What is the difference between a DADU, an AADU and an addition?

Who lives there, and how the city counts it. SDCI defines an accessory dwelling unit (ADU) as a separate living space within a house or on the same property as a house. A legally permitted unit in the home is an attached accessory dwelling unit (AADU), and one on the property but not in the home is a detached accessory dwelling unit (DADU), often called a backyard cottage. An addition is more room for the house you live in: a family room, a primary suite, a dormer or a second story.

Three ways to add space on a Seattle lot
QuestionBackyard cottage (DADU)Basement or attached unit (AADU)Addition
Is it a separate home?YesYesNo, it is part of the house
Size limit1,000 sq ft, or 1,200 with three or more bedroomsThe same, but underground floor area is not counted, and a unit in a part of the house that existed on July 23, 2023 may be largerSet by the zone's coverage, floor area and height limits
Uses lot coverageYesOnly if it adds a footprintYes, if it adds a footprint
Seattle permit routeFull plan review; with a pre-approved plan, 2 to 6 weeks in most casesFull plan reviewSTFI for one story at ground level up to 750 sq ft or a small dormer; full review for a second story
ParkingNone requiredNone requiredNo change, since no home is added
Rent it as a separate homeYesYesNo
Sell it separatelyAs a condominium only; no subdivisionAs a condominium only; no subdivisionNo
King County capacity charge$46.01 a month for 15 years$46.01 a month for 15 yearsNone

From SMC 23.42.022 as amended by Ordinance 127376, the city's January 2026 summary of the Neighborhood Residential rules, SDCI's ADU page and Tip 316, and King County's 2026 capacity charge rate.

Which option fits the lot you have?

Start with what the lot has left. In Neighborhood Residential zones, the city's January 2026 summary sets these limits, and since January 21, 2026 accessory units count toward density, floor area and lot coverage like any other home.

Neighborhood Residential limits that decide between a cottage, a basement unit and an addition
LimitRuleWhat it means for each option
Lot coverage50 percentA cottage and a ground-level addition both use it; a basement unit does not. SDCI counts all structures, covered areas and decks 36 in or more above the ground.
Floor area ratio0.6 where density is below one home per 4,000 sq ft, then 0.8, 1.0 and 1.6 as density rises; lots under 5,000 sq ft may have 2,500 sq ft whatever the ratioEvery option adds floor area. Adding a home raises the density and can raise the ratio; an addition cannot.
Rear setback15 ft for the house on a lot with one or two homes, 0 at an alley; 5 ft for an ADU, 0 at an alleyA cottage can sit much closer to the back line than an addition can
Side setbacks5 ft on average, 3 ft at the leastLimits how wide a cottage or a bump-out can be
Between buildingsAt least 5 ftA cottage needs room from the house
Height32 ft plus pitched roof allowances; 42 ft in some cases, such as when a Tier 2 tree is keptRoom for a two-story cottage or a second story
DensityThe greater of four homes or one per 1,250 sq ft, or six near major transit or with two affordable homes; no more than two ADUsWith one house, one or two ADUs fit within the count

Lots with steep slopes, creeks, wetlands or shoreline have reduced density and coverage. Other zones and other cities differ.

The Seattle ADU rules page works through a 5,000 square foot lot. Trees often decide where a cottage or an addition can go: projects that harm or remove trees the city protects as Tier 1, 2 or 3 cannot use the STFI permit, and the tree rules guide explains the categories.

How do the costs compare?

Remodeling magazine's 2025 Cost vs. Value report prices a defined version of each project for the Seattle market. The figures are averages for that project, not quotes, and they leave out conditions on your lot such as slope, utility runs and trees.

Seattle job costs in the 2025 Cost vs. Value report
ProjectJob costCost recouped at sale
Accessory dwelling unit$210,94432.3%
Basement remodel (a finished room with a wet bar and a bathroom, not a rental unit)$68,35868%
Bathroom addition, midrange$82,21839.7%
Primary suite addition, midrange$219,37827.1%
Primary suite addition, upscale$450,56115.9%

The report has no figure for a second-story addition or a garage conversion. The recouped share measures resale only; rent from an ADU, or a relative housed for years, is not in it.

Some costs fall only on the ADU routes: King County's sewer capacity charge of $46.01 a month for 15 years ($8,281.80 over the full term), possibly an electrical service change from Seattle City Light, and for a cottage the sewer, water and power lines run across the yard. Sales tax applies to all three, at 10.55% in Seattle for October to December 2026. The ADU cost guide and the ADU cost calculator put numbers on the ADU routes; the remodel cost calculator covers additions.

How do the permits and the energy code differ?

An addition can take the quick route and an ADU cannot. SDCI Tip 316 (updated October 29, 2026) lets ground-level, one-story additions up to 750 square feet use the subject-to-field-inspection (STFI) permit, which the city typically processes within a few working days. It excludes establishing or constructing an ADU or DADU, converting a structure to one, and second-story additions; those go through full plan review.

For a cottage, the pre-approved plan route closes much of the gap. The city's ADUniverse website keeps a gallery of DADU designs approved in advance, and SDCI says that in most cases a permit for one takes 2 to 6 weeks. The plan still has to fit your lot.

Energy and ventilation steps by project, 2021 Seattle Energy Code and Residential Code
ProjectExtra efficiency credits (R406)Blower door testWhole-house ventilation
Addition of 150 sq ft or lessNot requiredNot requiredNot required
Addition over 150 and under 500 sq ft2.0 creditsNot requiredNot required
Addition over 500 and under 1,500 sq ft5.0 creditsRequiredRequired
New detached ADU under 1,500 sq ft with less than 300 sq ft of windows5.0 credits, as a small dwelling unitRequiredRequired

From Seattle Energy Code sections R406.3, R402.4.1.2 and R502.1.1 and Seattle Residential Code section R303.4. The energy code guide explains the credits.

Which option suits the way you will use the space?

  • Rental income. Only an ADU can be rented as a separate home, and Seattle's rental registration applies once a tenant moves in.
  • A relative who wants independence. A cottage gives the most separation; a basement unit gives a separate home under one roof. Either needs its own kitchen and bathroom to be a dwelling unit.
  • More room for your own household. An addition, or a basement finished as part of the house, is simpler: no second kitchen, no capacity charge, and possibly the STFI permit.
  • Flexibility later. SDCI says an ADU is not legal until it has been established through a permit, so a room built as part of the house cannot simply be rented out later. An addition planned with its own entrance, kitchen and bathroom can be permitted as an attached ADU from the start.
  • Keeping the yard. A basement unit or a second story leaves the yard alone; a cottage and a ground-level addition take part of it.

What else can rule an option out?

  • Slopes, creeks and wetlands. Environmentally critical areas reduce the density and coverage a lot may have, and exterior work on such a lot needs SDCI approval to stay on the STFI permit.
  • Protected trees. A Tier 1, 2 or 3 tree where the building would go can move or stop a project.
  • The sewer and the power. You own your side sewer to the public main, and SDCI notes that an ADU may need electrical service changes from Seattle City Light.
  • Buildings close together. The residential code measures fire separation distance to the nearest interior lot line, to the far side of a street or alley, or to an imaginary line between two buildings on the lot. A wall less than 5 feet from that line needs a 1-hour rating, and no openings are allowed within 3 feet, so a cottage close to the house can need rated walls.
  • Highways and rail lines. Since January 21, 2026, SMC 23.42.047 has asked that any dwelling unit within 600 feet of an interstate, a highway, a major truck street or a railroad have sound-insulating windows that keep indoor noise at 45 decibels or less, plus cooling and balanced ventilation with MERV 13 filters. Ask SDCI early whether it applies to your unit.
  • A house that is already a duplex. Under the city's interpretation of section R302.3, an ADU added to a two-family house takes the building out of the residential code.

Outside Seattle, the state sets the floor. RCW 36.70A.681 requires cities to allow at least two ADUs per lot, bars owner-occupancy rules, and forbids size caps under 1,000 square feet or roof height caps under 24 feet. Each city writes its own code above that floor: see the rules for Bellevue, Kirkland, Redmond and unincorporated King County.

Giant Builders visits, measures the house and the yard, and gives a written, itemized estimate for the option that fits. The ADU and DADU builders and home additions pages describe each kind of project.