based paint. | Paid work that disturbs paint needs a lead-safe certified firm and lead-safe work practices. |
| Asbestos | EPA lists pipe and furnace insulation, vinyl flooring and its adhesive, textured wall and ceiling coatings, and roofing and siding shingles among common places. | Survey before demolition, as the Puget Sound Clean Air Agency requires. |
| No anchor bolts or braced cripple walls | The Washington Department of Natural Resources says many older houses are not bolted to their foundations. | Bolt and brace from the basement or crawl space, ideally during the remodel. |
| Unreinforced brick chimney | SDCI calls unreinforced masonry chimneys extremely vulnerable to earthquake damage. | Altering one, or a substantial alteration, brings Director's Rule 7-2025. |
| An old heating oil tank | A 2020 City of Seattle study found more than 90% of the city's oil-heated homes were built before 1960. | A tank out of service for a year or more must be decommissioned under a Fire Department permit. |
Sources listed at the end of this article.
Each of the big three has its own guide: knob-and-tube wiring, galvanized pipes and bolting and bracing.
What has to happen before demolition starts?
Two checks are required before the first wall is opened, and two more belong with them because they change the scope.
- 01
Asbestos survey
The Puget Sound Clean Air Agency requires an asbestos survey before any renovation. An owner who lives in the single-family house may survey it personally; otherwise an AHERA-certified building inspector does it, and a copy stays on site. Removing friable asbestos needs a notification to the agency first, except for under 10 linear feet of pipe or 48 square feet of surface per structure and calendar year.
- 02
Lead-safe plan
In a house built before 1978, any paid work that disturbs paint must be done by a certified firm using lead-safe work practices. In Washington, the Department of Commerce certifies firms and renovators. More in lead-safe renovation.
- 03
Find any oil tank
The Seattle Fire Department has no record of where underground heating oil tanks were installed, because installing one never needed a permit, and its records cover only residential removals done under permit after 1997. The Seattle Fire Code requires a tank out of service for a year or more to be decommissioned, by removal or by filling it in place, under permit code 6103 ($184 per tank), with an ICC-certified decommissioner on site for the whole job.
- 04
Look under the house
From the basement or crawl space, check for anchor bolts through the wood sill, bracing on the short cripple walls and the condition of the foundation. These decide whether seismic work goes into the scope now.
When does a Craftsman remodel bring earthquake work?
In Seattle it does when the remodel is large enough to count as a substantial alteration. SDCI's Tip 316 (updated October 29, 2026) says that reconfiguring spaces or replacing wall surfaces in more than 60 percent of the house likely makes it one, and section R107.5.1.2 of the 2021 Seattle Residential Code then requires seismic upgrades.
To keep such a project on the quicker subject-to-field-inspection (STFI) permit, Tip 316 asks for one of three things: engineer-stamped plans that strengthen the foundation and cripple walls throughout the house, approved Earthquake Home Retrofit plans, or proof that the house was built under the 1985 Uniform Building Code or a later code. A Craftsman cannot use the third.
Below that line the retrofit is voluntary, and still easiest with the basement or crawl space open. For opening walls between rooms, an STFI permit allows new beams up to 8 feet long under two stories and a roof, or 14 feet under one story and a roof, without an engineer (Tip 316); see opening a wall.
What happens to the brick chimney?
Nothing, unless you alter it or the remodel is a substantial alteration. Then SDCI Director's Rule 7-2025, in effect since January 8, 2026, applies under section R107.5.3 of the Seattle Residential Code. Its main points:
- A building permit is required, with fees based on the value of the work, except for minor patching or work under the $6,000 permit exemption.
- Pre-designed (prescriptive) fixes may be used for chimneys less than 12 feet tall above the roof line; taller ones need an engineer or must be shortened first.
- A chimney that extends more than 3 feet above the roof next to it must be braced back to the house at two points or more.
- Altered or repaired sections must be reinforced masonry, or the chimney is replaced above the smoke chamber with a factory-built metal chimney.
- Removing the chimney, or taking it down to the roof line, capping it and strapping it to the house, are also allowed.
Do I need approval to change the outside of a historic house?
Only if the house is a designated Seattle landmark or stands in one of the city's eight historic districts. The Department of Neighborhoods says changes to the exterior of a landmark need a Certificate of Approval before work begins, even when no SDCI permit is required. In the Harvard-Belmont Landmark District, a residential district on Capitol Hill, a certificate is required before building, demolition and other permits are issued for work visible from a public right-of-way.
Most Craftsman houses are neither. Since July 27, 2025, state law (RCW 35.21.995) lets a city designate a property only if it is at least 40 years old and the owner consents, with three exceptions: properties over 125 years old, properties in zones that are neither residential nor mixed use, and properties inside an existing historic district.
Can the basement or attic of a Craftsman become living space?
Often, within limits on height. In an existing Seattle house, new habitable space in a basement or attic needs a ceiling at least 6 feet 8 inches high, and 6 feet 4 inches in bathrooms, toilet rooms and laundry rooms, with beams and ducts allowed down to 6 feet 4 inches (Seattle Residential Code R4404.6). Converting an unheated attic into living space cannot use an STFI permit and goes through full plan review (Tip 316).
A basement bedroom also needs an escape window; see egress windows for basement bedrooms and the basement permit guide.
In what order should a Craftsman be remodeled?
From the ground up, and from inside the walls out, so that no finished room has to be opened again.
- 01
Survey and test
Asbestos survey, lead-safe plan, oil tank search and a look at the foundation, as above.
- 02
Structure and water
Foundation repairs, bolting and bracing, chimney work, the roof and any water getting in.
- 03
Service and main lines
The electrical service if it must grow, the main water line, the drains and the side sewer, which the owner owns all the way to the public sewer main (Seattle Public Utilities).
- 04
Rough-in
New circuits, supply and drain lines and ducts, inspected before anything covers them.
- 05
Insulation
Seattle needs no building permit to insulate an existing building, and with the knob-and-tube gone, no wiring survey either.
- 06
Finishes
Walls, floors, trim, the kitchen and the bathrooms.
SDCI issues the building and electrical permits, and Public Health Seattle and King County issues the plumbing permit; the Seattle remodel guide covers both offices. Giant Builders looks at all of the above at the free in-home estimate and prepares and files the building permits.
Questions people also ask
01Do I have to rewire the whole Craftsman when I remodel one room?
02Can I take out an old oil tank myself?
03What does Seattle charge for an earthquake retrofit permit?
04How do I find out whether my house is a Seattle landmark?
05Is there help paying for repairs on an older Seattle house?
Sources
- 01Seattle Department of Neighborhoods: Historic Resources Survey Report, Fremont neighborhood residential buildings (January 2010) (read Nov 26, 2026)
- 02Washington Department of Archaeology and Historic Preservation: Architectural style guide, Bungalow (read Nov 26, 2026)
- 03HUD: Residential Rehabilitation Inspection Guide (National Institute of Building Sciences, February 2000) (read Nov 26, 2026)
- 04U.S. EPA: Frequent questions about testing for lead-based paint (read Nov 26, 2026)
- 05U.S. EPA: Learn about asbestos (read Nov 26, 2026)
- 06Puget Sound Clean Air Agency: Contractor renovation (asbestos) (read Nov 26, 2026)
- 07Washington Department of Commerce: Renovation, Repair and Painting (RRP) program (read Nov 26, 2026)
- 08Seattle Fire Department: Client Assistance Memo 5962, decommissioning residential heating oil tanks (updated March 2024) (read Nov 26, 2026)
- 09Seattle Fire Department: Residential heating oil tank decommissioning permit application, code 6103 (read Nov 26, 2026)
- 10Seattle Fire Department: Permits, questions about oil tank records (read Nov 26, 2026)
- 11City of Seattle: Heating oil tank policy recommendation (June 30, 2020) (read Nov 26, 2026)
- 12Seattle SDCI Tip 316: Subject-to-field-inspection permits (updated October 29, 2026) (read Nov 26, 2026)
- 132021 Seattle Residential Code, chapter 1: section R107.5, substantial alterations and URM chimneys (read Nov 26, 2026)
- 142021 Seattle Residential Code, chapter 44: section R4404.6, ceiling height in existing buildings (read Nov 26, 2026)
- 15SDCI Director's Rule 07-2025: Alteration and repair of unreinforced masonry chimneys (effective January 8, 2026) (read Nov 26, 2026)
- 16Washington Department of Natural Resources: A homeowner's guide to earthquakes in Washington State (read Nov 26, 2026)
- 17Seattle SDCI: Earthquake home retrofit permit (read Nov 26, 2026)
- 18Seattle SDCI: 2026 Fee Subtitle (Table D-2, single-family earthquake retrofit) (read Nov 26, 2026)
- 19Seattle Department of Neighborhoods: Landmarks (Certificate of Approval; RCW 35.21.995 note) (read Nov 26, 2026)
- 20Seattle Department of Neighborhoods: Harvard-Belmont Landmark District (read Nov 26, 2026)
- 21Seattle SDCI: Do you need a permit? (read Nov 26, 2026)
- 22Seattle Public Utilities: Your side sewer (read Nov 26, 2026)
- 23Seattle Office of Housing: Home repair loans and grants (read Nov 26, 2026)
- 242023 Seattle Electrical Code Supplement Quick Reference (effective November 15, 2024) (read Nov 26, 2026)
Rules, rates and programs change. This article was checked against the sources above on the dates shown. It is general information for homeowners, not legal, tax or engineering advice for a specific property.