Services · Seattle & the Eastside
Remodeling services in Seattle and the Eastside
Seven kinds of project, from one bathroom to a new backyard cottage, each designed, permitted and built by the same licensed general contractor. Every service has a page of its own with what it includes, what it costs here and which permits it needs.

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
Rooms
Kitchens, bathrooms and basements
Each of these is a single room or a single level of the house, with every trade it needs under one contract.

Kitchen Remodeling
New layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
Typical in Seattle: $30,000 to $150,000 and up
Costs, permits and process
Bathroom Remodeling
Curbless showers, heated floors, tile set to last and plumbing done to code.
Typical in Seattle: $15,000 to $130,000
Costs, permits and process
Basement Finishing
Dry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
Typical in Seattle: $40,000 to $200,000
Costs, permits and process
Larger projects
Whole homes, additions, ADUs and garage conversions
Bigger projects run on the same process, with more of it: zoning to check, structure to design and a longer permit. Seattle changed its rules for additions and accessory dwelling units in 2025 and 2026, and these pages carry the current ones.

Whole-Home Remodeling
Several rooms, or all of them, planned and built as one project.
Typical in Seattle: $150,000 to $700,000 and up
Rules, costs and process
Home Additions
More room on the lot you already own: bump-outs, dormers, second stories.
Typical in Seattle: $60,000 to $400,000 and up
Rules, costs and process
ADU & DADU Builders
Backyard cottages and in-home units under the 2025 and 2026 rules.
Typical in Seattle: $120,000 to $500,000
Rules, costs and process
Garage Conversions
A garage turned into a room, an office or a legal rental unit.
Typical in Seattle: $50,000 to $300,000
Rules, costs and process
The ranges are typical for the Seattle area in 2026 and run from a small project of each kind to a large one. Each service page explains what moves the price and names its sources. The photographs on these four cards are finished interiors, used as illustrations. They are not pictures of an addition, an ADU or a garage conversion.
We also take enquiries for a granny flat for a family member, a patio cover and, on rural land outside the cities, a barndominium. Each page explains the rules that apply and what to expect.
Process
How every project runs
- 01
We come to you
A free visit to see the house, measure, and hear what you want to change. We look at the parts of the house that affect the price while we are there.
- 02
Design and a written price
Drawings, material selections and a written, itemized estimate. You see every line before you sign anything.
- 03
Permits
We prepare the drawings, file with your city and meet the inspectors. Every city in our area has its own office and its own rules.
- 04
The build
One project manager is your contact from start to finish. Dust protection goes up first, and the site is left clean at the end of each day.
- 05
The walkthrough
We go through the finished work with you, room by room, and close out every item on the list.
Before the estimate
What we check before we price
A price is only as good as what it is based on. Before we write an estimate, we look at the parts of the house and the lot that change what a project costs, so they are in the number and not added later.
The estimate you get is written and itemized. If you want a rough range before anyone visits, the remodel cost calculator and the permit navigator will give you one.
- The electrical service, the panel and the age of the wiring
- Supply pipes, drains and where the sewer line runs
- Which walls, beams and posts carry the house
- The foundation, and whether the house is bolted to it
- Signs of water in the basement, under bathrooms and at the roof
- Old materials that have to be tested before demolition
- Zoning: setbacks, lot coverage and how many homes the lot may have
- Which permits the work needs, and from which office
Before and after
The same room, before and after
Giant Builders projects. Pick a room type, pick a project and drag the line.


Drag the line to compare. Each pair is the same room, before and after.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Planning tools
Plan the project before the first visit
Costs, permits and rebates differ from one city to the next. These tools and guides use each city's own rules.
Tools and guides
- Remodel cost calculatorA price range for a kitchen, a bathroom or a basement in your city.
- ADU cost calculatorA budget for a backyard cottage, a garage conversion or a basement unit.
- Permit navigatorWhich permits your project needs, and from which office.
- Local remodel guidesPermit offices, tax rates and rules for ten cities.
Free estimate
Start with a free in-home estimate
Tell us what you are planning. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
