Skip to the content

Local remodel guide · King County

Home remodeling in Kirkland, WA

What a Kirkland homeowner needs to know before a kitchen, bathroom or basement remodel: when the city wants a permit, how its review tracks work, what a remodel costs here and what the ADU rules allow.

By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

A kitchen with white shaker cabinets, a white quartz island on a gray base and a pendant light above it
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short version

Remodeling in Kirkland at a glance

The facts a homeowner in Kirkland asks for first. Each one is explained further down, and the sources are at the end of the page.

Kirkland in brief
QuestionAnswer
Who issues permitsThe City of Kirkland's Development Services Center, on the upper floor of City Hall.
Where to applyOnline at MyBuildingPermit.com, which Kirkland also uses for inspections and permit status.
Electrical and plumbing permitsIssued by the city as well, through the same office.
The basic ruleKirkland's code requires a permit before a building or its electrical, mechanical or plumbing systems are altered. Finish work such as painting, tile, cabinets and countertops is exempt.
Review tracksOver the counter (typically within one day), then Express, Fast Track and Regular, with first-review goals of 3 business days, 10 business days and 4 weeks.
Sales tax10.4% on the whole contract, labor included, for October 1 to December 31, 2026.
ADUsTwo per property, attached or detached, each up to 1,200 square feet.

Permits

Who issues remodel permits in Kirkland

Kirkland’s Development Services Center takes every permit application for a house: building, electrical, mechanical and plumbing. Applications go in online through MyBuildingPermit.com, where you also schedule inspections and check a permit’s status.

The rule in the city code

Kirkland Municipal Code 21.06.205 requires a permit before anyone constructs, enlarges, alters, repairs, moves, demolishes or changes a building or its electrical, mechanical or plumbing systems. Section 21.06.215 lists the exemptions. The city’s own examples of work that needs a permit include interior remodels, adding, removing or moving walls whether load-bearing or not, and removing or installing drywall.

In practice, new cabinets, counters and tile are exempt. Once walls are opened, or wiring and pipes move, the job needs a permit.

Before you apply

A pre-submittal conference is optional for a single-family project. If you want one, it is booked through MyBuildingPermit.com at least 10 business days ahead. A detached accessory dwelling unit needs its own application with its own plans.

Permit office

Kirkland Development Services Center

Kirkland City Hall, upper floor123 Fifth AvenueKirkland, WA 98033

Monday, Tuesday, Thursday and Friday, 8 am to 5 pm. Wednesday, 10:30 am to 5 pm.

What needs a permit

Which projects need a permit in Kirkland

By kind of project
ProjectWhat Kirkland requires
Kitchen remodelPainting, tiling, cabinets, countertops and similar finish work are exempt, and so is replacing an appliance with the same kind in the same place. Interior remodels, wall changes, drywall removal or installation, electrical circuit changes and gas piping all need permits.
Bathroom remodelReplacing a toilet or sink with the same kind in the same place is exempt when the plumbing and electrical lines are not changed. Moving fixtures needs a plumbing permit, new or altered circuits need an electrical permit, and opening the walls makes the job an interior remodel.
Basement finishingFinishing a basement means new walls, drywall and wiring, and Kirkland lists each of those as work that needs a permit. Plumbing and mechanical work need their own permits.
WallsAdding, removing or moving a wall needs a permit, whether the wall is load-bearing or not.
Water heater, furnace, heat pump, gasInstalling a water heater, a furnace or a heat pump needs a permit. So does installing or changing gas piping.
Garage conversion or ADUConverting a garage to living space and building an accessory dwelling unit both need permits.
DecksA deck more than 30 inches above grade needs a permit.

Work that usually needs no building permit in Kirkland

  • Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
  • Replacing an appliance or fixture with the same kind in the same place, when gas, plumbing and electrical lines are not changed
  • Replacing a window with the same kind
  • Re-roofing a house with the same kind of roofing, when the roof sheathing stays in place
  • A deck 30 inches or less above grade that is not over a basement or a story below
  • A one-story storage shed or playhouse of 200 square feet or less
  • A fence 6 feet tall or less

From the City of Kirkland's permit page (Kirkland Municipal Code 21.06.215). The exemptions do not apply in flood hazard, wetland, steep slope, shoreline or other critical areas, and zoning rules such as setbacks still apply.

Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.

Timing

How long a permit takes in Kirkland

Kirkland sorts permits into four review tracks. The city calls its timelines target dates and says actual review times depend on workload and staffing.

  • Over the counter. No plan review. Plumbing, mechanical and electrical work inside a single-family house is on this list.
  • Express. For a house, alterations must stay within 50% of the existing square footage and leave the roof line alone. An addition must be 500 square feet or less, on one level, with no heated space.
  • Fast Track. Single-family alterations and additions qualify when the addition is no more than 50% of the existing square footage.
  • Regular. Everything that fits none of the other three.
What the city publishes
Step or routePublished figure
Over the counterTypically within one day
Express3 business days (goal)
Fast Track10 business days (goal)
Regular4 weeks (goal)
City of Kirkland, Time to Review Goals (updated September 15, 2026), first review of a single-family addition or alteration. Goals, not promises: actual times depend on workload and staffing.

Cost

What a remodel costs in Kirkland

Published job costs, Seattle market, 2025
ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$32,271118.1%
Major kitchen remodel, midrange$95,54253.1%
Major kitchen remodel, upscale$188,40138.7%
Bathroom remodel, midrange$36,14646.8%
Bathroom remodel, upscale$107,45135.3%
Basement remodel$68,35868%
Remodeling magazine, 2025 Cost vs. Value report. The report has no separate table for Kirkland: Seattle is the nearest market it covers. These are survey averages for a standard project, not a quote for your house.

No public cost survey breaks out Kirkland on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.

Sales tax in Kirkland

Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Kirkland is 10.4% for October 1 to December 31, 2026. On a $100,000 contract, 10.4% is $10,400 of tax. The state can change local rates each quarter, so check the rate again when you sign.

Getting closer to your number

The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.

ADUs and backyard cottages

ADU rules in Kirkland

Kirkland allows two accessory dwelling units on a property, and both may be attached or detached. The rules are in Kirkland Zoning Code 115.07, which the city council updated in June 2025.

An ADU must meet the same development standards as the house: floor area ratio, lot coverage and setbacks. Shoreline properties have tighter rules, and some may have only one unit.

The full rules, with the code sections, are in our Kirkland ADU rules guide. For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.

Accessory dwelling units in Kirkland
RuleIn Kirkland
How manyTwo, attached or detached in any mix
SizeUp to 1,200 square feet each
ParkingNone required within half a mile of a major transit stop. Elsewhere, one space for the first unit unless street parking is available within 600 feet.
OwnershipA unit may be owned separately from the main house
ApplicationA detached unit needs its own permit application and plans
City of Kirkland, ADU regulations page, and Kirkland Zoning Code 115.07.

State and regional rules

Rules that apply in Kirkland and across the region

These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.

Check for asbestos before demolition

The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.

Sales tax covers labor too

For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.4% in Kirkland this quarter. Ask every bidder whether the price they quote includes it.

Hire a registered contractor

Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.

Giant Builders in Kirkland

Remodeling services in Kirkland

Giant Builders Seattle is a licensed general contractor based in Seattle, and Kirkland is part of the area we work in. One company handles the design, the permits and the construction.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Kirkland remodeling questions, answered

01

Do I need a permit to remodel my kitchen in Kirkland?

It depends on how far the work goes. Kirkland exempts painting, tiling, cabinets, countertops and similar finish work, and replacing an appliance or fixture with the same kind in the same place. The city lists interior remodels, wall changes, drywall removal or installation, electrical circuit changes and gas piping as work that needs a permit. Most full kitchen remodels include several of those.

02

Do I need a permit to remodel a bathroom in Kirkland?

Replacing a toilet or sink with the same kind in the same place is exempt, and so is new tile. Moving a fixture, changing wiring or opening the walls needs a permit. Plumbing, mechanical and electrical permits for work inside a single-family house are over-the-counter permits, which Kirkland says are typically turned around within one day.

03

Do I need a permit to finish my basement in Kirkland?

Yes. Finishing a basement means new walls, drywall, wiring and often plumbing, and Kirkland lists each of those as work that needs a permit.

04

How long does a remodel permit take in Kirkland?

Kirkland uses four review tracks: over the counter (typically within one day), then Express, Fast Track and Regular, whose first-review goals for a house are 3 business days, 10 business days and 4 weeks. An alteration that stays within half of the house's floor area and does not change the roof line can qualify for Express. The city calls these target dates and says actual times depend on workload and staffing.

05

How do I apply for a permit in Kirkland?

Online, at MyBuildingPermit.com. The Development Services Center is on the upper floor of City Hall at 123 Fifth Avenue, open Monday, Tuesday, Thursday and Friday from 8 am to 5 pm and Wednesday from 10:30 am to 5 pm. When you hire us, we prepare and file the application.

06

What is the sales tax on a remodel in Kirkland?

10.4% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,400. The state can change local rates each quarter.

07

How much does a bathroom remodel cost in Kirkland?

There is no published survey for Kirkland alone. The nearest benchmark is Remodeling magazine's 2025 Cost vs. Value report for Seattle: $36,146 for a midrange bathroom remodel and $107,451 for an upscale one. Sales tax of 10.4% is added in Kirkland.

08

How many ADUs can I build in Kirkland?

Two per property, attached or detached, each up to 1,200 square feet. No off-street parking is required within half a mile of a major transit stop, and a unit may be owned separately from the main house. Shoreline properties have tighter rules.

Free estimate

Planning a remodel in Kirkland?

Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

What are you planning?
When would you like to start?

We use your details to answer you. Nothing else.