Skip to the content

Local remodel guide · King County

Home remodeling in Bellevue, WA

What a Bellevue homeowner needs to know before a kitchen, bathroom or basement remodel: who issues the permit, what the city reviews, what a remodel costs here and what the ADU rules allow.

By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

A two-story living room with a staircase and white railings, and a white kitchen seen through a wide opening
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short version

Remodeling in Bellevue at a glance

The facts a homeowner in Bellevue asks for first. Each one is explained further down, and the sources are at the end of the page.

Bellevue in brief
QuestionAnswer
Who issues permitsCity of Bellevue Development Services, through its Permit Center at City Hall.
Where to applyOnline at MyBuildingPermit.com. Bellevue takes applications and plans there.
Electrical and plumbing permitsIssued by the city as well, through the same department.
Fastest permitThe single-family remodel permit with no plan review. It covers a kitchen or bathroom remodel without structural work and is usually issued the same day.
Review target with plans14 days for the first review of a single-family remodel and 10 days for each revision. The city says actual times will vary.
Sales tax10.3% on the whole contract, labor included, for October 1 to December 31, 2026.
ADUsUp to two per lot, each up to 1,200 square feet.

Permits

Who issues remodel permits in Bellevue

Bellevue’s Development Services department issues the building, electrical, mechanical and plumbing permits for houses in the city. Applications and plans go in online through MyBuildingPermit.com, a portal that several cities in this area share.

Two remodel permits, depending on structure

  • Remodel without structural work (no plan review). The city’s examples include remodeling a kitchen or bathroom, turning a finished basement into living or sleeping space, and removing, moving or adding non-bearing walls. It is usually issued the same day.
  • Remodel with structural work (plan review). Moving a load-bearing wall, replacing one with a beam, enlarging a window or door opening, or turning a garage or an unfinished basement into living space. This permit also covers the electrical, mechanical and plumbing work in the project.

The same-day permit does not cover bearing walls, added load on walls, beams or footings, turning unheated space into heated space, or creating an accessory dwelling unit. If the inspector finds that a job has gone past what the permit covers, the city asks for plans and reviews them.

Inspections

On a remodel without plan review the city inspects four times: before any work starts (a meeting on site to go over the project and the code), before concrete is poured, before framing or insulation is covered, and when the work is done.

Permit office

Bellevue Development Services Permit Center

Bellevue City Hall450 110th Avenue NEBellevue, WA 98004

In person Monday to Thursday, 10 am to 3 pm. Fridays 10 am to 3 pm, by remote service.

What needs a permit

Which projects need a permit in Bellevue

By kind of project
ProjectWhat Bellevue requires
Kitchen remodelReplacing cabinets and countertops needs no building permit. A permit is required to install a new fixture or move one, to add or move electrical circuits, and to move an appliance when that changes gas, water, drain, vent or wiring. A kitchen remodel without structural work fits the same-day remodel permit.
Bathroom remodelA permit is required to install a new fixture or move an existing one, and showers and bathtubs are on the city's permit-required list. Replacing a fixture with the same kind in the same place generally needs none. A bathroom remodel without structural work fits the same-day remodel permit.
Basement finishingTurning a finished basement into living or sleeping space fits the same-day remodel permit. Turning an unfinished basement into living space needs the remodel permit with plan review.
WallsNon-bearing walls can be removed, moved or added under the same-day remodel permit. Moving a load-bearing wall, or replacing it with a beam, needs plan review.
Windows and doorsInstalling or moving a window, door or skylight, or widening an opening, needs a permit with plan review. Replacing one with the same size in the same place needs none.
Water heater, furnace, heat pumpA permit is required to replace or move a water heater, and to install, move or replace a furnace or heat pump.
Garage conversion or ADUConverting a garage to living space and creating an accessory dwelling unit both need plan review.

Work that usually needs no building permit in Bellevue

  • Replacing kitchen cabinets and countertops
  • Replacing an appliance, fixture, window or door with the same kind in the same place
  • A deck less than 30 inches above the ground
  • A fence 8 feet tall or less
  • A detached shed, playhouse or gazebo of 200 square feet or less
  • Siding, except stucco and brick or stone veneer more than 4 feet above grade

From the City of Bellevue's list of work requiring permits. A plumbing or electrical permit can still apply to part of the job, and a shed must still meet the Land Use Code.

Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.

Timing

How long a permit takes in Bellevue

Bellevue publishes review targets. A permit that needs no plan review is an over-the-counter permit, which the city says can typically be turned around within one day. That is the route most kitchen and bathroom remodels without structural work take.

When plans are reviewed, the target is the number of days in which the reviewer should finish the first review. Each round of corrections after that has its own target, and the rounds continue until the plans meet the code. The city states that actual review times will vary.

Complete drawings and prompt answers to the reviewer’s comments are what keep a permit from going extra rounds.

What the city publishes
Step or routePublished figure
Remodel without plan reviewTypically within one day
Single-family remodel with plan reviewFirst review 14 days, each revision 10 days
Single-family additionFirst review 14 days, each revision 10 days
New single-family houseFirst review 21 days, each revision 14 days
City of Bellevue, permit review timelines. These are targets: the city says actual times will vary.

Cost

What a remodel costs in Bellevue

Published job costs, Seattle market, 2025
ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$32,271118.1%
Major kitchen remodel, midrange$95,54253.1%
Major kitchen remodel, upscale$188,40138.7%
Bathroom remodel, midrange$36,14646.8%
Bathroom remodel, upscale$107,45135.3%
Basement remodel$68,35868%
Remodeling magazine, 2025 Cost vs. Value report. The report has no separate table for Bellevue: Seattle is the nearest market it covers. These are survey averages for a standard project, not a quote for your house.

No public cost survey breaks out Bellevue on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.

Sales tax in Bellevue

Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Bellevue is 10.3% for October 1 to December 31, 2026. Addresses outside the Regional Transit Authority district pay 8.9%. On a $100,000 contract, 10.3% is $10,300 of tax. The state can change local rates each quarter, so check the rate again when you sign.

Getting closer to your number

The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.

ADUs and backyard cottages

ADU rules in Bellevue

Bellevue rewrote its ADU rules to match state law. On June 24, 2025 the city council adopted middle housing code changes that allow detached units, which Bellevue did not allow before. The Land Use Code (section 20.20.120) now allows up to two accessory dwelling units on a lot, attached to the house or detached from it.

One caution: the city’s “ADU reform” web page still describes the 2023 rules and says detached units are not allowed. The code has changed since. Check the code itself, or ask Development Services, before you rely on an older page.

Creating an ADU goes through plan review. It cannot use the same-day remodel permit.

The full rules, with the code sections, are in our Bellevue ADU rules guide. For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.

Accessory dwelling units in Bellevue
RuleIn Bellevue
How manyUp to two per lot, attached or detached
SizeUp to 1,200 square feet each
Height of a detached unit24 feet, or 28 feet when built over an existing accessory structure such as a garage
ParkingNone required for a unit under 1,000 square feet, or within half a mile of a major transit stop
Owner occupancyNot required
SaleA unit may be sold to a separate owner
Bellevue Land Use Code 20.20.120, the city's pre-approved plans page and its 2023 ADU reform summary. Confirm the details for your lot with the city before you design.

State and regional rules

Rules that apply in Bellevue and across the region

These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.

Check for asbestos before demolition

The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.

Sales tax covers labor too

For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.3% in Bellevue this quarter. Ask every bidder whether the price they quote includes it.

Hire a registered contractor

Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.

Giant Builders in Bellevue

Remodeling services in Bellevue

Giant Builders Seattle is a licensed general contractor based in Seattle, and Bellevue is part of the area we work in. One company handles the design, the permits and the construction.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Bellevue remodeling questions, answered

01

Do I need a permit to remodel my kitchen in Bellevue?

Often, yes. Bellevue does not require a building permit to replace cabinets or countertops. It does require a permit to install or move a plumbing fixture, to add or move electrical circuits, and to move an appliance when that changes gas, water, drain, vent or wiring. A kitchen remodel with no structural work fits the city's remodel permit without plan review, which is usually issued the same day. Moving a load-bearing wall means plan review.

02

Do I need a permit to remodel a bathroom in Bellevue?

For most remodels, yes. Installing a new fixture or moving one needs a permit, and showers and bathtubs are on the city's permit-required list. Swapping a fixture for the same kind in the same place generally needs none. Without structural work, a bathroom remodel fits the same-day remodel permit.

03

Do I need a permit to finish my basement in Bellevue?

Yes. Bellevue requires a permit for a remodel that changes the interior of the house, even when no structural elements are touched. Turning a finished basement into living or sleeping space fits the remodel permit without plan review. Turning an unfinished basement into living space needs the remodel permit with plan review.

04

How long does a remodel permit take in Bellevue?

A remodel that needs no plan review is an over-the-counter permit, which the city says can typically be turned around within one day. For a single-family remodel with plan review, Bellevue's target is 14 days for the first review and 10 days for each revision. The city says actual review times will vary.

05

How do I apply for a remodel permit in Bellevue?

Online, at MyBuildingPermit.com. Choose Building, then Single Family Residential, then Remodel. The Permit Center at City Hall, 450 110th Avenue NE, has in-person service Monday to Thursday from 10 am to 3 pm. When you hire us, we prepare and file the application.

06

What is the sales tax on a remodel in Bellevue?

10.3% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,300. Addresses outside the Regional Transit Authority district pay 8.9%. The state can change local rates each quarter.

07

How much does a kitchen remodel cost in Bellevue?

There is no published survey for Bellevue alone. The nearest benchmark is Remodeling magazine's 2025 Cost vs. Value report for Seattle: $32,271 for a midrange minor kitchen remodel, $95,542 for a midrange major remodel and $188,401 for an upscale one. Typical Seattle-area kitchens run $75,000 to $130,000 for a full remodel. Sales tax of 10.3% is added in Bellevue.

08

Can I build an ADU on my lot in Bellevue?

Bellevue's Land Use Code allows up to two accessory dwelling units on a lot where a single-family home or middle housing is allowed. They can be attached or detached, each up to 1,200 square feet, and the owner does not have to live on the lot. The city's older ADU web page still shows the 2023 rules, so check the current code or ask Development Services about your lot.

Free estimate

Planning a remodel in Bellevue?

Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

What are you planning?
When would you like to start?

We use your details to answer you. Nothing else.