Local remodel guide · King County
Home remodeling in Shoreline, WA
What a Shoreline homeowner needs to know before a kitchen, bathroom or basement remodel: how the city takes applications, how long review is meant to take, the tree rules and fees, what a remodel costs and what the ADU rules allow.
By Giant Builders SeattleUpdated Facts checked Nov 26, 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short version
Remodeling in Shoreline at a glance
The facts a homeowner in Shoreline asks for first. Each one is explained further down, and the sources are at the end of the page.
| Question | Answer |
|---|---|
| Who issues permits | The City of Shoreline's Planning and Community Development department, at the Permit Center in City Hall. |
| Where to apply | Online, on eTRAKiT, the city's permitting portal. Homeowners set up an account there. |
| Electrical permits | From the Washington State Department of Labor & Industries (L&I), not the city. |
| Plumbing and mechanical | Part of the building permit on a remodel, and not deferred to later. A stand-alone residential mechanical or plumbing permit is applied for online and processed in 24 to 48 hours. |
| Review target | 65 calendar days for a building permit decision, counting only the days the city is reviewing. |
| Sales tax | 10.5% on the whole contract, labor included, for October 1 to December 31, 2026. |
| ADUs | Two per lot within the zone's density limit, each up to 1,200 square feet. |
Permits
Who issues remodel permits in Shoreline
Shoreline’s Planning and Community Development department reviews remodel plans, issues the building permit and inspects the work. Applications go in on eTRAKiT, the city’s online permitting portal, where an owner can apply, pay fees, follow the review and schedule inspections once the permit is issued. Homeowners set up an account on the portal; licensed contractors register a professional account so staff can link their license.
The city’s spring 2025 permitting report said the Permit Center would move to electronic-only applications on May 5, 2025, and that it no longer takes cash.
Interior remodels
An interior remodel is applied for on eTRAKiT as the “Residential Interior Remodel Online” permit type. Plumbing and mechanical work is combined with the building permit application and cannot be deferred. Electrical work is permitted separately, by L&I. The city’s FAQ says simple interior work such as replacing cabinets, painting or tiling does not typically need a permit unless it involves plumbing, electrical or gas line work.
Trees
Shoreline protects significant trees under chapter 20.50 of its development code, and the city says few removals are exempt from a permit; the emergency exemption covers only a tree that is an active and imminent hazard. Since 2025, removing a significant tree 24 inches or more in diameter with a permit carries a fee on top of the replacement trees: the council set it at $3,325 plus $100 for each inch over 24 (Resolution 541, March 3, 2025).
The city is rewriting its tree code. Its project page, updated November 10, 2026, shows the draft with the Planning Commission and council adoption planned for winter or spring 2027.
Permit office
City of Shoreline Permit Center
Shoreline City Hall, third floor17500 Midvale Avenue NShoreline, WA 98133Monday, Tuesday and Friday 8 am to 5 pm; Wednesday and Thursday 1 to 5 pm. Intake and payments end at 4 pm. Phone (206) 801-2500, email pcd@shorelinewa.gov.
What needs a permit
Which projects need a permit in Shoreline
| Project | What Shoreline requires |
|---|---|
| Kitchen remodel | An interior remodel permit once the work goes beyond finish work, with the plumbing and mechanical work included in it. Wiring needs an L&I electrical permit. Cabinets, countertops, paint and tile alone do not typically need a permit. |
| Bathroom remodel | A permit when plumbing, electrical or gas lines change. The plumbing is part of the building permit; the wiring needs an L&I permit. |
| Basement finishing | Plan on a building permit: new rooms bring framing, wiring and often plumbing, which go past the finish work the city exempts. Wiring needs an L&I permit. |
| Water heater or furnace | A residential mechanical or plumbing permit, applied for online. The city says no documents are required and the permit is processed within 24 to 48 hours. |
| Trees | Removing a significant tree generally needs a permit. At 24 inches in diameter or more the removal fee applies as well as replacement planting. |
| ADU | A building permit under the ADU rules in SMC 20.40.210. The unit counts toward the number of homes the zone allows on the lot. |
Work that usually needs no building permit in Shoreline
- Painting, papering, tiling and carpeting
- Replacing cabinets and countertops
- Limited siding repair and similar finish work
From the City of Shoreline's interior remodel page and permit FAQ. The city pages we could read give no longer list of exempt work, so ask the Permit Center about anything else. Work that touches plumbing, wiring or gas lines needs a permit.
Not sure where your project falls? The permit navigator asks a few questions and lists the permits a project like yours usually needs.
Timing
How long a permit takes in Shoreline
Shoreline wrote permit review targets into its development code in early 2025, when it updated its rules for the state’s permit timeline law (Senate Bill 5290). A building permit is an administrative decision, with a target of 65 calendar days.
The count starts when the city has found the application complete, and it includes only the days the city is reviewing. It stops while the applicant answers a request for corrections or more information, so the calendar time from application to permit can be longer than 65 days.
The city reports its results. For applications approved in 2024, it said 73% were decided within the target.
| Step or route | Published figure |
|---|---|
| Building permit, including a remodel | 65 calendar days of city review |
| Tree removal permit | 65 calendar days of city review |
| Decision that needs public notice | 100 calendar days of city review |
| Stand-alone residential mechanical or plumbing permit | Processed within 24 to 48 hours |
Cost
What a remodel costs in Shoreline
| Project | Job cost | Recouped at resale |
|---|---|---|
| Minor kitchen remodel, midrange | $32,271 | 118.1% |
| Major kitchen remodel, midrange | $95,542 | 53.1% |
| Major kitchen remodel, upscale | $188,401 | 38.7% |
| Bathroom remodel, midrange | $36,146 | 46.8% |
| Bathroom remodel, upscale | $107,451 | 35.3% |
| Basement remodel | $68,358 | 68% |
No public cost survey breaks out Shoreline on its own, so the Seattle table is the nearest published benchmark. Going by the ranges Seattle-area contractors published in 2026, a kitchen runs $30,000 to $60,000 for a refresh that keeps the layout, $75,000 to $130,000 for a full remodel, and $150,000 and up when walls move.
Sales tax in Shoreline
Washington charges sales tax on the whole remodeling contract, labor included. The combined rate in Shoreline is 10.5% for October 1 to December 31, 2026. On a $100,000 contract, 10.5% is $10,500 of tax. The state can change local rates each quarter, so check the rate again when you sign.
Getting closer to your number
The remodel cost calculator gives a range for your room in a couple of minutes. Our cost guides go line by line: kitchen, bathroom and basement. A written, itemized estimate after a visit is the only price that fits your house.
ADUs and backyard cottages
ADU rules in Shoreline
Shoreline allows two accessory dwelling units on each lot, inside the house (in a basement or above a garage, for example) or detached. The rules are in SMC 20.40.210. The council updated them for the state’s ADU law (House Bill 1337) in Ordinance 1027, adopted on January 13, 2025 with the development code changes for the 2024 comprehensive plan.
ADUs count toward the number of homes the zone allows on the lot, so the zone’s density limit can cap the second one.
Some older city pages still describe one ADU per lot and an owner occupancy rule. State law (RCW 36.70A.681) now bars cities from requiring the owner to live on the lot.
For budgets, try the ADU cost calculator. For the build itself, see ADU and DADU construction.
| Rule | In Shoreline |
|---|---|
| How many | Two per lot, attached or detached, within the zone's density limit (Table 20.50.020(1)) |
| Size | Up to 1,200 square feet. A unit on its own floor under the same roof as the house may be larger |
| Owner occupancy | State law bars a requirement |
| Code | SMC 20.40.210, updated by Ordinance 1027 (January 13, 2025) |
State and regional rules
Rules that apply in Shoreline and across the region
These three come from the state or the regional air agency, not from the city. They apply to every remodel in King County.
Check for asbestos before demolition
The Puget Sound Clean Air Agency covers King, Kitsap, Pierce and Snohomish counties. It requires a check for asbestos before any renovation starts. A certified building inspector must do the survey, except that an owner who lives in a single-family house may survey it personally. Popcorn ceilings, sheet vinyl flooring, old duct and pipe insulation and cement-board siding are among the materials the agency names.
Sales tax covers labor too
For work on a home, the Department of Revenue says sales tax is collected on the total contract price. That means labor, materials and the contractor’s markup, at the rate of the city where the house stands: 10.5% in Shoreline this quarter. Ask every bidder whether the price they quote includes it.
Hire a registered contractor
Washington requires a general contractor to register with the Department of Labor & Industries and to carry a $30,000 bond and liability insurance. Anyone can look a contractor up on the state’s site before signing. Ours is GIANTBS782RZ.
Giant Builders in Shoreline
Remodeling services in Shoreline
Giant Builders Seattle is a licensed general contractor based in Seattle, and Shoreline is part of the area we work in. One company handles the design, the permits and the construction.
- Kitchen RemodelingNew layouts, custom cabinetry, stone counters, lighting and every trade behind the walls.
- Bathroom RemodelingCurbless showers, heated floors, tile set to last and plumbing done to code.
- Basement FinishingDry, warm, legal living space: family rooms, guest suites and rentals with proper egress.
- Whole-Home RemodelingSeveral rooms, or all of them, planned and built as one project.
- Home AdditionsMore room on the lot you already own: bump-outs, dormers, second stories.
- ADU & DADU BuildersBackyard cottages and in-home units under the 2025 and 2026 rules.
- Garage ConversionsA garage turned into a room, an office or a legal rental unit.
On every project
- A free in-home estimate
- A written, itemized price before you sign
- One project manager as your point of contact
- Permits prepared and filed by us
- Dust protection and a clean site each day
- A walkthrough with you at the end
See the rooms themselves on the before and after page.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Shoreline remodeling questions, answered
01Do I need a permit to remodel my kitchen in Shoreline?
Replacing cabinets, painting or tiling does not typically need a permit in Shoreline. Once the work involves plumbing, electrical or gas lines, it does. An interior remodel is applied for online on eTRAKiT, with the plumbing and mechanical work combined into the building permit. The electrical permit comes from L&I.
02Who issues electrical permits in Shoreline?
The Washington State Department of Labor & Industries (L&I), not the city. Shoreline issues the building permit, with plumbing and mechanical work included, through its eTRAKiT portal.
03How long does a remodel permit take in Shoreline?
Shoreline's target for a building permit decision is 65 calendar days, counted from the day the application is found complete and only while the city is reviewing. The clock stops while the applicant answers corrections. A stand-alone residential mechanical or plumbing permit is processed within 24 to 48 hours.
04How do I apply for a remodel permit in Shoreline?
Online, on the city's eTRAKiT portal, after setting up an account. An interior remodel uses the Residential Interior Remodel Online permit type. The Permit Center is on the third floor of City Hall, 17500 Midvale Avenue N, and answers at (206) 801-2500. When you hire us, we prepare and file the application.
05What is the sales tax on a remodel in Shoreline?
10.5% for October 1 to December 31, 2026, charged on the whole contract, labor included. On a $100,000 remodel that is $10,500. The state can change local rates each quarter.
06Can I remove a large tree in Shoreline?
Usually only with a permit: Shoreline's code exempts few removals of significant trees, and the emergency exemption covers only an active and imminent hazard. For a tree 24 inches or more in diameter, the city also charges a removal fee, set in March 2025 at $3,325 plus $100 for each inch over 24, on top of replacement planting. The tree code is being rewritten, with adoption planned for 2027.
07How much does a bathroom remodel cost in Shoreline?
No public cost survey covers Shoreline alone. Remodeling magazine's 2025 Cost vs. Value report for Seattle, next door, puts a midrange bathroom remodel at $36,146 and an upscale one at $107,451. Sales tax of 10.5% is added to the whole contract in Shoreline.
08Can I build an ADU in Shoreline?
Yes. Shoreline allows two ADUs per lot, in the house or detached, each up to 1,200 square feet, within the density the zone allows. The rules were updated for state law in January 2025, and state law bars cities from requiring the owner to live on the lot. Confirm setbacks, height and parking for your lot with the Permit Center.
Free estimate
Planning a remodel in Shoreline?
Tell us what you have in mind. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Guides for nearby cities
Sources
- 01City of Shoreline: eTRAKiT permitting portal (read Nov 26, 2026)
- 02City of Shoreline: Permit Center and remote services (hours) (read Nov 26, 2026)
- 03City of Shoreline: residential interior remodel (read Nov 26, 2026)
- 04City of Shoreline: residential mechanical and plumbing permits (read Nov 26, 2026)
- 05City of Shoreline: frequently asked questions about permits (read Nov 26, 2026)
- 06City of Shoreline: Modern Permitting, first quarter 2025 update (review targets) (read Nov 26, 2026)
- 07City of Shoreline: staff report on Ordinance 1027 (January 13, 2025) (read Nov 26, 2026)
- 08City of Shoreline: staff report on tree removal fees, Resolution 558 (December 15, 2025) (read Nov 26, 2026)
- 09City of Shoreline: tree code update (read Nov 26, 2026)
- 10Shoreline Municipal Code: supplemental use criteria (SMC 20.40.210, accessory dwelling units) (read Nov 26, 2026)
- 11Washington L&I: cities that issue their own electrical permits (Shoreline is not one) (read Nov 26, 2026)
- 12RCW 36.70A.681: accessory dwelling units (state law) (read Nov 26, 2026)
- 13Washington Dept. of Revenue: local sales and use tax rates, October 1 to December 31, 2026 (read Nov 18, 2026)
- 14Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 15Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 16Puget Sound Clean Air Agency: asbestos rules for contractor renovations (read Nov 18, 2026)
- 17Puget Sound Clean Air Agency: asbestos rules for homeowner renovations (read Nov 18, 2026)
- 18Puget Sound Clean Air Agency: the four counties it covers (read Nov 18, 2026)
- 19Washington Dept. of Labor & Industries: registering as a contractor (bond and insurance) (read Nov 18, 2026)