Skip to the content

Bathroom remodeling · Seattle & the Eastside

Bathroom remodeling in Seattle

A bathroom that stays dry behind the tile, built by one licensed contractor from the first drawing to the final inspection. Here is what goes into it, what it costs in this city and how the work runs.

A bathroom with grey stone-look tile, a floating vanity with a round lit mirror and a freestanding tub
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

What is included

Everything a bathroom needs, under one contract.

A bathroom packs plumbing, wiring, waterproofing and tile into the smallest room in the house, and each has to be finished and inspected before the next can start. We run all of it.

Showers and tubs

Tiled walk-in showers, tub-to-shower conversions, soaking tubs and tub and shower combinations, with the valve, the head and the drain placed for how you use them.

Waterproofing

A continuous waterproof layer behind the tile, across the shower floor and over the curb. The shower pan is filled with water and checked before any tile is set. This layer decides how long the bathroom lasts.

Tile and stone

Porcelain, ceramic or natural stone, laid out on paper first so the cuts fall where you will not notice them. Niches and benches are framed in before the walls are closed.

Vanities and storage

Single or double vanities, floating or to the floor, with tops in quartz or stone, and medicine cabinets and linen storage sized to the room.

Ventilation, heat and lighting

A quiet exhaust fan ducted to the outside, lighting at the mirror and in the shower on separate switches, and electric floor heat under the tile if you want it.

Accessible bathrooms

Curbless showers, solid blocking in the walls for grab bars, a bench, a hand shower, a wider door and a floor that is not slippery when wet. Built now, or made ready for later.

Cost

What a bathroom remodel costs in Seattle

Three sizes of project cover almost every bathroom we are asked about. The ranges are typical for Seattle-area homes in 2026.

Level 01

Refresh or tub-to-shower

$15,000 to $30,000

About 2 to 3 weeks on site

The layout stays. The fixtures and surfaces you touch every day are replaced, or the tub becomes a shower in the same spot.

  • New vanity, top, faucet and toilet
  • Tub replaced by a tiled shower in the same footprint
  • New exhaust fan and lighting
  • Plumbing and electrical permits as needed; often no building permit

Level 02

Full remodel

$35,000 to $65,000

About 4 to 6 weeks on site

The room is taken back to the studs and rebuilt, with every fixture, pipe and wire inside it made new.

  • New tub or shower with full waterproofing
  • Tile floor and walls, new vanity and storage
  • Rewired and replumbed to current code
  • Plumbing and electrical permits; a building permit if walls change

Level 03

Primary bath or new layout

$75,000 to $130,000

About 8 to 12 weeks on site

Fixtures move, walls move, or the bathroom grows into a closet or the next room.

  • Large or curbless shower, freestanding tub
  • Double vanity, custom glass, heated floor
  • Drains and vents rerouted under the floor
  • Building, plumbing and electrical permits

Ranges reflect published Seattle figures (Remodeling magazine’s 2025 Cost vs. Value report: $36,146 for a midrange bathroom remodel, $58,151 for a universal design remodel, $107,451 upscale) and typical local pricing. Sales tax is charged on the full contract in Washington: 10.55% in Seattle. Your written estimate is for your house, not an average. Read the bathroom cost guide or try the remodel cost calculator.

Showers and access

Tub-to-shower conversions and accessible bathrooms

A walk-in shower with grey tile walls, a skylight above it and a wooden stool beside it

A walk-in shower fits in the space a tub leaves behind, so the change can usually be made without moving a wall. It is also the simplest way to make an older bathroom safer to step into.

What a conversion involves

  • The tub and the wall finish around it come out, down to the studs.
  • The drain and the mixing valve are changed for a shower, under a plumbing permit.
  • The floor is sloped to the drain, and the floor, walls and curb are waterproofed and water-tested.
  • Tile, a niche or a bench, and a glass panel or door finish it.

Building for the years ahead

The same job is the right time to make the room easier to use: no curb at the shower, blocking in the walls for grab bars, a bench, a hand shower on a slide bar and a wider door. Blocking costs very little while the walls are open and saves opening them again later.

See finished rooms in our bathroom design ideas.

Permits

Which permits a Seattle bathroom needs

A bathroom remodel in Seattle can involve three permits, and they come from two different agencies. Which ones you need depends on what changes behind the walls.

Who issues what

  • Plumbing permit (Public Health Seattle & King County): whenever plumbing is installed, moved or changed. A relocated toilet, a tub turned into a shower and new supply lines all count.
  • Electrical permit (SDCI): any time wiring is installed, altered or extended. A new fan, a heated floor, added lights and outlets all count.
  • Building permit (SDCI): when a wall moves, a window or door opening changes, or the structure is touched.

Seattle’s Department of Construction and Inspections (SDCI) does not ask for a building permit for minor repairs and alterations worth $6,000 or less in any six-month period, or for new surface finishes over existing walls. A permit is always needed for work on load-bearing supports, for changes to the outside walls, and for anything that reduces light, ventilation or fire resistance, however small the job.

When a building permit is needed, many bathrooms qualify for a subject-to-field-inspection permit, which SDCI screens in a few days instead of sending through full plan review.

Outside Seattle, plumbing permits come from each city’s own building department. Our bathroom permit guide goes through the Seattle rules in detail, the local remodel guides cover Bellevue, Kirkland, Redmond and seven more cities, and the permit navigator works out the list for your project.

What we check at the first visit

  • Where the drain and vent lines run, and what they are made of
  • The floor framing under the tub and the toilet
  • Whether the fan vents outside or into the attic
  • The electrical panel and the bathroom circuits
  • The shutoff valves and the water pressure

Older houses

What older Seattle houses hide behind a bathroom

Many Seattle houses were built long before today's plumbing and electrical codes. These are the conditions we look for, and price for, before the first tile comes off.

Old supply and drain pipes

Galvanized steel supply lines that have closed up with rust, and cast iron or lead drains that have cracked or sagged. They are replaced back to a sound connection while the walls and floor are open.

Rot under the tub and toilet

Years of small leaks soften the subfloor and the joists below. We also find joists that an earlier plumber notched too deeply. Both are repaired before any new floor goes down.

A fan that goes nowhere

Many older bathrooms have no fan, or one that blows into the attic. Seattle requires a bathroom exhaust fan, and the duct must end outside the building.

Old wiring

Knob-and-tube or ungrounded wiring, one circuit shared with the bedrooms, and no ground-fault protection at the sink. New bathroom circuits are part of most remodels.

Plaster and mortar-bed tile

Tile set in an inch or more of mortar over wood lath is heavy, slow demolition, and the walls behind it are rarely straight. We plan the time and the framing work to true them up.

Asbestos in old finishes

Old sheet flooring, tile adhesive and wall texture can contain asbestos. The Puget Sound Clean Air Agency requires a check for asbestos before any renovation, so suspect materials are surveyed before demolition starts.

Before and after

Bathrooms, before and after

Giant Builders projects. Drag the line across each one.

Bathroom remodel no. 8: after
Bathroom remodel no. 8: before
BeforeAfter

Drag the line to compare. Each pair is the same room, before and after.

See all bathroom before and after photos

Process

How a bathroom remodel runs

  1. 01

    Visit and measure

    A free visit to see the room, measure it and hear what is not working. We look under the sink, at the fan and at the framing and pipes below the floor where we can reach them.

  2. 02

    Design and price

    A layout, tile and fixture selections, and a written, itemized price for the whole job.

  3. 03

    Permits and orders

    We file the permits your project needs and order tile, fixtures and the vanity, so the crew starts when the materials are close.

  4. 04

    Build

    Floor protection and dust walls first, then demolition, plumbing and wiring, inspections, waterproofing, tile, glass and fixtures, in that order.

  5. 05

    Walkthrough

    We walk the finished bathroom with you and close out every item on the list before we call it done.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Bathroom remodeling questions, answered

01

How much does a bathroom remodel cost in Seattle?

Most full bathroom remodels in Seattle land between $35,000 and $65,000. A refresh or a tub-to-shower conversion that keeps the layout can be $15,000 to $30,000, and a primary bath with a new layout runs $75,000 to $130,000. For reference, Remodeling magazine's 2025 Cost vs. Value report puts a midrange bathroom remodel in Seattle at $36,146 and an upscale one at $107,451. Washington sales tax applies to the whole contract, labor included: 10.55% in Seattle.

02

Do I need a permit to remodel a bathroom in Seattle?

Usually, yes. Any time plumbing is installed, moved or changed you need a plumbing permit from Public Health Seattle & King County, and any new or altered wiring needs an electrical permit from the Seattle Department of Construction and Inspections (SDCI). A building permit from SDCI is needed when a wall, a window or the structure changes. Seattle does not ask for a building permit for minor work worth $6,000 or less in a six-month period or for new surface finishes. We sort out which apply and file them.

03

How long does a bathroom remodel take?

Plan on 4 to 6 weeks of construction for a full remodel, 2 to 3 weeks for a refresh or a tub-to-shower conversion, and 8 to 12 weeks when the layout changes. Design, selections and permits come first and usually take 3 to 8 weeks. Custom shower glass is measured after the tile is finished, so it is the last thing to arrive. We give you a schedule before work starts.

04

Can you convert my tub into a walk-in shower?

Yes. The tub comes out, the drain and the valve are changed for a shower, the walls and floor are waterproofed, and the shower is tiled and fitted with glass. Because the plumbing changes, the job needs a plumbing permit. If it is the only tub in the house, think about resale before you decide: some buyers with small children want one.

05

Can we stay in the house during the remodel?

If the house has a second bathroom, yes, and most families do. If this is the only bathroom, you will be without a shower for most of the job and without a toilet for part of it, so plan for that before work starts. We close the work area off with dust walls and leave the site clean at the end of each day.

06

What makes a bathroom accessible?

A shower you can walk or roll into with no curb, blocking in the walls so grab bars can go anywhere, a bench and a hand shower, a wider door, lever handles, a taller toilet and flooring with grip when wet. Remodeling magazine's 2025 Cost vs. Value report puts a universal design bathroom remodel in Seattle at $58,151.

07

What surprises come up in older Seattle bathrooms?

The common ones are corroded galvanized supply pipes, cracked cast iron drains, rot in the floor under the tub and the toilet, a fan that vents into the attic, and old wiring with no ground-fault protection. Old flooring, adhesive and wall texture can contain asbestos, so they are checked before demolition. We look for all of it at the first visit so it is in the price, not a change order.

08

Which areas do you serve?

Seattle and the Eastside, including Bellevue, Kirkland, Redmond, Mercer Island, Renton and Issaquah, and south through Kent, Auburn and Federal Way to Tacoma.

Free estimate

Get a price for your bathroom

Tell us a little about the room. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

When would you like to start?

We use your details to answer you. Nothing else.