Home remodeling in Issaquah, WA
Where a permit is filed in Issaquah, which projects need one, what sales tax adds, what the work costs and what the city allows for backyard cottages. Each fact is tied to the city or state page it comes from.
By Giant Builders SeattleUpdated Facts checked Nov 18, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
Remodeling in Issaquah, in short
Most remodels in Issaquah need a permit from the city, applied for online at MyBuildingPermit.com, and new wiring needs a separate electrical permit from the state. Sales tax adds 10.5% to the contract. The nearest published costs are for the Seattle market: about $75,000 to $130,000 for a typical full kitchen remodel, with survey figures of $36,146 for a midrange bathroom and $68,358 for a basement.
Issaquah allows two accessory dwelling units on a lot, up to 1,000 square feet each, and lets a licensed architect certify the building plans for a detached one.
| Question | Answer |
|---|---|
| Who issues building permits? | The City of Issaquah, through its Community Planning and Development department. Permit Center: 425-837-3100. |
| How do I apply? | Online at MyBuildingPermit.com. The city does not accept paper plans. |
| Who issues electrical permits? | The Washington State Department of Labor & Industries (L&I), not the city. |
| What is the sales tax? | 10.5% on the full contract price, for October 1 to December 31, 2026. |
| How many ADUs can a lot have? | Two, attached or detached, up to 1,000 square feet each. |
| Which county? | King County. |
Permits
Permits for a remodel in Issaquah
Building permits in Issaquah come from the city’s Community Planning and Development department. Applications are made online at MyBuildingPermit.com, the permit portal Issaquah shares with Bellevue, Kirkland, Sammamish and other cities.
The city does not accept paper applications or plans. Drawings are uploaded as PDF files and reviewed on screen, and you can follow the review from your MyBuildingPermit account.
The remodel permit
Interior work on a house or a duplex is applied for under one permit type: Single Family Residential, Remodel. The city’s checklist for it asks for a fixture schedule for the plumbing and mechanical work, and for structural calculations where they apply.
Electrical permits come from the state
Issaquah does not issue electrical permits. The Washington State Department of Labor & Industries (L&I) reviews and issues them and inspects the work. The permit has to be bought by whoever does the wiring, so on a remodel it is the electrical contractor’s and not the homeowner’s.
How long review takes
Issaquah publishes target review times, set in weeks for each round of review, in a handout on its permitting pages. The city notes that the scope and complexity of a project change the time. Ask the Permit Center for the current target before you fix a start date.
Permit office
City of Issaquah Permit Center
Community Planning and DevelopmentPhone 425-837-3100| Project | What it takes in Issaquah |
|---|---|
| Kitchen remodel | No building permit for painting and similar finish work. Past that, a Single Family Residential Remodel permit from the city, and an L&I electrical permit for new circuits and lighting. |
| Bathroom remodel | The same route: a city remodel permit once the work goes past finishes, with the plumbing and mechanical work listed on it, and an L&I electrical permit for new wiring. |
| Basement finishing | A city remodel permit. Finishing a basement builds walls and adds wiring, and often a bathroom, so it is more than finish work. The wiring needs an L&I electrical permit. |
Work the city lists as needing no building permit
- Painting and similar finish work
- Fences up to 6 feet high
- One-story detached sheds and playhouses under 200 square feet that meet the zoning setbacks
- Decks no more than 30 inches above the ground
The city adds that plumbing, electrical or mechanical permits may still be required for these items unless they are exempt as well. Other rules, such as the fence regulations, still apply.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs. Our Seattle permit guides explain what turns a simple update into permitted work, room by room: kitchen, bathroom and basement. The office, the forms and the fees are what change in Issaquah.
Sales tax
Sales tax on a remodel in Issaquah
The Washington Department of Revenue lists a combined state and local sales tax rate of 10.5% for Issaquah for October 1 to December 31, 2026. Seattle’s rate is 10.55%.
On a remodel, the tax is collected on the total contract price. That means labor and the contractor’s markup as well as materials, so it is one of the larger lines in a budget. When you compare bids, ask each bidder whether the number includes it.
The state’s table lists a second rate of 9.1% for the part of Issaquah that lies outside the regional transit district.
The state can change local rates at the start of each quarter, so check the rate again when you sign.
| Contract price | Sales tax | Total |
|---|---|---|
| $50,000 | $5,250 | $55,250 |
| $100,000 | $10,500 | $110,500 |
| $150,000 | $15,750 | $165,750 |
Costs
What a remodel costs in Issaquah
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
| Accessory dwelling unit | $210,944 | 32.3% |
The Cost vs. Value report covers three Washington markets, Seattle, Spokane and Kennewick, so the Seattle table is the nearest published benchmark for Issaquah. Typical kitchen projects in the Seattle area run $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Add 10.5% sales tax to any of these. What an older house needs behind the walls, such as new wiring, new supply pipes or a floor brought back to level, is priced after a visit and not from a table.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our Seattle cost guides go line by line: kitchen, bathroom, basement and ADU and DADU. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU and DADU rules in Issaquah
Issaquah’s ADU standards are in section 18.500.090 of its Land Use Code, which the city amended in 2025 (Ordinance 3092).
The city does not offer pre-approved ADU plans. It does offer a way for an architect to certify the building plans of a detached unit, which is described under the table.
For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction and garage conversions. A home outside the city limits follows its county’s rules instead. For King County, see ADU rules in unincorporated King County.
| Rule | In Issaquah |
|---|---|
| How many | Two with a single-family house, in any combination of attached and detached, on a lot that meets the zone's density and minimum lot size for the main house. |
| Size | Up to 1,000 square feet each. Garages, storage sheds and decks are not counted, unless that space is what becomes the ADU. |
| Parking | Parking for the house and the ADU has to fit on the lot under the city's parking chapter. Tandem spaces count. State law limits what a city can ask for. |
| Address | Each ADU gets its own address, separate from the main house. |
| Owner living on site | State law does not let a city require it. |
Self-certified plans for a detached ADU
Issaquah describes itself as the first city in Washington to offer a self-certification program for detached ADUs. A Washington-licensed architect certifies that eligible plans meet the building code, and the city says the program is designed to cut plan review time. Land use, utility and site reviews still take place, and a project in a geologically hazardous area does not qualify. The application goes through MyBuildingPermit.com with a signed affidavit.
The sewer capacity charge
King County bills a capacity charge to homes newly connected to a sewer system whose sewage is treated at a King County plant. For an ADU connected in 2026 it is $46.01 a month for 15 years, which is 0.59 of the $77.99 residential rate, or one discounted payment. Your sewer provider can tell you whether your address is in that service area.
What Washington law sets for every city
The state’s ADU law (RCW 36.70A.681) is a floor that a city’s rules cannot go below. Cities in King and Pierce counties had to write it into their codes with the comprehensive plan update that was due by December 31, 2024, and where a local rule still conflicts, the state law overrides it. In Issaquah that means:
- At least two ADUs on a lot where a single-family house is allowed: attached, detached or one of each
- No rule that the owner must live on the property
- A size limit of no less than 1,000 square feet for each unit
- A height limit of no less than 24 feet, unless the main house is held lower
- No off-street parking requirement within half a mile's walk of a major transit stop
- An existing building such as a detached garage may be converted, even where it sits inside today's setbacks
- No ban on selling an ADU as a condominium unit
- Impact fees of no more than half of what the main house would pay
The limits of the law: it does not apply to a lot with critical areas such as wetlands or steep slopes, a city may refuse an ADU on a lot that is not on public sewer, and a city may restrict short-term rentals.
Your house
What to check before work starts on a house in Issaquah
Issaquah Highlands and other association neighborhoods
A city permit is not the only approval some Issaquah homes need. In Issaquah Highlands, the community association says owners may need approval from its Architectural Review Committee for changes to a home’s exterior, fencing and yard. The committee meets on the first Tuesday of each month, applications are due seven days before the meeting, and owners hear back within a week after it.
If your home is in any homeowners association, read its rules before you fix a start date. The Highlands committee looks at the outside of the home and the yard, so an addition or a backyard cottage is the kind of project to check first.
Slopes and other hazard areas
The city keeps projects in geologically hazardous areas out of its faster route for detached ADUs. If your lot is steep or sits below a slope, ask the Permit Center early what the site review will need.
Lead paint in houses built before 1978
Under the federal Renovation, Repair and Painting rule, a firm that is paid to disturb painted surfaces in a home built before 1978 must be certified by the EPA as lead-safe and must use lead-safe work practices. Ask any contractor you interview for that certificate.
An asbestos check before any renovation
The Puget Sound Clean Air Agency, whose territory includes King and Pierce counties, requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, unless an owner is surveying the single-family house they live in. The results are shared with everyone who works on the job. Removing friable asbestos takes a notice to the agency first.
Old flooring and wall texture are the usual suspect materials in a kitchen or a bathroom. We look for them at the first visit, so the testing is part of the plan and not a surprise on demolition day. For what else older houses hide, see whole-home remodeling.
Questions
Issaquah remodeling questions, answered
01Do I need a permit to remodel a kitchen or bathroom in Issaquah?
For most real remodels, yes. Painting and similar finish work need no building permit, but interior work beyond that goes under the city's Single Family Residential Remodel permit, applied for online at MyBuildingPermit.com. New wiring needs a separate electrical permit from the Washington State Department of Labor & Industries. If you are unsure, the city's Permit Center is at 425-837-3100.
02How do I apply for a building permit in Issaquah?
Online. Issaquah takes permit applications through MyBuildingPermit.com and does not accept paper applications or plans. Drawings are uploaded as PDF files and reviewed on screen, and you can follow the review from your MyBuildingPermit account. When we build your project, we prepare and file the application.
03Who issues electrical permits in Issaquah?
The Washington State Department of Labor & Industries, not the city. L&I reviews and issues electrical permits for work in Issaquah and inspects it. The permit is bought by whoever does the wiring, which on a remodel is the electrical contractor.
04What is the sales tax on a remodel in Issaquah?
10.5% for October 1 to December 31, 2026, collected on the total contract price, labor included. On a $100,000 remodel that is $10,500. The state lists 9.1% for the part of Issaquah outside the regional transit district. The state can change local rates each quarter.
05How much does a kitchen remodel cost in Issaquah?
Remodeling magazine's Cost vs. Value report has no separate table for Issaquah, so its Seattle figures are the nearest published benchmark: in the 2025 edition, $95,542 for a midrange major kitchen remodel and $32,271 for a minor one. Typical full kitchen remodels in the Seattle area land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls starts around $150,000. Sales tax of 10.5% is added to the contract price.
06Can I build an ADU or a backyard cottage in Issaquah?
Yes. Issaquah's code allows two accessory dwelling units with a single-family house, attached, detached or one of each, and each can be up to 1,000 square feet. State law does not let a city require the owner to live on the property. Issaquah also lets a Washington-licensed architect certify the building plans for a detached unit, which is meant to shorten plan review.
07I live in Issaquah Highlands. Do I need the community association's approval too?
Possibly. The Issaquah Highlands Community Association says owners may need approval from its Architectural Review Committee for changes to a home's exterior, fencing and yard. The committee meets on the first Tuesday of each month and takes applications up to seven days before the meeting. That is a separate step from the city permit.
08How do I check that a remodeling contractor is registered in Washington?
Look the business up on the Department of Labor & Industries contractor search before you sign anything. A general contractor in Washington must be registered with the state and carry a $30,000 bond and liability insurance. Giant Builders Seattle is registered as GIANTBS782RZ, and anyone can open the record.
Giant Builders in Issaquah
Remodeling services in Issaquah
Giant Builders Seattle is a licensed general contractor based in Seattle, and Issaquah is part of the area we work in. One contract covers the drawings, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See finished rooms on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Plan your project
Calculators and Seattle-area guides
Calculators and tools
- Remodel cost calculatorA price range for a kitchen, bathroom or basement in two minutes.
- ADU cost calculatorBudget a backyard cottage, a garage conversion or a basement unit.
- Permit navigatorWhich permits a project like yours usually needs.
- Energy rebate calculatorUtility rebates that can go with a remodel.
Seattle cost guides
Seattle permit guides
Free estimate
Planning a remodel in Issaquah?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Sources
- 01City of Issaquah: Do I need a permit? (read Nov 18, 2026)
- 02City of Issaquah: Remodel permits for houses and duplexes (read Nov 18, 2026)
- 03City of Issaquah: Permit process overview (read Nov 18, 2026)
- 04City of Issaquah: Electrical permits (read Nov 18, 2026)
- 05MyBuildingPermit: the member cities (read Nov 18, 2026)
- 06Issaquah Land Use Code 18.500.090: accessory dwelling unit standards (read Nov 18, 2026)
- 07City of Issaquah: Detached accessory dwelling unit (DADU) program (read Nov 18, 2026)
- 08Issaquah Highlands Community Association: Make home and landscape changes (read Nov 18, 2026)
- 09Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 10Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 11Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 12Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 13Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 14Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 15Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)
- 16Revised Code of Washington 36.70A.681: accessory dwelling units, limits on local rules (read Nov 18, 2026)
- 17Revised Code of Washington 36.70A.680: accessory dwelling units, when cities must comply (read Nov 18, 2026)
- 18Revised Code of Washington 36.70A.130: comprehensive plan update deadlines (read Nov 18, 2026)
- 19Washington Dept. of Labor & Industries: cities that issue their own electrical permits (read Nov 18, 2026)
- 20Washington Dept. of Labor & Industries: electrical permit basics (read Nov 18, 2026)
- 21U.S. Environmental Protection Agency: Lead Renovation, Repair and Painting program (read Nov 18, 2026)
- 22King County: sewer capacity charge, 2026 rates (read Nov 18, 2026)