Basement finishing · Seattle & the Eastside
Basement finishing in Seattle
A basement that is dry, warm and legal to live in, built by one licensed contractor. Here is what has to be right before the drywall goes up, what it costs in this city and how the work runs.

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
What is included
From bare concrete to finished rooms, under one contract.
A basement is usually the least expensive living space you can add to a house, because the walls, the floor and the roof are already there. The work is in making that space dry, bright and safe to sleep in.
Moisture control first
We find where water comes from before anything is framed: gutters and grading outside, cracks and the slab inside. Walls and floors are then built from materials that tolerate damp concrete.
Ceiling height and layout
Ducts and pipes are rerouted or boxed in where it costs the least headroom, and the rooms are laid out around the beams and posts that cannot move.
Bedrooms with egress
A bedroom needs a way out. We cut the foundation wall, set an egress window of the size the code asks for and build the well outside it.
Bathrooms and wet bars
Drains cut into the slab, a pump where the sewer line leaves the house above the floor, and a bathroom finished to the same standard as one upstairs.
Heat, air and insulation
Insulated walls and rim joists, heat sized for the space, fresh air and an exhaust fan, so the basement is as comfortable as the floor above it.
Basement apartments
A separate entrance, a kitchen and a bathroom, permitted with the city as an attached accessory dwelling unit you can rent.
Cost
What basement finishing costs in Seattle
Three sizes of project cover almost every basement we are asked about. The ranges are typical for Seattle-area homes in 2026.
Level 01
Finish the open room
$40,000 to $70,000
About 5 to 8 weeks on site
The main space becomes a family room, an office or a gym. No bathroom and no bedroom.
- Moisture control, framing and insulation
- Wiring, lighting and heat
- Drywall, flooring, trim and paint
- Building and electrical permits
Level 02
Full finish with a bathroom
$70,000 to $120,000
About 8 to 12 weeks on site
The whole level is finished: living space, a bedroom with an egress window and a bathroom.
- Everything in the open room finish
- A bathroom, with drains cut into the slab
- A bedroom with an egress window and well
- Building, electrical and plumbing permits
Level 03
Basement apartment
$120,000 to $200,000
About 12 to 20 weeks on site
A complete home downstairs, permitted as an accessory dwelling unit, or a basement that needs digging to be usable.
- Its own entrance, kitchen and bathroom
- Interconnected smoke alarms in both homes
- A lowered floor or new footings where needed
- Full plan review by the city
Ranges reflect published Seattle figures (Remodeling magazine’s 2025 Cost vs. Value report puts a basement remodel at $68,358 and estimates that it returns 68% of its cost at resale) and typical local pricing. For a basement of 600 to 900 square feet, a full finish works out to roughly $90 to $170 per square foot. Small basements cost more per square foot, because a bathroom, an egress window and the panel work cost the same whatever the size of the room. Sales tax is charged on the full contract in Washington: 10.55% in Seattle. Read the basement cost guide or try the remodel cost calculator.
Permits and code
Ceiling height, egress and permits for a Seattle basement
Finishing a basement turns storage into living space, so the building code has more to say about it than about a kitchen or a bathroom. Three rules decide what your basement can become.
Ceiling height
Seattle’s residential code asks for 7 feet in the habitable rooms of a new house. For living space created in the basement of an existing house the minimum is 6 feet 8 inches, and 6 feet 4 inches under beams, ducts and pipes. Bathrooms and laundry rooms in an existing basement can be 6 feet 4 inches.
A way out of every bedroom
Every new bedroom in a basement needs an emergency escape opening: a window or door with at least 5.7 square feet of clear opening (5 square feet for an opening at ground level), at least 24 inches high and 20 inches wide, with the bottom of the opening no more than 44 inches above the floor. A window below ground level needs a well outside it at least 3 feet wide and 3 feet from front to back, with a ladder or steps if the well is deeper than 44 inches. A basement finished without a bedroom does not need a new escape opening.
Which permits, from whom
- Construction permit (SDCI): for building the new rooms and for any change to the structure. Only minor work worth $6,000 or less in a six-month period is exempt.
- Electrical permit (SDCI): any time wiring is installed, altered or extended.
- Plumbing permit (Public Health Seattle & King County): for a bathroom, a bar sink or a laundry that moves.
A finish that leaves the structure alone may qualify for a subject-to-field-inspection permit, which the Seattle Department of Construction and Inspections (SDCI) screens in a few days. Lowering the basement floor, creating an accessory dwelling unit or changing the number of homes in the building does not qualify. Those go through full plan review. Smoke alarms and carbon monoxide alarms are required on every floor, basements included.
Our basement permit guide covers the Seattle rules in detail, and the permit navigator works out the list for your project. Other cities have their own offices and fees: see the local remodel guides.
What we check at the first visit
- Signs of water: stains, white powder on the walls, a musty smell
- Ceiling height, measured under the lowest beam and duct
- Where the sewer line leaves the house, and at what height
- The electrical panel and its room for new circuits
- Which windows could become an egress window, and what is outside them
Rental units
Turning a basement into a legal apartment

A basement with its own entrance, kitchen and bathroom can be permitted in Seattle as an attached accessory dwelling unit (the city writes AADU). The rules were rewritten in 2025 and 2026, and they are easier to meet than they were.
- A lot may have up to two accessory dwelling units, in the house or in the yard.
- A unit may be up to 1,000 square feet, or 1,200 with three or more bedrooms. Floor area that is underground is not counted toward the limit, and a unit inside a part of the house that existed on July 23, 2023 may be larger.
- The owner does not have to live on the property, and the unit does not need a parking space.
- For one unit added inside an existing house, the residential code does not ask for a fire-rated wall or ceiling between the two homes, as long as the smoke alarms in both are interconnected.
- The permit is a construction addition or alteration permit with plan review. An apartment that already exists without a permit can be made legal with a construction permit that establishes the use.
- King County bills a sewer capacity charge for the new unit: $46.01 a month for 15 years at the 2026 rate.
More on the rules, the costs and the steps on our ADU and DADU page and in the Seattle ADU rules guide.
Older houses
What older Seattle basements hide
Basements in older houses were built for a furnace, a laundry sink and storage, not for living. These are the conditions we look for, and price for, before anything is framed.
Damp concrete
Older slabs were often poured straight on the ground, with nothing under them to stop moisture. Damp comes up through the concrete even when no water is visible, so we test for it before choosing a floor.
Low ceilings and hanging pipes
Heating ducts, drain lines and gas pipes hung below the joists take inches you cannot spare. We reroute what can move and box in what cannot.
An old oil tank
A heating oil tank in the basement or buried in the yard is common in older houses. Taking an underground tank out of service needs a Seattle Fire Department permit.
A house that is not bolted down
Many older houses sit on their foundations without anchor bolts, and the short walls under the first floor are not braced. Seattle publishes a standard earthquake retrofit plan for this, and the work is easiest while the basement walls are open.
Old wiring overhead
Knob-and-tube wiring running through the joists, and an electrical panel with no room for the circuits a finished basement needs.
Asbestos
Wrap on old ducts and pipes and small square floor tiles can contain asbestos. A check for asbestos is required before any renovation, so these are surveyed and dealt with before demolition.
Before and after
Basements, before and after
Giant Builders projects. Drag the line across each one.


Drag the line to compare. Each pair is the same room, before and after.
Process
How a basement finish runs
- 01
Visit and measure
A free visit to measure the ceiling height, look for signs of water and find the sewer line, the panel and the walls that carry the house.
- 02
Design and price
A floor plan that works around the posts, beams and windows, and a written, itemized price for the whole job.
- 03
Permits and orders
We file the permits your project needs and order windows, doors and long-lead items, so the crew starts when the materials are close.
- 04
Build
Moisture work and any concrete cutting first, then framing, plumbing and wiring, inspections, insulation, drywall and finishes, in that order.
- 05
Walkthrough
We walk the finished basement with you and close out every item on the list before we call it done.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Basement finishing questions, answered
01How much does it cost to finish a basement in Seattle?
Most full basement finishes in Seattle, with a bathroom and a bedroom, land between $70,000 and $120,000. Finishing the main room alone can be $40,000 to $70,000, and a basement apartment with its own kitchen and entrance runs $120,000 to $200,000. For a typical basement of 600 to 900 square feet that is roughly $90 to $170 per square foot. For reference, Remodeling magazine's 2025 Cost vs. Value report puts a basement remodel in Seattle at $68,358. Washington sales tax applies to the whole contract, labor included: 10.55% in Seattle.
02Do I need a permit to finish my basement in Seattle?
Yes, in almost every case. Seattle only exempts minor work worth $6,000 or less in a six-month period, and finishing a basement goes well past that. You need a construction permit from the Seattle Department of Construction and Inspections (SDCI), an electrical permit from SDCI for the wiring, and a plumbing permit from Public Health Seattle & King County if you add a bathroom or a bar sink. A finish that leaves the structure alone may qualify for the quicker subject-to-field-inspection permit. We file all of them.
03Is my basement ceiling high enough?
For living space created in the basement of an existing house, Seattle's residential code asks for at least 6 feet 8 inches, and allows 6 feet 4 inches under beams, ducts and pipes. Bathrooms and laundry rooms in an existing basement can be 6 feet 4 inches. If your ceiling is lower than that, the options are to reroute what hangs below the joists or to lower the floor, which is a much larger job and needs full plan review.
04Do I need an egress window for a basement bedroom?
Yes. Every new bedroom in a basement needs an emergency escape opening: a window or door with at least 5.7 square feet of clear opening (5 square feet if it is at ground level), at least 24 inches high and 20 inches wide, with the bottom of the opening no more than 44 inches above the floor. A window below ground level also needs a well outside it. A basement finished without a bedroom does not need a new escape opening.
05How do you keep a finished basement dry?
By dealing with water before anything is built. Outside, gutters, downspouts and the slope of the ground are corrected so water runs away from the house. Inside, cracks are sealed, the slab is tested for moisture, and walls are insulated with foam board against the concrete, not with fiberglass against it. Wood that touches concrete is pressure treated, and the flooring is a type that tolerates some moisture. If water comes in under pressure, a drain and a sump pump are part of the job.
06Can I turn my basement into a rental unit?
In Seattle, yes. A basement apartment is permitted as an attached accessory dwelling unit. The city allows up to two accessory dwelling units on a lot, does not require the owner to live there and does not require a parking space for the unit. It needs its own kitchen and bathroom and a construction permit with plan review, and King County bills a sewer capacity charge for the new unit: about $46 a month for 15 years at the 2026 rate.
07Can you add a bathroom in a basement?
Yes. The slab is cut to run the drains. If the sewer line leaves the house below the basement floor, the bathroom drains by gravity. If it leaves above the floor, which is common in older houses, a sealed pump in the floor lifts the waste up to it. Either way the work needs a plumbing permit.
08How long does it take to finish a basement?
Plan on 8 to 12 weeks of construction for a full finish with a bathroom, 5 to 8 weeks for the main room alone, and 12 to 20 weeks for a basement apartment or a job that involves digging. Design and permits come first and usually take 4 to 10 weeks, longer when the project needs full plan review. We give you a schedule before work starts.
Free estimate
Get a price for your basement
Tell us a little about the space. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Related
Sources
- 01Seattle SDCI: Do you need a permit? (read Nov 18, 2026)
- 02Seattle Residential Code (2021): sections R305, R310, R302.3 and R4404.6 (read Nov 18, 2026)
- 03Seattle SDCI Tip 316: Subject-to-field-inspection permits (read Nov 18, 2026)
- 04Seattle SDCI Tip 303A: Common Seattle Residential Code requirements (read Nov 18, 2026)
- 05Public Health Seattle & King County: plumbing and gas piping permits (read Nov 18, 2026)
- 06Seattle SDCI: Electrical permit (read Nov 18, 2026)
- 07Seattle SDCI: Accessory dwelling units (read Nov 18, 2026)
- 08Seattle Ordinance 127376: accessory dwelling unit rules in SMC 23.42.022 (passed Dec. 16, 2025) (read Nov 18, 2026)
- 09King County: sewer capacity charge (read Nov 18, 2026)
- 10Seattle SDCI: Earthquake home retrofit permit (read Nov 18, 2026)
- 11Puget Sound Clean Air Agency: asbestos rules for renovation by contractors (read Nov 18, 2026)
- 12Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 13Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 14Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)