Skip to the content

Local remodel guide · King County

Home remodeling in Redmond, WA

What a Redmond homeowner needs to know before a kitchen, bathroom or basement remodel: what the city requires a permit for, how to apply, what a remodel costs here and what the ADU rules allow.

By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

A kitchen with flat white upper cabinets, a gray backsplash and a marble island with a gas cooktop
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short version

Remodeling in Redmond at a glance

The facts a homeowner in Redmond asks for first. Each one is explained further down, and the sources are at the end of the page.

Redmond in brief
QuestionAnswer
Who issues permitsThe City of Redmond's Development Services Center, on the second floor of City Hall.
Where to applyThrough Redmond's own portals: REPS for over-the-counter permits and PRO for permits that need plan review.
Electrical and plumbing permitsIssued by the city as well, over the counter for a house.
The basic ruleAlterations and remodels of an existing home need a building permit. Finish work such as painting, tile, cabinets and countertops is exempt.
Review timeRedmond's permit pages give no target for a house remodel. After a request for plan review, the city emails a permit number and instructions within 48 hours.
Sales tax10.4% on the whole contract, labor included, for October 1 to December 31, 2026.
ADUsTwo ADUs or tiny homes per residential lot. An ADU may be up to 1,000 square feet.

Permits

Who issues remodel permits in Redmond

Redmond’s Development Services Center issues the building, electrical, mechanical and plumbing permits for houses in the city. Each one is a separate application.

Two portals

  • REPS, the Redmond ePermitting Service, is for over-the-counter permits, the ones that need no plan review. Residential electrical, mechanical and plumbing permits are issued this way.
  • PRO, Plan Review Online, is for permits that need plan review, which includes a remodel with drawings. You send a request, and within 48 hours the city emails a permit number and instructions for uploading the documents.

Redmond does not accept paper plans, and documents cannot be sent by courier, fax or mail. At the counter, files are handed over as PDFs on a USB drive. The city recommends an appointment for any permit that needs plan review.

Two more things to know

A contractor needs a City of Redmond business license before working in the city. A Redmond permit is valid for 365 days without an inspection, and each passed inspection extends it by another 365 days.

Permit office

Redmond Development Services Center

Redmond City Hall, second floor15670 NE 85th StreetRedmond, WA 98052

Monday, Tuesday, Thursday and Friday, 8 am to 5 pm. Wednesday, 10:30 am to 5 pm.

What needs a permit

Which projects need a permit in Redmond

By kind of project
ProjectWhat Redmond requires
Kitchen remodelPainting, tiling, cabinets, countertops and similar finish work are exempt. Alterations and remodels of an existing home need a building permit, and a new or altered electrical circuit needs an electrical permit.
Bathroom remodelRedmond lists a new or replacement toilet, sink or shower fixture as work that needs a plumbing permit. A new or altered circuit needs an electrical permit. Tile and paint on their own are exempt.
Basement finishingFinishing a basement alters the home, so it needs a building permit, with separate electrical, plumbing and mechanical permits for those trades.
WallsBuilding or removing a wall needs a permit. The city treats even a small remodel like this as an alteration.
Water heater, furnace, heat pumpA new or replacement water heater, heat pump or furnace needs a permit.
Garage conversion or ADUConverting a garage to living space and adding an accessory dwelling unit both need a building permit.
DecksA deck needs a permit when it is attached to the house, larger than 200 square feet or more than 30 inches above grade.

Work that usually needs no building permit in Redmond

  • Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
  • Replacing interior doors in their existing frames
  • Replacing exterior windows in their existing openings, when the size of the opening does not change
  • A detached deck of 200 square feet or less, no more than 30 inches above grade, that does not serve the required exit door
  • A one-story detached accessory structure of 200 square feet or less
  • A fence 7 feet tall or less
  • A retaining wall 4 feet tall or less that supports no extra load

From the City of Redmond's Work Exempt from Permit handout (2021 building codes, published March 2024). An exemption from the permit is not an exemption from the code or from zoning.

Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.

Timing

How long a permit takes in Redmond

Redmond’s permit pages do not publish a target review time for a house remodel, so this guide does not quote one. The table shows what the city does state.

For a current estimate, ask the permit technicians at the Development Services Center when you apply. When we file a permit, we put the city’s answer into the project schedule.

What the city publishes
Step or routePublished figure
Over-the-counter permitsNo plan review
Request through PROPermit number and instructions by email within 48 hours
Plan review of a house remodelNo target published
How long a permit stays valid365 days, extended by 365 days with each passed inspection
City of Redmond: How to Apply, and Residential Permits.

Cost

What a remodel costs in Redmond

Published job costs, Seattle market, 2025
ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$32,271118.1%
Major kitchen remodel, midrange$95,54253.1%
Major kitchen remodel, upscale$188,40138.7%
Bathroom remodel, midrange$36,14646.8%
Bathroom remodel, upscale$107,45135.3%
Basement remodel$68,35868%
Remodeling magazine, 2025 Cost vs. Value report. The report has no separate table for Redmond: Seattle is the nearest market it covers. These are survey averages for a standard project, not a quote for your house.

No public cost survey breaks out Redmond on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.

Sales tax in Redmond

Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Redmond is 10.4% for October 1 to December 31, 2026. Addresses outside the Regional Transit Authority district pay 9.0%. On a $100,000 contract, 10.4% is $10,400 of tax. The state can change local rates each quarter, so check the rate again when you sign.

Getting closer to your number

The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.

ADUs and backyard cottages

ADU rules in Redmond

Redmond’s zoning code (section 21.04.1110) allows two accessory dwelling units or tiny homes on each residential lot. An ADU may be up to 1,000 square feet, and a tiny home up to 400.

Adding an ADU needs a building permit. Redmond changed its rules to match state law, and older documents on the city’s site still describe one unit per lot with owner-occupancy and parking conditions. Check the current code, or ask the city’s planners, before you design.

The full rules, with the code sections, are in our Redmond ADU rules guide. For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.

Accessory dwelling units in Redmond
RuleIn Redmond
How manyTwo ADUs or tiny homes per residential lot
WhereInside the house, added to it, or in a detached building on the same lot
Size of an ADUUp to 1,000 square feet. The city may allow more when the unit fills one whole floor of the house.
Size of a tiny homeUp to 400 square feet
PermitA building permit is required to add an ADU
Owner occupancy and parkingState law bars an owner-occupancy rule, and bars a parking requirement within half a mile of a major transit stop. Confirm the rest with the city.
Redmond Zoning Code 21.04.1110 and state law RCW 36.70A.681.

State and regional rules

Rules that apply in Redmond and across the region

These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.

Check for asbestos before demolition

The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.

Sales tax covers labor too

For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.4% in Redmond this quarter. Ask every bidder whether the price they quote includes it.

Hire a registered contractor

Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.

Giant Builders in Redmond

Remodeling services in Redmond

Giant Builders Seattle is a licensed general contractor based in Seattle, and Redmond is part of the area we work in. One company handles the design, the permits and the construction.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Redmond remodeling questions, answered

01

Do I need a permit to remodel my kitchen in Redmond?

For most remodels, yes. Redmond exempts painting, tiling, cabinets, countertops and similar finish work. Alterations and remodels of an existing home need a building permit, building or removing a wall needs one, and a new or altered electrical circuit needs an electrical permit.

02

Do I need a permit to remodel a bathroom in Redmond?

Usually. Redmond lists a new or replacement toilet, sink or shower fixture among the work that needs a plumbing permit, and a new or altered circuit needs an electrical permit. Residential plumbing and electrical permits are over-the-counter permits. New tile and paint on their own are exempt.

03

Do I need a permit to finish my basement in Redmond?

Yes. Finishing a basement alters the home, so it needs a building permit, with separate electrical, plumbing and mechanical permits for those trades.

04

How do I apply for a remodel permit in Redmond?

Through the city's own portals. Over-the-counter permits go through REPS, the Redmond ePermitting Service. Permits that need plan review start with a request through PRO, Plan Review Online, and the city emails a permit number and instructions within 48 hours. Redmond does not accept paper plans. When you hire us, we prepare and file the application.

05

How long does a remodel permit take in Redmond?

Redmond's permit pages do not publish a target review time for a house remodel. Over-the-counter permits need no plan review. For a remodel with drawings, ask the Development Services Center for its current estimate when you apply.

06

What is the sales tax on a remodel in Redmond?

10.4% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,400. Addresses outside the Regional Transit Authority district pay 9.0%. The state can change local rates each quarter.

07

How much does a basement remodel cost in Redmond?

There is no published survey for Redmond alone. The nearest benchmark is Remodeling magazine's 2025 Cost vs. Value report for Seattle, which puts a basement remodel at $68,358. Sales tax of 10.4% is added in Redmond.

08

How many ADUs can I build in Redmond?

Redmond's zoning code allows two accessory dwelling units or tiny homes on each residential lot. An ADU may be up to 1,000 square feet. Older documents on the city's site describe earlier rules, so check the current code before you design.

Free estimate

Planning a remodel in Redmond?

Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

What are you planning?
When would you like to start?

We use your details to answer you. Nothing else.

Guides for nearby cities