What goes into a remodel budget besides the contractor's price?

A realistic budget has five parts: the construction contract, the sales tax on it, the permit fees, the design and engineering the project needs, and a contingency, money held back for conditions nobody can see until the walls are open. A sixth part sits outside the contract: what you spend to live around the work and anything you buy yourself.

The parts of a Seattle remodel budget
PartWhat it coversHow to size it
Construction contractLabor, materials, subcontractors, demolition, disposal and cleanupA written, itemized estimate for your house
Sales taxThe whole contract, labor included10.55% in Seattle for October 1 to December 31, 2026; 10.66% from January 1, 2027
Permit feesThe building permit, plus electrical and plumbing permits where the work needs themSet by the city from the value of the work (table below)
Design and engineeringDrawings, and a structural engineer when a new beam is longer than Seattle allows without oneQuoted on its own, or inside a design-build contract
ContingencyRot, old wiring, asbestos, and changes you choose partway through10 to 20 percent of the construction price
Costs outside the contractAppliances or fixtures you buy, storage, meals out during a kitchen remodel, a rental if you move outYour own list

The remodel cost calculator returns a range for your room, scope and finish level with the sales tax for your city.

What do remodels cost in Seattle compared with the national average?

More than national price guides suggest. Remodeling magazine's Cost vs. Value report prices the same precisely defined projects in 119 U.S. markets. Its 2025 edition, published in September 2025, is the latest: no 2026 edition had been published as of November 26, 2026. In Seattle, every project in the 2025 report costs more than the national average.

Seattle against the national average, 2025 Cost vs. Value report
Project in the reportSeattle job costNational averageSeattle above national
Minor kitchen remodel, midrange$32,271$28,45813%
Major kitchen remodel, midrange$95,542$82,79315%
Major kitchen remodel, upscale$188,401$164,10415%
Bath remodel, midrange$36,146$26,13838%
Bath remodel, upscale$107,451$81,61232%
Basement remodel$68,358$52,01231%
Accessory dwelling unit$210,944$166,40627%

Each figure is for one project the report defines in detail. The kitchen cost guide describes what the kitchen projects include.

Use these as a reality check, not a quote. The report's editors say small differences in size, scope or finishes can change a price a lot, and that the report is less reliable for one address than for a market. A kitchen where walls move, or an older house with surprises, sits above these figures. A smaller refresh sits nearer the minor remodel.

The site's cost guides for kitchens, bathrooms, basements and ADUs break these figures down by scope.

How much do sales tax and permit fees add in Seattle?

In Washington a remodel for a homeowner is a retail sale. The Department of Revenue says the taxable amount includes labor, profit, materials, subcontractors and charges for permits and other fees. Seattle's combined rate is 10.55% for October 1 to December 31, 2026, and the department has published 10.66% from January 1, 2027. On a $100,000 contract that is $10,550 at the current rate. The sales tax article explains the rule and lists the rates for nearby cities.

Seattle sets its building permit fee from the value of the work, using a fee index in its 2026 Fee Subtitle. A small project may qualify for an STFI permit, short for subject to field inspection, Seattle's quicker route for simple work. It pays the permit fee plus a plan review fee of 40% of the index. A project with full plan review pays 100% for each. A 5% technology fee is added to both.

Seattle building permit fees by value of work, 2026
Value of the workSTFI permit routeFull plan review
$50,000$1,611.86$2,302.65
$100,000$2,677.61$3,825.15
$150,000$3,247.23$4,638.90

Building permit, plan review and technology fee, computed from the SDCI 2026 Fee Subtitle (Tables D-1 and D-2). The city decides the value it uses. Electrical permits from SDCI and plumbing permits from Public Health Seattle and King County are separate fees.

Outside Seattle, each city sets its own fees and review routes. The local remodel guides link to each city's permit office.

How big should a remodel contingency be?

Plan on 10 to 20 percent of the construction price, toward the top of that range in an older house. The figure has an official anchor. For FHA's Standard 203(k) renovation loan, HUD requires the lender to set a contingency reserve of at least 10 percent and up to 20 percent of the repair costs on any house 30 years or older, and at least 15 percent when the utilities are not working. Fannie Mae requires a 10 percent reserve on its HomeStyle Renovation loans for two- to four-unit homes.

A contingency pays for what an estimate cannot price until the work begins. In an older Seattle house that can include:

  • Wiring: knob-and-tube or ungrounded circuits found when a wall opens. See knob-and-tube wiring.
  • Pipes: galvanized steel supply lines that need replacing once they are exposed. See galvanized pipes.
  • Asbestos: the Puget Sound Clean Air Agency requires a check for asbestos before any renovation project, and material that contains it is handled under the agency's rules before the work disturbs it.
  • Lead paint: in a home built before 1978, work that disturbs paint must be done by a firm certified in lead-safe work practices. In Washington the Department of Commerce runs that certification.
  • Your own changes: a different tile, another outlet, a moved window. A change order becomes part of the contract price, so it carries sales tax too.

How do you work backward from what you can spend?

Start with the total you are willing to spend, from savings, a loan or both, and work back to the construction price. In this order, the tax and the contingency are set aside first instead of coming out of the finishes later.

  1. 01

    Set the ceiling

    Decide the most you will spend in all, including tax, fees and a cushion. If you are borrowing, the lender's approval sets an outer limit. The financing article explains how each option works.

  2. 02

    Take out what sits outside the contract

    Subtract what you will buy yourself, the cost of living around the work, the permit fees and any design or engineering billed separately.

  3. 03

    Take out the tax and the contingency

    Divide what is left by 1.1055 for Seattle's current sales tax (1.1066 from January 1, 2027), then by 1.10 to 1.20 for a 10 to 20 percent contingency.

  4. 04

    Compare with the benchmarks

    Set the result beside the Cost vs. Value figures and the cost guides. If it is far below them, change the scope now, not halfway through the job.

  5. 05

    Get a written, itemized estimate

    Ask for a price for your scope, line by line, with the sales tax shown and the exclusions listed. The estimate article shows what to look for.

Worked arithmetic: $125,000 to spend on a Seattle kitchen
StepAmount
Total you will spend$125,000
Less costs outside the contract (your own figure; this example assumes $5,000)$5,000
Less permit fees: building, electrical and plumbing, about$3,000
Left for the contract, its sales tax and the contingency$117,000
Divided by 1.1055 for sales tax, then by 1.15 for a 15 percent contingencyabout $92,000
Construction price to aim forabout $92,000

Arithmetic, not a price. At the 10.66% rate that applies from January 1, 2027, the target is about $91,900.

A target of about $92,000 fits the full-remodel range in the kitchen cost guide, $75,000 to $130,000 before tax, and not a kitchen where walls move, which that guide puts at $150,000 and up.

Which costs do people leave out of a remodel budget?

  • Sales tax on labor. Washington taxes the whole contract, not only the materials.
  • Design, engineering and permit fees billed by the contractor. Washington's Department of Revenue counts them as part of the taxable contract price.
  • A structural engineer in Seattle when a new beam or header spans more than 8 feet under two stories and a roof, or 14 feet under one story and a roof.
  • An asbestos survey before demolition, and removal if the survey finds asbestos.
  • Appliances, light fixtures or tile you buy yourself, and their delivery.
  • Living costs during the work: storage, meals during a kitchen remodel, a rental if you move out.
  • For a new accessory dwelling unit on King County's regional sewer system, the county's capacity charge: $46.01 a month for 15 years at the 2026 rate, about $8,282 in all unless paid off early at a discount.
  • A higher property tax bill once the work is assessed. The state's three-year exemption must be claimed before the work is finished; see the return on investment article.

Giant Builders starts every project with a free in-home estimate that is written and itemized, so each of these lines can be checked before you sign.