Home remodeling in Edmonds, WA
What an Edmonds homeowner needs to know before a kitchen, bathroom or basement remodel: how to apply, what the city checks first, the critical area and tree rules, what a remodel costs and the ADU rules in force since July 2025.
By Giant Builders SeattleUpdated Facts checked Nov 26, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short version
Remodeling in Edmonds at a glance
The facts a homeowner in Edmonds asks for first. Each one is explained further down, and the sources are at the end of the page.
| Question | Answer |
|---|---|
| Which county | Snohomish County. |
| Who issues permits | The City of Edmonds Planning and Development department, at the Permit Center in City Hall. |
| Where to apply | Online only, at MyBuildingPermit.com, for building, land use and engineering permits. |
| Electrical permits | From the Washington State Department of Labor & Industries (L&I), not the city. |
| First step | A Critical Areas Determination from the Planning Division must be completed and on file. It is the first item on the city's remodel and addition checklist. |
| Review time | The city publishes no review target on its permit pages. |
| Sales tax | 10.7% on the whole contract, labor included, for October 1 to December 31, 2026. |
| ADUs | Two per house: up to 1,000 square feet in LDR-S and 1,200 square feet in LDR-M and LDR-L. |
Permits
Who issues remodel permits in Edmonds
Edmonds’ Planning and Development department issues building permits for houses in the city. All building, land use and engineering applications are filed online at MyBuildingPermit.com, and inspections are scheduled there too. Electrical permits are not issued by the city: they come from L&I.
What the city asks for on a remodel or addition
The city’s submittal handout for residential additions, remodels and alterations (updated March 2026) says a permit is required to add, remodel, alter, enlarge, repair, move, improve, remove or convert a dwelling. Fees for an addition are based on its square footage, and for an interior remodel on the licensed contractor’s bid. Only complete applications are accepted.
Before anything else, a Critical Areas Determination, issued by the Planning Division, must be completed and on file. It settles whether critical areas such as wetlands, streams or steep slopes affect the site, and the permit application then provides whatever the decision calls for. The handout’s list also includes a surveyed site plan and a stormwater management plan; ask the Permit Center which items an interior-only job needs.
Two Edmonds rules that catch remodels
- Materials management. An alteration or demolition over 750 square feet or $75,000 in value needs separate containers for recyclable and other waste, a salvage assessment filed with the application and a waste diversion report at the end.
- EV-ready wiring. When improvements exceed 50% of a house’s replacement cost, the city requires a dedicated 40-amp, 208/240-volt circuit for electric vehicle charging.
Building permit exemptions do not apply on a lot in an earth subsidence and landslide hazard area (ECDC 19.10) or a critical area (ECDC Title 23), so the critical areas check matters for small jobs too.
Permit office
City of Edmonds Permit Center
Edmonds City Hall121 5th Avenue NEdmonds, WA 98020Walk-in Monday, Tuesday, Thursday and Friday, 8:30 am to noon and 1 to 3 pm; closed Wednesdays. Staff answer by phone and remotely Monday to Friday, 8 am to 4:30 pm, at 425-771-0220.
What needs a permit
Which projects need a permit in Edmonds
| Project | What Edmonds requires |
|---|---|
| Kitchen remodel | A building permit, with the fee based on the contractor's bid, and an L&I electrical permit for new wiring. Cabinets, countertops and similar finish work are exempt. |
| Bathroom remodel | A permit when fixtures move or pipes change. Replacing a prefabricated fixture without changing valves or pipes is exempt. The regional MyBuildingPermit tip sheet notes that replacing a tub or shower needs a permit. |
| Basement finishing | A building permit. Replacing or adding insulation is exempt only when no drywall is removed or put up. |
| Additions | A building permit with the Critical Areas Determination, a surveyed site plan and a stormwater plan. Over 750 square feet or $75,000, the materials management rules apply. |
| Windows and doors | Replacing one needs no permit when no structural member changes, no new safety glazing is required and egress is not affected. |
| Re-roofing | An overlay is exempt, except over slate, clay or cement tile or on a roof that already has two or more layers. The regional tip sheet lists a tear-off re-roof as needing a permit in Edmonds. |
| Trees | On a developed house lot with no critical areas that cannot be subdivided, no tree permit. On an addition or new development, tree removal is reviewed with the application. |
Work that usually needs no building permit in Edmonds
- Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
- Replacing or adding insulation with no drywall removed or installed
- Minor like-for-like drywall repair outside fire-rated assemblies
- Replacing or repairing siding, gutters and downspouts
- Replacing windows or doors with no structural change, no new safety glazing and no change to egress
- Uncovered decks and patios no more than 30 inches above grade, outside critical areas
- A one-story detached shed or playhouse up to 200 square feet and 15 feet tall
- A fence up to 6 feet high
From the City of Edmonds' Work Exempt from a Building Permit handout (updated July 22, 2024). None of these exemptions apply on a lot in a landslide hazard area (ECDC 19.10) or a critical area (ECDC Title 23), and an exemption from the building permit is not an exemption from zoning or other approvals.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.
Timing
How long a permit takes in Edmonds
Edmonds does not publish target review times on its permit pages. The city accepts complete applications only, so the quickest route is a full package the first time: the Critical Areas Determination on file and every item on the submittal handout that applies to the job. Status can be followed on MyBuildingPermit.com.
Where the lot has a critical area, the determination says what extra information the permit needs, which can add steps before the building review starts. A job over 750 square feet or $75,000 also needs its salvage assessment at application.
Cost
What a remodel costs in Edmonds
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
No public cost survey breaks out Edmonds on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Sales tax in Edmonds
Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Edmonds is 10.7% for October 1 to December 31, 2026. On a $100,000 contract, 10.7% is $10,700 of tax. The state can change local rates each quarter, so check the rate again when you sign.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU rules in Edmonds
Edmonds’ current ADU rules are in ECDC 16.20.050 and took effect on July 3, 2025, according to the city’s ADU handout (updated April 17, 2026). ADUs are allowed on all residential lots, attached to the house or detached, and each needs a residential building permit. Transportation and park impact fees and sewer general facilities charges apply to each unit.
The city has also started a pre-approved plan program for detached ADUs. Designs reviewed once go into a city catalog, and an owner who picks one mainly needs review of the site plans. When we read the city’s page, the catalog had no plans in it yet.
For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.
| Rule | In Edmonds |
|---|---|
| How many | Two per house: one attached and one detached, two attached, or two detached |
| Size | 1,000 square feet of gross floor area in LDR-S; 1,200 square feet in LDR-M and LDR-L. Garages and other unconditioned space do not count |
| Height | 25 feet for an attached ADU, 24 feet for a detached one |
| Parking | None for the first ADU. One off-street space for the second, or none within half a mile of a major transit stop |
| EV circuit | A 40-amp, 208/240-volt circuit for the second ADU's parking space |
| Water and sewer | On city water and sewer, one meter and one sewer line serve every unit on the lot. Olympic View Water and Sewer District requires a separate meter |
| Lot coverage | No more than 35% for all structures |
State and regional rules
Rules that apply in Edmonds and across the region
These three come from the state or the regional air agency, not from the city. They apply to every remodel in Snohomish County.
Check for asbestos before demolition
The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.
Sales tax covers labor too
For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.7% in Edmonds this quarter. Ask every bidder whether the price they quote includes it.
Hire a registered contractor
Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.
Giant Builders in Edmonds
Remodeling services in Edmonds
Giant Builders Seattle is a licensed general contractor based in Seattle, and Edmonds is part of the area we work in. One company handles the design, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See the rooms themselves on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Edmonds remodeling questions, answered
01Do I need a permit to remodel my kitchen in Edmonds?
For a remodel, yes. Edmonds requires a permit to remodel or alter a dwelling, and the fee for an interior remodel is based on the licensed contractor's bid. New wiring needs an electrical permit from L&I. Painting, tiling, cabinets, countertops and similar finish work are exempt, unless the lot is in a landslide hazard or critical area.
02Who issues electrical permits in Edmonds?
The Washington State Department of Labor & Industries (L&I). Edmonds is not one of the cities that run their own electrical permits. The city issues the building permit through MyBuildingPermit.com.
03What is a Critical Areas Determination in Edmonds?
A decision by the city's Planning Division on whether wetlands, streams, steep slopes or other critical areas on or near your lot affect the project. Edmonds lists it first among the submittal requirements for a residential addition, remodel or alteration: it must be completed and on file, and the application then includes whatever the decision calls for.
04How long does a remodel permit take in Edmonds?
Edmonds does not publish target review times on its permit pages. It accepts complete applications only, so having the Critical Areas Determination on file and every item from the submittal handout ready is the fastest route. Status can be followed on MyBuildingPermit.com.
05Do I need a permit to cut down a tree in Edmonds?
Not on a developed house lot that has no critical areas and cannot be subdivided, according to the city's tree handout. In a critical area or its buffer, a permit is needed, and a hazard tree needs an arborist's documentation reviewed by the city first. For an addition or new development, tree removal is reviewed with the application, and a new house must keep 30% of the significant trees on the developable site.
06What is the sales tax on a remodel in Edmonds?
10.7% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,700. The state can change local rates each quarter.
07How much does a kitchen remodel cost in Edmonds?
No published survey covers Edmonds on its own. Remodeling magazine's 2025 Cost vs. Value report for Seattle, the nearest market it covers, lists $32,271 for a midrange minor kitchen remodel and $95,542 for a midrange major one. Seattle-area contractors published $75,000 to $130,000 for a full kitchen remodel in 2026. In Edmonds, sales tax of 10.7% is added to the whole contract.
08Can I build an ADU in Edmonds?
Yes. Since July 3, 2025, Edmonds allows two ADUs per house, attached or detached in any mix. The size limit is 1,000 square feet in the LDR-S sub-district and 1,200 square feet in LDR-M and LDR-L. The first ADU needs no added parking; the second needs one off-street space unless the lot is within half a mile of a major transit stop.
Free estimate
Planning a remodel in Edmonds?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Guides for nearby cities
Sources
- 01City of Edmonds: permit assistance (applying online, Permit Center hours) (read Nov 26, 2026)
- 02City of Edmonds: informational handouts (read Nov 26, 2026)
- 03City of Edmonds: Work Exempt from a Building Permit (updated July 22, 2024) (read Nov 26, 2026)
- 04City of Edmonds: handout B61, residential addition, remodel and alteration (updated March 6, 2026) (read Nov 26, 2026)
- 05City of Edmonds: handout B2, accessory dwelling units (updated April 17, 2026) (read Nov 26, 2026)
- 06City of Edmonds: handout P46, tree and vegetation protection and removal (revised July 24, 2024) (read Nov 26, 2026)
- 07City of Edmonds: pre-approved DADU plan program (read Nov 26, 2026)
- 08MyBuildingPermit: construction tip sheet 00, permits required and not required (June 11, 2026) (read Nov 26, 2026)
- 09Washington L&I: cities that issue their own electrical permits (Edmonds is not one) (read Nov 26, 2026)
- 10Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 11Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 12Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 13Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 14Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 15Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 16Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)