Skip to the content

About the company

About Giant Builders Seattle

We are a general contractor registered with the State of Washington. We remodel kitchens, bathrooms and basements and build additions and backyard cottages in Seattle and on the Eastside. Here is what is on the public record, how a project runs and what you can expect from us.

White kitchen with a waterfall island and four stools, seen across a wood dining table
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

What we do

A remodeling contractor for the house you already live in

Most of our work is inside homes that people are living in: a kitchen taken back to the studs and rebuilt, a bathroom with a new shower and new plumbing behind it, a basement turned into a dry, warm room. We also take on the larger projects: whole-home remodels, additions, garage conversions and backyard cottages.

One company is responsible for the drawings, the permits and the construction, under one contract. You do not hire a designer, then a builder, then stand in line at a permit counter yourself. When a question comes up, you have one number to call.

We work in Seattle, on the Eastside and south to Tacoma. Older houses here often have knob-and-tube wiring, galvanized pipe and basements that were never meant to be lived in. We look for those at the first visit, so the estimate accounts for them.

On the public record

Registered with the State of Washington

Washington registers every construction contractor through the Department of Labor & Industries (L&I), and anyone can look a contractor up. This is what the state has on file for us.

Giant Builders Seattle on the state's record
ItemOn file with the state
RegistrationConstruction contractor, general
License numberGIANTBS782RZ
Registered sinceDecember 2022
UBI number604991679
Read from L&I's record on November 18, 2026. The state's live record is the authority, so check it before you sign with any contractor.

Check us in two minutes

  1. Open our record at L&I, or search for GIANTBS782RZ in the state’s Verify tool.
  2. Confirm that the registration is active and read what the record shows on file.
  3. Read the history on the same page: it lists any lawsuits against the bond and any violations.

Process

How a project runs

  1. 01

    Visit and measure

    A free visit to your home. We measure, look at the wiring, plumbing and structure we can see, and listen to what you want from the space.

  2. 02

    Design and price

    Drawings and material choices, then a written, itemized estimate, so you see what each part of the job costs before you sign.

  3. 03

    Permits

    We prepare the permit drawings, file them with your city or county and meet the inspectors.

  4. 04

    Build

    One project manager is your point of contact. The work area is closed off against dust and the site is cleaned at the end of each day.

  5. 05

    Walkthrough

    We walk the finished work with you, room by room, and go through anything left to put right.

Send a request and we call or email within one business day to set up the visit. The permit step depends on your city: our local remodel guides and the permit navigator show what applies where you live.

What you can expect

Six things we commit to on every project

A free in-home estimate

We come to the house, because a remodel cannot be priced from a photo. The visit costs nothing and commits you to nothing.

A written, itemized estimate

The price is on paper, line by line, so you can see where the money goes and compare it fairly with other bids.

One project manager

One person is your point of contact from the first day of work to the last, and knows what was agreed.

Permits prepared and filed by us

We work out which permits the project needs, prepare the applications and file them.

Dust protection and a clean site

The work area is closed off from the rest of the house with dust barriers, and the site is cleaned up at the end of each day.

A walkthrough at the end

Before the job is closed, we go through the finished work together.

A 5-year workmanship warranty

The work our crews do in your home is covered by our workmanship warranty.

Our work

The same room, before and after

Giant Builders project photos. Pick a room type, pick a project and drag the line.

Kitchen remodel no. 7: after
Kitchen remodel no. 7: before
BeforeAfter

Drag the line to compare. Each pair is the same room, before and after.

Where we work

Seattle, the Eastside and south to Tacoma

We are based in Seattle and take projects across King County, north to Edmonds and Lynnwood and south to Tacoma.

Every city has its own permit office, fees and rules. We keep a plain guide for ten of them, with the permit office, the sales tax rate and the local rules for backyard cottages: Seattle, Bellevue, Kirkland, Redmond, Renton, Issaquah, Kent, Auburn, Federal Way, Tacoma, Shoreline, Mercer Island, Edmonds, Bothell, Woodinville and Sammamish.

  • Seattle
  • Bellevue
  • Kirkland
  • Redmond
  • Mercer Island
  • Renton
  • Issaquah
  • Sammamish
  • Bothell
  • Woodinville
  • Shoreline
  • Lake Forest Park
  • Edmonds
  • Lynnwood
  • Burien
  • Tukwila
  • Kent
  • Auburn
  • Federal Way
  • Tacoma

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

More about our reviews and where to read them

Free estimate

Start with a free in-home estimate

Tell us what you are planning. We come out, measure, and send a written price.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

What are you planning?
When would you like to start?

We use your details to answer you. Nothing else.