Local remodel guide · King County
Home remodeling in Bellevue, WA
What a Bellevue homeowner needs to know before a kitchen, bathroom or basement remodel: who issues the permit, what the city reviews, what a remodel costs here and what the ADU rules allow.
By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short version
Remodeling in Bellevue at a glance
The facts a homeowner in Bellevue asks for first. Each one is explained further down, and the sources are at the end of the page.
| Question | Answer |
|---|---|
| Who issues permits | City of Bellevue Development Services, through its Permit Center at City Hall. |
| Where to apply | Online at MyBuildingPermit.com. Bellevue takes applications and plans there. |
| Electrical and plumbing permits | Issued by the city as well, through the same department. |
| Fastest permit | The single-family remodel permit with no plan review. It covers a kitchen or bathroom remodel without structural work and is usually issued the same day. |
| Review target with plans | 14 days for the first review of a single-family remodel and 10 days for each revision. The city says actual times will vary. |
| Sales tax | 10.3% on the whole contract, labor included, for October 1 to December 31, 2026. |
| ADUs | Up to two per lot, each up to 1,200 square feet. |
Permits
Who issues remodel permits in Bellevue
Bellevue’s Development Services department issues the building, electrical, mechanical and plumbing permits for houses in the city. Applications and plans go in online through MyBuildingPermit.com, a portal that several cities in this area share.
Two remodel permits, depending on structure
- Remodel without structural work (no plan review). The city’s examples include remodeling a kitchen or bathroom, turning a finished basement into living or sleeping space, and removing, moving or adding non-bearing walls. It is usually issued the same day.
- Remodel with structural work (plan review). Moving a load-bearing wall, replacing one with a beam, enlarging a window or door opening, or turning a garage or an unfinished basement into living space. This permit also covers the electrical, mechanical and plumbing work in the project.
The same-day permit does not cover bearing walls, added load on walls, beams or footings, turning unheated space into heated space, or creating an accessory dwelling unit. If the inspector finds that a job has gone past what the permit covers, the city asks for plans and reviews them.
Inspections
On a remodel without plan review the city inspects four times: before any work starts (a meeting on site to go over the project and the code), before concrete is poured, before framing or insulation is covered, and when the work is done.
Permit office
Bellevue Development Services Permit Center
Bellevue City Hall450 110th Avenue NEBellevue, WA 98004In person Monday to Thursday, 10 am to 3 pm. Fridays 10 am to 3 pm, by remote service.
What needs a permit
Which projects need a permit in Bellevue
| Project | What Bellevue requires |
|---|---|
| Kitchen remodel | Replacing cabinets and countertops needs no building permit. A permit is required to install a new fixture or move one, to add or move electrical circuits, and to move an appliance when that changes gas, water, drain, vent or wiring. A kitchen remodel without structural work fits the same-day remodel permit. |
| Bathroom remodel | A permit is required to install a new fixture or move an existing one, and showers and bathtubs are on the city's permit-required list. Replacing a fixture with the same kind in the same place generally needs none. A bathroom remodel without structural work fits the same-day remodel permit. |
| Basement finishing | Turning a finished basement into living or sleeping space fits the same-day remodel permit. Turning an unfinished basement into living space needs the remodel permit with plan review. |
| Walls | Non-bearing walls can be removed, moved or added under the same-day remodel permit. Moving a load-bearing wall, or replacing it with a beam, needs plan review. |
| Windows and doors | Installing or moving a window, door or skylight, or widening an opening, needs a permit with plan review. Replacing one with the same size in the same place needs none. |
| Water heater, furnace, heat pump | A permit is required to replace or move a water heater, and to install, move or replace a furnace or heat pump. |
| Garage conversion or ADU | Converting a garage to living space and creating an accessory dwelling unit both need plan review. |
Work that usually needs no building permit in Bellevue
- Replacing kitchen cabinets and countertops
- Replacing an appliance, fixture, window or door with the same kind in the same place
- A deck less than 30 inches above the ground
- A fence 8 feet tall or less
- A detached shed, playhouse or gazebo of 200 square feet or less
- Siding, except stucco and brick or stone veneer more than 4 feet above grade
From the City of Bellevue's list of work requiring permits. A plumbing or electrical permit can still apply to part of the job, and a shed must still meet the Land Use Code.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.
Timing
How long a permit takes in Bellevue
Bellevue publishes review targets. A permit that needs no plan review is an over-the-counter permit, which the city says can typically be turned around within one day. That is the route most kitchen and bathroom remodels without structural work take.
When plans are reviewed, the target is the number of days in which the reviewer should finish the first review. Each round of corrections after that has its own target, and the rounds continue until the plans meet the code. The city states that actual review times will vary.
Complete drawings and prompt answers to the reviewer’s comments are what keep a permit from going extra rounds.
| Step or route | Published figure |
|---|---|
| Remodel without plan review | Typically within one day |
| Single-family remodel with plan review | First review 14 days, each revision 10 days |
| Single-family addition | First review 14 days, each revision 10 days |
| New single-family house | First review 21 days, each revision 14 days |
Cost
What a remodel costs in Bellevue
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
No public cost survey breaks out Bellevue on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Sales tax in Bellevue
Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Bellevue is 10.3% for October 1 to December 31, 2026. Addresses outside the Regional Transit Authority district pay 8.9%. On a $100,000 contract, 10.3% is $10,300 of tax. The state can change local rates each quarter, so check the rate again when you sign.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU rules in Bellevue
Bellevue rewrote its ADU rules to match state law. On June 24, 2025 the city council adopted middle housing code changes that allow detached units, which Bellevue did not allow before. The Land Use Code (section 20.20.120) now allows up to two accessory dwelling units on a lot, attached to the house or detached from it.
One caution: the city’s “ADU reform” web page still describes the 2023 rules and says detached units are not allowed. The code has changed since. Check the code itself, or ask Development Services, before you rely on an older page.
Creating an ADU goes through plan review. It cannot use the same-day remodel permit.
The full rules, with the code sections, are in our Bellevue ADU rules guide. For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.
| Rule | In Bellevue |
|---|---|
| How many | Up to two per lot, attached or detached |
| Size | Up to 1,200 square feet each |
| Height of a detached unit | 24 feet, or 28 feet when built over an existing accessory structure such as a garage |
| Parking | None required for a unit under 1,000 square feet, or within half a mile of a major transit stop |
| Owner occupancy | Not required |
| Sale | A unit may be sold to a separate owner |
State and regional rules
Rules that apply in Bellevue and across the region
These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.
Check for asbestos before demolition
The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.
Sales tax covers labor too
For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.3% in Bellevue this quarter. Ask every bidder whether the price they quote includes it.
Hire a registered contractor
Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.
Giant Builders in Bellevue
Remodeling services in Bellevue
Giant Builders Seattle is a licensed general contractor based in Seattle, and Bellevue is part of the area we work in. One company handles the design, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See the rooms themselves on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Bellevue remodeling questions, answered
01Do I need a permit to remodel my kitchen in Bellevue?
Often, yes. Bellevue does not require a building permit to replace cabinets or countertops. It does require a permit to install or move a plumbing fixture, to add or move electrical circuits, and to move an appliance when that changes gas, water, drain, vent or wiring. A kitchen remodel with no structural work fits the city's remodel permit without plan review, which is usually issued the same day. Moving a load-bearing wall means plan review.
02Do I need a permit to remodel a bathroom in Bellevue?
For most remodels, yes. Installing a new fixture or moving one needs a permit, and showers and bathtubs are on the city's permit-required list. Swapping a fixture for the same kind in the same place generally needs none. Without structural work, a bathroom remodel fits the same-day remodel permit.
03Do I need a permit to finish my basement in Bellevue?
Yes. Bellevue requires a permit for a remodel that changes the interior of the house, even when no structural elements are touched. Turning a finished basement into living or sleeping space fits the remodel permit without plan review. Turning an unfinished basement into living space needs the remodel permit with plan review.
04How long does a remodel permit take in Bellevue?
A remodel that needs no plan review is an over-the-counter permit, which the city says can typically be turned around within one day. For a single-family remodel with plan review, Bellevue's target is 14 days for the first review and 10 days for each revision. The city says actual review times will vary.
05How do I apply for a remodel permit in Bellevue?
Online, at MyBuildingPermit.com. Choose Building, then Single Family Residential, then Remodel. The Permit Center at City Hall, 450 110th Avenue NE, has in-person service Monday to Thursday from 10 am to 3 pm. When you hire us, we prepare and file the application.
06What is the sales tax on a remodel in Bellevue?
10.3% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,300. Addresses outside the Regional Transit Authority district pay 8.9%. The state can change local rates each quarter.
07How much does a kitchen remodel cost in Bellevue?
There is no published survey for Bellevue alone. The nearest benchmark is Remodeling magazine's 2025 Cost vs. Value report for Seattle: $32,271 for a midrange minor kitchen remodel, $95,542 for a midrange major remodel and $188,401 for an upscale one. Typical Seattle-area kitchens run $75,000 to $130,000 for a full remodel. Sales tax of 10.3% is added in Bellevue.
08Can I build an ADU on my lot in Bellevue?
Bellevue's Land Use Code allows up to two accessory dwelling units on a lot where a single-family home or middle housing is allowed. They can be attached or detached, each up to 1,200 square feet, and the owner does not have to live on the lot. The city's older ADU web page still shows the 2023 rules, so check the current code or ask Development Services about your lot.
Free estimate
Planning a remodel in Bellevue?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Guides for nearby cities
Sources
- 01City of Bellevue: work requiring permits (read Nov 18, 2026)
- 02City of Bellevue: single-family remodel permit, no plan review (read Nov 18, 2026)
- 03City of Bellevue: single-family remodel permit (read Nov 18, 2026)
- 04City of Bellevue: permit review timelines (read Nov 18, 2026)
- 05City of Bellevue: permits (Permit Center hours and how to apply) (read Nov 18, 2026)
- 06Bellevue Land Use Code 20.20.120: accessory dwelling units (read Nov 18, 2026)
- 07City of Bellevue: pre-approved plans (the June 24, 2025 code change, detached ADU size and height) (read Nov 18, 2026)
- 08City of Bellevue: ADU reform (the 2023 summary) (read Nov 18, 2026)
- 09Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 10Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 11Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 12Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 13Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 14Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 15Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)