How can I tell if my pipes are galvanized?

Find a bare stretch of water pipe near the water heater, the main shutoff or under the house, and hold a magnet to it. East Bay Municipal Utility District, a public water utility in California, gives the test: a magnet sticks only to iron and steel pipe, not to copper, plastic or lead. Then scratch the surface with a coin or key: galvanized pipe stays dull gray, copper looks like a penny, and lead is soft and turns shiny silver.

Galvanized pipe is steel dipped in molten zinc. Saint Paul Regional Water Services dates its use in homes from the 1880s to the 1960s, copper from the 1930s and most widely from the 1960s on, and PEX (cross-linked polyethylene, a flexible plastic) to most homes built since the late 1990s. A house can have a mix, with copper or PEX added where rooms were remodeled, which HUD treats as a reason to look closely.

How long do galvanized pipes last, and what are the warning signs?

HUD's Residential Rehabilitation Inspection Guide puts the service life of galvanized steel water pipe at 20 to 50 years, depending on the quality of the pipe and its joints and on the minerals in the water. In a house built before the 1960s, original galvanized pipe is past that range.

Service life of galvanized steel water pipe (HUD)
20 to 50 years
Service life of galvanized steel water pipe (HUD)
Normal service life of copper water pipe (HUD)
50+ years
Normal service life of copper water pipe (HUD)
Cast iron waste pipe, an industry estimate in HUD's appendix
75 to 100 years
Cast iron waste pipe, an industry estimate in HUD's appendix
  • Rust-colored water, especially from the hot water lines (HUD)
  • Low flow and low pressure, or pressure that differs from fixture to fixture (HUD, Saint Paul Regional Water Services)
  • Rusted fittings, and leaks near joints and pipe supports (HUD)
  • Brown stains in sinks (Saint Paul Regional Water Services)

The zinc coating wears away first. Then the steel rusts, and the corrosion builds up in mounds called tubercles that narrow the pipe and block flow (EBMUD), until the pipe rusts through and leaks. HUD's guide says galvanized pipe need not be replaced unless it shows deterioration, leaks or restricted flow, but that if galvanized steel piping is exposed during a rehabilitation, replacing it should be considered.

Do galvanized pipes put lead in Seattle's water?

Seattle's water leaves the utility lead-free; the risk sits in house plumbing. Seattle Public Utilities (SPU) says its sources do not contain lead and there are no known lead service lines in its distribution system, though a small number of homes may have short lead connections. Lead can leach from lead-based solder and brass fixtures, and SPU treats the water to reduce corrosion.

Galvanized pipe matters here in two ways. EBMUD notes that the zinc coating itself can contain lead, and that where a lead pipe was once connected upstream, lead-bearing scale can form inside galvanized pipe and come loose later. EPA says lead pipes, fixtures and solder are more likely in homes built before 1986, and federal law now limits lead in plumbing products to a weighted average of 0.25% (SPU dates that limit to January 2014).

To test, SPU points to a lab certified by the Washington Department of Ecology; analysis costs $25 to $50. When water has sat in the pipes for more than six hours, SPU advises running the tap for 30 seconds to 2 minutes before drinking, and using cold water for drinking and cooking.

Should I repipe the whole house or only the remodeled rooms?

If the remodel opens most of the plumbing walls, replace the whole supply system; if it opens one room, replace back to a sound connection and plan the rest. HUD's guide calls a mix of galvanized steel and copper or brass a sign of potential trouble, because joints between dissimilar metals corrode by galvanic action unless a dielectric coupling separates them. No separation is needed between metal and plastic pipe.

HUD also says low flow and low pressure in these systems come from rust and mineral deposits in the galvanized pipe, so a new bathroom fed by old galvanized pipe upstream can still see weak flow.

Three common repipe scopes
ScopeWhat is replacedWhen it fits
Room onlySupply lines inside the remodeled room, back to a sound connectionOne room is open and the rest of the pipe still performs well
Main runsThe main line from the shutoff, the water heater connections and the trunk lines under the housePressure is low everywhere, or a whole-house project is phased
Whole houseAll hot and cold supply piping, with shutoff valves at the fixturesMost walls are open, or rust and leaks show up in several places

Which pipes are mine and which belong to the utility?

In Seattle, the property owner is responsible for installing and maintaining the private water line from the city's union, at the meter, to the building's plumbing (SPU). Changing the water service itself goes through an SPU water service application. The side sewer is also the owner's, from the house to the public sewer main under the street, including the part beyond the property line, and SPU takes side sewer permit questions at (206) 684-5362.

In other cities, the water district or city utility draws its own line, so ask yours before a project that changes the service.

What permit does a repipe need?

A plumbing permit, from Public Health Seattle and King County in Seattle, Clyde Hill and unincorporated King County, and from the city's building department in other King County cities. Public Health requires a permit whenever a plumbing system is installed, relocated or changed. A homeowner's permit authorizes the homeowner to do the plumbing personally (RCW 18.106.150); a plumber you hire must be a registered contractor.

For a single-family house, Public Health treats a repipe as an over-the-counter permit applied for online, without plan review; its plan review rule for re-pipes covers buildings of three or more stories and exempts single-family houses. The permit lists the re-pipe as representative fixtures (hot water, cold water and drainage), plus any fixture being replaced that needs in-wall plumbing changes.

Public Health plumbing permit fees, effective January 1, 2026
ItemFee
Plumbing permit$137 plus $27 per fixture
Re-inspection$137
Plan review, where required$273 an hour
Permit renewal$68
Work done before a permit (Already Built Construction permit)$273 plus $55 per fixture

Example: a re-pipe of hot and cold water plus one new tub and shower valve lists three fixtures: $137 + 3 x $27 = $218. For re-pipes that go through plan review, Public Health adds a supplemental fee set by the number of inspections agreed in advance on its R-20 worksheet.

How does a repipe go, step by step?

  1. 01

    Test and look

    Check pressure at several fixtures, identify the pipe material at the meter and the water heater, and test the water if lead is a concern. If pipe wrap or old flooring will be disturbed, the asbestos survey the Puget Sound Clean Air Agency requires comes first.

  2. 02

    Plan the routes

    Run new lines through the crawl space, basement and attic where possible, to keep wall openings small, and plan shutoff valves at each fixture.

  3. 03

    Get the permit

    In Seattle, an online over-the-counter permit from Public Health; elsewhere, from the city.

  4. 04

    Run and connect

    New piping goes in alongside the old, and the water is shut off while each line is switched over.

  5. 05

    Inspect

    Public Health inspects the new piping; schedule it before walls and floors are closed. A failed inspection means a $137 re-inspection.

  6. 06

    Flush and patch

    Flush the new lines, check each fixture, and patch the openings.

The bathroom and kitchen permit guides cover the rest of the plumbing in a remodel: bathroom permits in Seattle. Giant Builders includes the pipe check in its free in-home estimate; the plumbing permit is pulled by the plumbing contractor doing the work, as Public Health's process sets out.