Home additions · Seattle & the Eastside
Home additions in Seattle
More room on the lot you already own, designed, permitted and built by one licensed contractor. Here are the kinds of addition, what Seattle's 2026 zoning allows, what each costs and how the work runs.

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
Types of addition
The kinds of addition, and when each one fits
An addition is a small new building joined to an old one: foundation, framing, roof, siding and every trade inside. Which kind fits depends on your lot as much as on your house.
Bump-out
A few feet added to one room: a kitchen that gains space for an island, a bathroom that gains a shower. It is small in area, but it still needs a foundation, a roof tie-in and a permit.
Ground-level room addition
A family room, a bedroom or a larger kitchen built out into the yard on its own foundation, one story high.
Primary suite
A bedroom, a bathroom and a closet added as one piece, usually at the back of the house or over a new ground-floor room.
Dormer
Headroom and daylight for an upper floor that has sloped ceilings, set into the existing roof without rebuilding it.
Second-story addition
A new floor on top of the house, when the lot has no room to grow outward. The walls and foundation below are checked, and usually strengthened, to carry it.
Tying it into the house
Floors set to the same level, the new roof joined to the old one, siding and windows matched, and heating and wiring extended, so the addition does not look or feel added.
Cost
What a home addition costs in Seattle
Additions cost more per square foot than remodeling, because everything is new, from the footing to the roof. The ranges are typical for Seattle-area homes in 2026.
Level 01
Bump-out or dormer
$60,000 to $150,000
About 6 to 12 weeks on site
A few feet added to one room, a small bathroom addition, or a dormer that gives an upper floor headroom.
- A new foundation or new roof framing for the added space
- Often a subject-to-field-inspection permit
- Finishes matched to the existing room
- Usually built while you live at home
Level 02
Ground-level addition
$180,000 to $400,000
About 3 to 6 months on site
A family room, a bedroom suite or a larger kitchen built out into the yard on its own foundation.
- Foundation, framing, roofing and siding
- Heating, wiring and plumbing extended
- Up to 750 square feet can use the quicker permit
- Lot coverage and setbacks checked first
Level 03
Second-story addition
$400,000 and up
About 6 to 10 months on site
A new floor on top of the house, with the structure below it upgraded to carry the load.
- The roof removed and a new floor framed
- First floor and foundation strengthened
- A new stair, which takes space downstairs
- Full plan review by the city
Ranges reflect published Seattle figures (Remodeling magazine’s 2025 Cost vs. Value report: $82,218 for a midrange bathroom addition and $146,700 upscale; $219,378 for a midrange primary suite addition and $450,561 upscale) and typical local pricing. Sales tax is charged on the full contract in Washington: 10.55% in Seattle. Your written estimate is for your house, not an average. Try the remodel cost calculator.
Zoning
How big an addition Seattle allows
| Rule | Limit | What it means for an addition |
|---|---|---|
| Lot coverage | 50 percent of the lot | The footprints of the house, the addition, other structures, covered areas and decks 36 inches or more above the ground are added together. |
| Height | 32 feet, plus an allowance for a pitched roof | Room for a second story on most houses. 42 feet is allowed in certain cases, such as when a protected Tier 2 tree is kept. |
| Front setback | 15 feet | On a lot with one or two homes. 10 feet on a lot with three or more. |
| Rear setback | 15 feet, or 0 feet at an alley | On a lot with one or two homes. 10 feet on a lot with three or more and no alley. |
| Side setback | 5 feet on average, 3 feet at the least | A side wall may be as close as 3 feet to the property line in places, if the average is 5. |
| Floor area | 0.6 times the lot area and up | The ratio rises with the number of homes on the lot. A lot under 5,000 square feet may have up to 2,500 square feet of floor area whatever the ratio. |
What we check at the first visit
- The zone, the lot size and how much of the lot is already covered
- Setbacks, measured from the property lines
- The foundation and framing the addition will tie into
- Where the sewer line and the power service run
- Trees, slopes and anything else the city protects
Permits
Which permit route a Seattle addition takes
Every addition needs a construction addition or alteration permit from the Seattle Department of Construction and Inspections (SDCI). Small ones can take a quicker route called a subject-to-field-inspection permit, which SDCI screens in a few days. The rest go through full plan review.
What can take the quicker route
- A ground-level, one-story addition of up to 750 square feet.
- A dormer no more than 14 feet wide that adds no more than 200 square feet to a story that is already lived in. It must be set into the existing roof, and its framing plans must be stamped by a licensed civil or structural engineer.
- In a one-story addition, beams and headers up to 14 feet long without an engineer’s stamp.
What needs full plan review
- Second-story and two-story additions.
- Turning an unheated attic into living space.
- Projects with more than 750 square feet of new and replaced hard surface.
- Outside work on a site with an environmentally critical area, such as a steep slope, unless SDCI staff approve it.
- Projects that harm or remove the trees the city protects as Tier 1, 2 or 3.
A second story usually means work on the first. SDCI notes that when you add a second-story addition, the existing house may need structural upgrades to support it. You do not have to bring parts of the house you are not changing up to current code.
Each new bedroom in an addition needs an emergency escape opening. New wiring needs an electrical permit from SDCI, new plumbing needs a permit from Public Health Seattle & King County, and a larger electrical service is arranged with Seattle City Light.
The permit navigator works out the list for your project. Outside Seattle the limits and the offices are different: see the local remodel guides for Bellevue, Kirkland, Redmond and seven more cities.
New meets old
What makes an addition feel like part of the house

The hard part of an addition is the line where new meets old. These are the places we plan before the foundation is poured.
- Floors: the new floor is set to the height of the old one, so there is no step at the doorway.
- Roof: the new roof joins the old one at a matching pitch with proper flashing. That seam is where additions leak when it is done badly.
- Outside: siding, trim and windows are matched to the house, or changed on purpose along a clean line.
- The opening: the old outside wall becomes an opening between rooms, carried by a properly sized beam.
- Heat and power: the heating system and the electrical panel are checked for spare capacity and upgraded if the addition needs more.
Adding space and remodeling the rest at the same time? See whole-home remodeling. For real rooms before and after, see our before and after photos.
Older houses
What older Seattle houses hide when you add on
An addition leans on the house it joins. These are the conditions we look for in the old house and the yard before the design is fixed.
A foundation built for one story
Shallow footings, concrete with no steel in it, brick, or posts on blocks. Before a second story goes on, a licensed engineer checks what the foundation and the first-floor walls can carry, and they are strengthened where needed.
Framing that is a different size
Old studs and joists are not the same dimensions as new lumber, and some old houses are framed with studs that run two stories without a break. Every place where new framing meets old has to be planned.
A full electrical panel
An old, small electrical service with no spare room is common. An addition with a bathroom, a kitchen or its own heat often needs a larger service, which is arranged with Seattle City Light.
Pipes and tanks in the yard
The sewer line, a drain line or an old buried oil tank can sit exactly where the new foundation has to go. We locate them before the design is fixed.
Siding and windows no longer made
Old cedar siding profiles and wood windows may have to be milled or specially ordered to match, and that takes time. The other choice is to change materials on purpose along a clean line.
Asbestos and lead paint
Opening an old outside wall disturbs old siding, paint and insulation. A check for asbestos is required before any renovation, and houses built before 1978 can have lead paint, which Washington's lead rules cover.
Process
How an addition runs
- 01
Visit and measure
A free visit to measure the house and the lot, find the property lines and hear what the new space is for.
- 02
Feasibility and design
We check zoning, lot coverage and setbacks first, then draw the addition and give you a written, itemized price.
- 03
Engineering and permits
A licensed structural engineer designs the beams and footings that need it. We file the permits and order windows and other long-lead items.
- 04
Build
Foundation, framing and roof first, so the new space is weathertight before the wall into the house is opened. Then plumbing, wiring, insulation and finishes.
- 05
Walkthrough
We walk the finished addition with you and close out every item on the list before we call it done.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Home addition questions, answered
01How much does a home addition cost in Seattle?
A bump-out, a small bathroom addition or a dormer typically runs $60,000 to $150,000. A ground-level room or suite addition typically runs $180,000 to $400,000, and a second-story addition starts around $400,000. For reference, Remodeling magazine's 2025 Cost vs. Value report puts a midrange bathroom addition in Seattle at $82,218 and a midrange primary suite addition at $219,378. Washington sales tax applies to the whole contract, labor included: 10.55% in Seattle.
02Is a permit required for an addition in Seattle?
Yes, always. An addition needs a construction addition or alteration permit from the Seattle Department of Construction and Inspections (SDCI). A ground-level, one-story addition of up to 750 square feet, or a dormer up to 14 feet wide that adds no more than 200 square feet, may qualify for the quicker subject-to-field-inspection permit. Second-story and two-story additions go through full plan review. Wiring needs an electrical permit from SDCI, and plumbing needs a permit from Public Health Seattle & King County.
03How big an addition can I build on my lot?
In Seattle's Neighborhood Residential zones, the rules in effect since January 2026 allow structures to cover up to 50 percent of the lot and to rise 32 feet, plus an allowance for a pitched roof. On a lot with one or two homes the front setback is 15 feet, the rear setback is 15 feet (none at an alley) and side setbacks average 5 feet with a 3 foot minimum. There is also a limit on total floor area that depends on lot size and the number of homes. Lots with steep slopes or other protected areas have lower limits. We work this out for your lot before any design is drawn.
04Can my house support a second story?
Often, but rarely without work below. A second story adds weight the original walls and footings were not sized for, and it changes how the house resists wind and earthquakes. A licensed structural engineer checks the foundation, the first-floor walls and the beams, and the plans show what has to be strengthened. The city reviews those plans in full before issuing the permit.
05What is a bump-out?
A bump-out is a small addition that pushes one wall of a room outward by a few feet, without adding a whole new room. It is used to fit an island in a kitchen, a shower in a bathroom or a dining area off a living room. It costs more per square foot than a larger addition, because it still needs a foundation, a roof tie-in, new siding and a permit.
06Is it cheaper to build up or build out?
Usually out, when the lot has room. A ground-level addition needs a foundation and a roof but leaves most of the house alone. Building up keeps the yard and stays inside the lot coverage limit, but the roof comes off, the structure below often has to be strengthened, a stair has to fit downstairs and the permit takes full plan review. On a small lot that is already near its coverage limit, building up may be the only way to add space.
07How long does an addition take?
Plan on 6 to 12 weeks of construction for a bump-out or a dormer, 3 to 6 months for a ground-level addition and 6 to 10 months for a second story. Design, engineering and permits come first. A project that qualifies for the field-inspection permit is screened by the city in a few days. One that needs full plan review takes considerably longer. We give you a schedule before work starts.
08Can we live in the house while the addition is built?
For a ground-level addition or a dormer, usually yes. Most of the work happens outside the existing walls until the day the opening into the house is cut, and we close that area off with dust walls. For a second-story addition, most families move out while the roof is off.
Free estimate
Get a price for your addition
Tell us what you want to add. We come out, measure the house and the lot, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Related
Sources
- 01Seattle SDCI: House additions and remodels (read Nov 18, 2026)
- 02Seattle SDCI Tip 316: Subject-to-field-inspection permits (read Nov 18, 2026)
- 03Seattle SDCI: Construction permit, subject to field inspection (read Nov 18, 2026)
- 04Seattle OPCD: Summary of updated rules in Neighborhood Residential zones (January 2026) (read Nov 18, 2026)
- 05Seattle SDCI Building Connections: New middle housing codes (March 2, 2026) (read Nov 18, 2026)
- 06Seattle Residential Code (2021): section R310.5, escape openings in additions (read Nov 18, 2026)
- 07Seattle SDCI: Electrical permit (read Nov 18, 2026)
- 08Public Health Seattle & King County: plumbing and gas piping permits (read Nov 18, 2026)
- 09Puget Sound Clean Air Agency: asbestos rules for renovation by contractors (read Nov 18, 2026)
- 10U.S. EPA: Lead Renovation, Repair and Painting program (read Nov 18, 2026)
- 11Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 12Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 13Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)