Does Washington charge sales tax on labor for a remodel?

Yes. When a contractor builds, repairs or improves a house for its owner, Washington treats the job as a retail sale. The Department of Revenue's construction guide says a prime contractor, the contractor hired by the owner, must collect retail sales tax from the owner on the gross contract price, without deducting costs. It adds that the taxable amount includes charges for permits and other fees, labor, profit, materials and charges for subcontractors.

The state rule behind this is WAC 458-20-170, which requires prime contractors to collect the tax measured by the full contract price. The same rule says engineering, architectural and supervisory fees are taxable when they are part of the construction contract, even when they are shown as separate lines.

Labor-only work is taxed too. The department's guide says retail sales tax applies to all charges to consumers for altering, repairing or improving property, even where the charges are for labor only. If you buy the tile and a contractor sets it, the setting is taxable.

Washington's state sales tax rate, before local taxes
6.5%
Washington's state sales tax rate, before local taxes
Seattle's combined rate, October 1 to December 31, 2026
10.55%
Seattle's combined rate, October 1 to December 31, 2026
Seattle's combined rate from January 1, 2027
10.66%
Seattle's combined rate from January 1, 2027

What is the sales tax rate on a remodel in Seattle and nearby cities?

The rate is the combined state and local rate at the job site. The state's share is 6.5%; cities, counties and transit districts add the rest, and the Department of Revenue publishes the combined rates each quarter. The table gives the rates for October 1 to December 31, 2026, and the rates the department has already published for January 1 to March 31, 2027.

Combined sales tax rate on a remodel, by city
CityOct 1 to Dec 31, 2026Jan 1 to Mar 31, 2027Tax on a $100,000 contract, late 2026Where the rate differs
Seattle10.55%10.66%$10,550One rate for the whole city
Bellevue10.3%10.41%$10,300Outside the Regional Transit Authority district: 8.9%, then 9.01%
Kirkland10.4%10.51%$10,400One rate for the whole city
Redmond10.4%10.51%$10,400Outside the Regional Transit Authority district: 9.0%, then 9.11%
Renton10.5%10.61%$10,500Outside the Regional Transit Authority district: 9.1%, then 9.21%
Issaquah10.5%10.61%$10,500Outside the Regional Transit Authority district: 9.1%, then 9.21%
Kent10.4%10.51%$10,400Outside the Regional Transit Authority district: 9.0%, then 9.11%
Auburn10.5%10.61%$10,500The Pierce County part: 10.4%, then 10.41%. Outside the Regional Transit Authority district: 9.1%, then 9.21%
Federal Way10.4%10.51%$10,400One rate for the whole city
Tacoma10.5%10.5%$10,500One rate for the whole city; no change published for January

From the Department of Revenue's quarterly rate tables. The first rate column is the dated table this site's city guides use. Check an exact address with the department's tax rate lookup. Each local remodel guide repeats its city's rate.

Seattle's rate rose 0.2 points on January 1, 2026, when the city and King County each added 0.1% for local law enforcement programs. On January 1, 2027, rates across King County rise by 0.11 points more, mostly from a new 0.1% county transportation benefit district tax, plus 0.01% for children and family services. Tacoma's rate does not change that day.

Which city's rate applies: the job site or the contractor's office?

The job site's. The Department of Revenue says retail construction services are sourced to the location where the construction takes place, so work on a Seattle house is taxed at Seattle's rate even if the contractor's office is in Bellevue. A house in unincorporated King County is taxed at the county's rate for its area.

The city in a mailing address can mislead. Parts of Bellevue, Redmond, Renton, Issaquah, Kent and Auburn lie outside the Regional Transit Authority district and pay a lower rate, and Auburn and Bothell each lie in two counties with different rates. The department's tax rate lookup gives the rate and location code for an exact street address.

The tax is collected once. Materials that become part of your house are bought by the contractor for resale with a reseller permit, so the contractor pays no sales tax on them at the supplier. A subcontractor given your contractor's reseller permit sells at wholesale and charges no retail sales tax either. The tax is charged to you, on the full price, by the contractor you hired. Tools and supplies the contractor uses up are different: the contractor pays tax on those as the consumer.

How should sales tax appear on a remodeling estimate and invoice?

As its own line, with the rate and the amount. Under RCW 82.08.050, a price quoted in a contract is presumed not to include sales tax. The Department of Revenue tells contractors that the words 'tax included' are not enough, and that contracts and progress billings should state the tax separately.

  • The estimate and the contract show the tax as a separate amount, at the rate for the job site's address.
  • Each progress billing, or draw, shows the tax on that draw.
  • Change orders show tax as well, since they become part of the contract price.
  • If the contract holds back retainage, the tax on each billing is figured before the retainage is deducted.
  • Permit, engineering or design charges billed by the contractor sit inside the taxable total.

The buyer owes the tax too. RCW 82.08.050 makes the tax a debt from the buyer to the seller until it is paid. If a contractor neither collects nor pays it, the Department of Revenue may collect it from the buyer directly and add a 10 percent penalty. A cash price 'without tax' does not make the tax go away. The estimate article covers the other lines to check.

What happens if the tax rate changes in the middle of a remodel?

The new rate applies to billings after the change. Under the Department of Revenue's rule on rate changes, WAC 458-20-235, an increase applies from the first billing period that starts on or after its effective date. When a contract pays the contractor in installments for work completed to date, each payment carries the rate in effect when the contractor becomes entitled to it. A contract signed before the change is not locked at the old rate unless the work is completed and accepted before the change.

That matters this winter. A Seattle kitchen signed in November 2026, with draws due in January and February 2027, is taxed at 10.66% on those draws, not 10.55%. On $60,000 of draws the difference is $66. The payment schedule article explains how draws work.

Which charges on a remodeling bill are taxed?

Almost all of them, when they are part of the construction contract. The table sums up what the Department of Revenue's guide and rules say about the charges a homeowner sees most.

What Washington taxes on a home construction job
ChargeRetail sales tax?What the source says
Labor of the contractor and its subcontractorsYesPart of the gross contract price
Materials built into the houseYes, as part of the contract priceThe contractor buys them for resale, then taxes the full price to you
Contractor's overhead and profitYesPart of the gross contract price, which allows no deduction for costs
Permit fees the contractor pays and bills to youYesListed in the taxable amount
Engineering, architectural or supervisory fees in the construction contractYesTaxable even if shown as separate lines (WAC 458-20-170)
Labor to install fixtures you bought yourselfYesLabor-only charges to consumers are retail sales
A wood-burning stove or fireplace installed in the jobYes, plus a $30 fee per deviceContractors collect the solid fuel burning device fee
A new house bought from a builder who built it on the builder's own landNo retail sales tax to the buyerSubject to real estate excise tax instead; the builder pays sales tax on its materials and subcontractors

If you buy materials yourself at a store, you pay the store's sales tax when you buy them, and the contractor's labor to install them is taxed on the contract. Giant Builders gives every client a free, written and itemized estimate, so each of these lines can be read before anything is signed.