Skip to the content

Local remodel guide · King County

Home remodeling in Kent, WA

Where a permit is filed in Kent, which projects need one, what sales tax adds, what the work costs and what the city allows for backyard cottages. Each fact is tied to the city or state page it comes from.

By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

A kitchen with white cabinets, an island with a wood top and four white stools, and three glass pendant lights
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short answer

Remodeling in Kent, in short

Most remodels in Kent need a permit from the city, filed through its online permit portal, and new wiring needs a separate electrical permit from the state. Sales tax adds 10.4% to the contract. The nearest published costs are for the Seattle market: about $75,000 to $130,000 for a typical full kitchen remodel, with survey figures of $36,146 for a midrange bathroom and $68,358 for a basement.

Kent’s code allows two accessory dwelling units on a lot, of up to 1,000 square feet each, and the owner no longer has to live on the property.

Kent in brief
QuestionAnswer
Who issues building permits?The City of Kent Permit Center, 400 West Gowe Street. Phone 253-856-5300.
How do I apply?Through the city's online permit portal. Permitting is paperless, and most new applications start with an intake appointment.
Who issues electrical permits?The Washington State Department of Labor & Industries (L&I), not the city.
What is the sales tax?10.4% on the full contract price, for October 1 to December 31, 2026.
How many ADUs can a lot have?Two, attached or detached, up to 1,000 square feet each. A detached one can be up to 24 feet tall.
Which county?King County.
Each answer is explained further down. The sources are at the end of the page.

Permits

Permits for a remodel in Kent

Permits in Kent come from the city’s Permit Center, on the first floor of the Centennial building at 400 West Gowe Street in downtown Kent. The phone number is 253-856-5300 and the email address is PermitCenter@KentWA.gov.

Permitting is paperless. Every application goes through the city’s online permit portal, and the finished permit and the approved drawings are issued there too. A new application normally starts with the city’s Permit Center Application Form, which sets up an intake appointment.

What needs a permit

Kent’s rule is broad. Most construction, alteration or repair work needs a permit, and the city names work that changes a building’s living space or alters its electrical, gas, mechanical or plumbing systems.

Small jobs have a shorter route. Plumbing, mechanical, re-roofing and window or siding work on a house is filed in the portal as a Minor Work Permit, with no intake appointment and no formal plan review. Replacing a fixture in the same place, without opening drywall or framing, is minor work.

Electrical permits come from the state

The Washington State Department of Labor & Industries (L&I) handles all electrical permits and inspections in Kent. The permit has to be bought by whoever does the wiring, so on a remodel it is the electrical contractor’s and not the homeowner’s.

How long review takes

We did not find a published review time for a house remodel on the city’s pages. The Permit Center can give a current estimate at the intake appointment.

Permit office

City of Kent Permit Center

Centennial building, first floor400 West Gowe StreetKent, WA 98032Phone 253-856-5300
Kitchen, bathroom and basement permits in Kent
ProjectWhat it takes in Kent
Kitchen remodelA residential building permit when the work alters plumbing, gas, mechanical systems or walls. A fixture replaced in the same place with no walls opened is a minor work plumbing permit. An L&I electrical permit for new wiring.
Bathroom remodelA minor work plumbing permit covers a toilet, tub or sink replaced in the same place without opening walls. Moving fixtures or walls takes a residential building permit. An L&I electrical permit for new wiring.
Basement finishingA residential building permit, because finishing a basement changes the home's living space. An L&I electrical permit for the wiring.
Drawn from the city's published permit rules. The permit office has the final word on any one project.

Work the city lists as needing no building permit

  • Decks of 200 square feet or less that are no more than 30 inches above the ground, not attached to the house and not at a required exit door
  • Sheds under 200 square feet
  • Fences 7 feet high or less
  • Most retaining walls up to 4 feet high

Kent adds that work with no permit must still follow the codes that apply. A shed, for one, still has to meet the setback and height limits.

Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs. Our Seattle permit guides explain what turns a simple update into permitted work, room by room: kitchen, bathroom and basement. The office, the forms and the fees are what change in Kent.

Sales tax

Sales tax on a remodel in Kent

The Washington Department of Revenue lists a combined state and local sales tax rate of 10.4% for Kent for October 1 to December 31, 2026. Seattle’s rate is 10.55%.

On a remodel, the tax is collected on the total contract price. That means labor and the contractor’s markup as well as materials, so it is one of the larger lines in a budget. When you compare bids, ask each bidder whether the number includes it.

The state’s table lists a second rate of 9.0% for the part of Kent that lies outside the regional transit district.

The state can change local rates at the start of each quarter, so check the rate again when you sign.

Sales tax at 10.4% in Kent
Contract priceSales taxTotal
$50,000$5,200$55,200
$100,000$10,400$110,400
$150,000$15,600$165,600
Worked examples at the rate for October 1 to December 31, 2026. The contract prices are round numbers, not quotes.

Costs

What a remodel costs in Kent

Published job costs, Seattle market, 2025
ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$32,271118.1%
Major kitchen remodel, midrange$95,54253.1%
Major kitchen remodel, upscale$188,40138.7%
Bathroom remodel, midrange$36,14646.8%
Bathroom remodel, upscale$107,45135.3%
Basement remodel$68,35868%
Accessory dwelling unit$210,94432.3%
Remodeling magazine, 2025 Cost vs. Value report. The report has no separate table for Kent: Seattle is the nearest market it covers. These are survey averages for a standard project, not a quote for your house.

The Cost vs. Value report covers three Washington markets, Seattle, Spokane and Kennewick, so the Seattle table is the nearest published benchmark for Kent. Typical kitchen projects in the Seattle area run $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.

Add 10.4% sales tax to any of these. What an older house needs behind the walls, such as new wiring, new supply pipes or a floor brought back to level, is priced after a visit and not from a table.

Getting closer to your number

The remodel cost calculator gives a range for your room in a couple of minutes. Our Seattle cost guides go line by line: kitchen, bathroom, basement and ADU and DADU. A written, itemized estimate after a visit is the only price that fits your house.

ADUs and backyard cottages

ADU and DADU rules in Kent

Kent began rewriting its ADU rules before the state required it: Ordinance 4464 passed on May 16, 2023 and took effect on June 15, 2023. The rules in force today are in section 15.08.350 of the Kent City Code, and the table shows what that section says now.

When the city began the rewrite, it reported that fewer than 30 ADUs had been built in Kent since they were first allowed in 1995. The barriers it named were design rules, permitting and impact fees, ownership requirements, parking requirements and the number of units allowed.

For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction and garage conversions. A home outside the city limits follows its county’s rules instead. For King County, see ADU rules in unincorporated King County.

Accessory dwelling units in Kent
RuleIn Kent
How manyTwo per lot: one attached and one detached, two attached, or two detached.
SizeUp to 1,000 square feet each. The allowance belongs to each unit and cannot be moved from one to the other.
HeightA detached ADU can be up to 24 feet tall.
Owner living on siteNot required. A covenant recorded under the old rule can be released by the planning director.
OwnershipThe ADU and the main house may be designated for separate ownership.
ParkingSet in the city's parking section, KCC 15.05.040, within the limits of state law.
Everything elseThe zone's own standards for building coverage, impervious surface and setbacks still apply, and every ADU needs an approved permit application.
Kent City Code 15.08.350, as published on Nov 18, 2026.

The sewer capacity charge

King County bills a capacity charge to homes newly connected to a sewer system whose sewage is treated at a King County plant. For an ADU connected in 2026 it is $46.01 a month for 15 years, which is 0.59 of the $77.99 residential rate, or one discounted payment. Your sewer provider can tell you whether your address is in that service area.

What Washington law sets for every city

The state’s ADU law (RCW 36.70A.681) is a floor that a city’s rules cannot go below. Cities in King and Pierce counties had to write it into their codes with the comprehensive plan update that was due by December 31, 2024, and where a local rule still conflicts, the state law overrides it. In Kent that means:

  • At least two ADUs on a lot where a single-family house is allowed: attached, detached or one of each
  • No rule that the owner must live on the property
  • A size limit of no less than 1,000 square feet for each unit
  • A height limit of no less than 24 feet, unless the main house is held lower
  • No off-street parking requirement within half a mile's walk of a major transit stop
  • An existing building such as a detached garage may be converted, even where it sits inside today's setbacks
  • No ban on selling an ADU as a condominium unit
  • Impact fees of no more than half of what the main house would pay

The limits of the law: it does not apply to a lot with critical areas such as wetlands or steep slopes, a city may refuse an ADU on a lot that is not on public sewer, and a city may restrict short-term rentals.

Your house

What to check before work starts on a house in Kent

Lead paint in houses built before 1978

Under the federal Renovation, Repair and Painting rule, a firm that is paid to disturb painted surfaces in a home built before 1978 must be certified by the EPA as lead-safe and must use lead-safe work practices. Ask any contractor you interview for that certificate.

An asbestos check before any renovation

The Puget Sound Clean Air Agency, whose territory includes King and Pierce counties, requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, unless an owner is surveying the single-family house they live in. The results are shared with everyone who works on the job. Removing friable asbestos takes a notice to the agency first.

Old flooring and wall texture are the usual suspect materials in a kitchen or a bathroom. We look for them at the first visit, so the testing is part of the plan and not a surprise on demolition day. For what else older houses hide, see whole-home remodeling.

Questions

Kent remodeling questions, answered

01

Do I need a permit to remodel a kitchen or bathroom in Kent?

For most remodels, yes. Kent requires a permit for most construction, alteration or repair work, including changes to plumbing, gas, mechanical or electrical systems. Replacing a fixture in the same place, without opening drywall or framing, goes under a simpler minor work plumbing permit. New wiring needs an electrical permit from the Washington State Department of Labor & Industries.

02

Where is the Kent Permit Center, and how do I apply?

The Permit Center is on the first floor of the Centennial building at 400 West Gowe Street in downtown Kent, phone 253-856-5300. Permitting is paperless: applications go through the city's online permit portal, most new applications start with an intake appointment, and the permit is issued electronically. When we build your project, we prepare and file the application.

03

Who issues electrical permits in Kent?

The Washington State Department of Labor & Industries, not the city. L&I handles all electrical permits and inspections in Kent. The permit is bought by whoever does the wiring, which on a remodel is the electrical contractor.

04

What is the sales tax on a remodel in Kent?

10.4% for October 1 to December 31, 2026, collected on the total contract price, labor included. On a $100,000 remodel that is $10,400. The state lists 9.0% for the part of Kent outside the regional transit district. The state can change local rates each quarter.

05

How much does a kitchen remodel cost in Kent?

Remodeling magazine's Cost vs. Value report has no separate table for Kent, so its Seattle figures are the nearest published benchmark: in the 2025 edition, $95,542 for a midrange major kitchen remodel and $32,271 for a minor one. Typical full kitchen remodels in the Seattle area land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls starts around $150,000. Sales tax of 10.4% is added to the contract price.

06

Can I build an ADU or a backyard cottage in Kent?

Yes. Kent's code allows two accessory dwelling units per lot: attached, detached or one of each. Each can be up to 1,000 square feet, a detached unit can be up to 24 feet tall, and the city no longer requires the owner to live on the property. Every ADU needs an approved permit application.

07

Does a deck, a shed or a fence need a permit in Kent?

Not always. Kent lists a deck on a house as exempt when it is no more than 200 square feet, no more than 30 inches above the ground, not attached to the house and not at a required exit door. Sheds under 200 square feet and fences 7 feet high or less are also exempt. Exempt work still has to follow the codes that apply, including setbacks.

08

How do I check that a remodeling contractor is registered in Washington?

Look the business up on the Department of Labor & Industries contractor search before you sign anything. A general contractor in Washington must be registered with the state and carry a $30,000 bond and liability insurance. Giant Builders Seattle is registered as GIANTBS782RZ, and anyone can open the record.

Giant Builders in Kent

Remodeling services in Kent

Giant Builders Seattle is a licensed general contractor based in Seattle, and Kent is part of the area we work in. One contract covers the drawings, the permits and the construction.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Free estimate

Planning a remodel in Kent?

Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

What are you planning?
When would you like to start?

We use your details to answer you. Nothing else.

Sources

  1. 01City of Kent: Permit Center (read Nov 18, 2026)
  2. 02City of Kent: Do I need a permit? (read Nov 18, 2026)
  3. 03City of Kent: Residential building permits (read Nov 18, 2026)
  4. 04City of Kent: Electronic permit applications (read Nov 18, 2026)
  5. 05City of Kent: Frequently asked questions (electrical permits, sheds) (read Nov 18, 2026)
  6. 06Kent City Code chapter 15.08, section 15.08.350: accessory dwelling units (read Nov 18, 2026)
  7. 07City of Kent: ADU code update and Ordinance 4464 (read Nov 18, 2026)
  8. 08City of Kent: ADU code update, questions and answers (read Nov 18, 2026)
  9. 09Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
  10. 10Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
  11. 11Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
  12. 12Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
  13. 13Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
  14. 14Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
  15. 15Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)
  16. 16Revised Code of Washington 36.70A.681: accessory dwelling units, limits on local rules (read Nov 18, 2026)
  17. 17Revised Code of Washington 36.70A.680: accessory dwelling units, when cities must comply (read Nov 18, 2026)
  18. 18Revised Code of Washington 36.70A.130: comprehensive plan update deadlines (read Nov 18, 2026)
  19. 19Washington Dept. of Labor & Industries: cities that issue their own electrical permits (read Nov 18, 2026)
  20. 20Washington Dept. of Labor & Industries: electrical permit basics (read Nov 18, 2026)
  21. 21U.S. Environmental Protection Agency: Lead Renovation, Repair and Painting program (read Nov 18, 2026)
  22. 22King County: sewer capacity charge, 2026 rates (read Nov 18, 2026)