Kitchen remodeling · Seattle & the Eastside
Kitchen remodeling in Seattle
A kitchen that fits how you cook, built by one licensed contractor from the first drawing to the final inspection. Here is what goes into it, what it costs in this city and how the work runs.

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
What is included
Every trade a kitchen needs, under one contract.
A kitchen is the most trade-heavy room in a house. Design, carpentry, electrical, plumbing, tile and paint all have to land in the right order. We run all of it.
Layout and design
We start with how you cook and move, then draw the room around it: a wall opened to the dining room, an island where the peninsula was, a galley made to work.
Cabinetry and storage
Framed or frameless, painted or wood, with drawers where you want them. Pantry pull-outs, tray dividers and a place for the bins are designed in, not added later.
Counters and backsplash
Quartz, quartzite, granite or butcher block, templated after the cabinets are set so every seam and overhang is right. Tile set flat and grouted clean.
Lighting and electrical
Recessed, under-cabinet and pendant lighting on separate switches, new circuits for today's appliances, and outlets where code and common sense put them.
Plumbing, gas and ventilation
Sinks moved, old supply lines replaced while the walls are open, gas lines run or capped, and a range hood that actually vents outside.
Floors, trim and paint
Hardwood woven into what is there, tile or plank over a flat subfloor, and the trim and paint that make the new room belong to the old house.
Cost
What a kitchen remodel costs in Seattle
Three sizes of project cover almost every kitchen we are asked about. The ranges are typical for Seattle-area homes in 2026.
Level 01
Refresh
$30,000 to $60,000
About 3 to 6 weeks on site
The layout stays. The surfaces, fixtures and most of what you touch every day are replaced.
- New counters, backsplash, sink and faucet
- Cabinets refaced, painted or partly replaced
- New lighting and appliances in the same places
- Often no building permit; electrical and plumbing permits as needed
Level 02
Full remodel
$75,000 to $130,000
About 8 to 12 weeks on site
The room is taken back to the studs and rebuilt, with the layout improved where it helps.
- All new cabinetry, counters and flooring
- Rewired and replumbed to current code
- Appliances and sink moved within the room
- Building, electrical and plumbing permits
Level 03
Reconfigure
$150,000 and up
About 12 to 20 weeks on site
Walls move. The kitchen grows into the next room, or the back of the house is rebuilt around it.
- Bearing walls opened with a sized beam (an engineer designs the longer spans)
- Custom cabinetry and stone
- New windows or doors to the yard
- A building permit: often the quick STFI permit, plan review for bigger structural work
Ranges reflect published Seattle figures (Remodeling magazine’s 2025 Cost vs. Value report: $32,271 for a midrange minor remodel, $95,542 for a midrange major remodel, $188,401 upscale) and typical local pricing. Sales tax is charged on the full contract in Washington. Your written estimate is for your house, not an average. Try the remodel cost calculator.
Permits
Which permits a Seattle kitchen needs
Seattle’s Department of Construction and Inspections (SDCI) does not ask for a building permit for minor repairs and alterations worth $6,000 or less in any six-month period, or for installing cabinets and new surface finishes over existing walls. Most real remodels go past that.
What triggers what
- Electrical permit (SDCI): new circuits, moved outlets, new lighting.
- Plumbing permit (Public Health Seattle & King County): a moved sink, a pot filler, new gas piping.
- Building permit (SDCI): any change to a bearing wall, the exterior walls, or a window or door opening.
Many kitchens qualify for a subject-to-field-inspection permit, which SDCI screens in a few days instead of sending through full plan review. New beams and headers up to 8 feet long under two stories and a roof, or 14 feet under one story and a roof, can go this route without an engineer’s drawings.
Outside Seattle the offices and fees are different. Our local remodel guides cover Bellevue, Kirkland, Redmond and seven more cities, and the permit navigator works out the list for your project.
What we check at the first visit
- The electrical panel and the age of the wiring
- Supply and drain lines under the sink and in the basement
- Which walls carry load
- Where the range hood vents today
- Floor level and what is under the current flooring
Before and after
Kitchens, before and after
Drag the line across each one.


Drag the line to compare. Each pair is the same room, before and after.
Process
How a kitchen remodel runs
- 01
Visit and measure
A free visit to see the room, measure it and hear what is not working. We look at the panel, the plumbing and the floor structure while we are there.
- 02
Design and price
Drawings, cabinet elevations and material selections, with a written, itemized price for the whole job.
- 03
Permits and orders
We file the permits your project needs and order cabinets and long-lead items, so the crew starts when the materials are close.
- 04
Build
Protection and dust walls first, then demolition, rough-in, inspections, cabinets, counters, tile and finishes, in that order.
- 05
Walkthrough
We walk the finished kitchen with you and close out every item on the list before we call it done.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Kitchen remodeling questions, answered
01How much does a kitchen remodel cost in Seattle?
Most full kitchen remodels in Seattle land between $75,000 and $130,000. A refresh that keeps the layout can be $30,000 to $60,000, and a project that moves walls or adds space starts around $150,000. For reference, Remodeling magazine's 2025 Cost vs. Value report puts a midrange major kitchen remodel in Seattle at $95,542 and a minor one at $32,271. Washington sales tax applies to the whole contract, labor included: 10.55% in Seattle.
02Do I need a permit to remodel my kitchen in Seattle?
Often, yes. Seattle does not require a building permit for minor work worth $6,000 or less in a six-month period, or for installing cabinets and new surface finishes. Moving or adding plumbing needs a plumbing permit from Public Health Seattle & King County, new wiring needs an electrical permit from SDCI, and removing or altering a bearing wall always needs a building permit. Many kitchens qualify for a quicker subject-to-field-inspection permit. We sort out which apply and file them.
03How long does a kitchen remodel take?
Plan on 8 to 12 weeks of construction for a full remodel, less for a refresh and more when walls move. Design, selections and permits come first and usually take 4 to 10 weeks, and custom cabinets can take 6 to 12 weeks to arrive. We give you a schedule before work starts.
04Can we live in the house during the remodel?
Yes, most families do. We close the work area off with dust walls, keep a path through the house clear, and talk through with you where a temporary kitchen can go: most households use the fridge, a microwave and a sink where one is available.
05What surprises come up in older Seattle kitchens?
The common ones are knob-and-tube or ungrounded wiring, galvanized supply pipes, plaster walls, floors that are out of level and range hoods that vent into the attic instead of outside. Asbestos can be in old flooring, wall texture or duct wrap in a house of any age, and Washington law (RCW 49.26.013) calls for a good-faith inspection by an accredited inspector before a remodel that could disturb it. We look at everything that can be seen at the first visit, and the written estimate says what is included and what would change the price.
06What is the most expensive part of a kitchen remodel?
Cabinetry is usually the largest single line, often a third of the budget, followed by labor for the trades, counters and appliances. Moving the sink, the range or a wall adds cost faster than upgrading a finish does.
07What if the project goes over budget?
The price in your contract covers the scope in your contract. If you add something, or we find a hidden condition nobody could have seen, you get the cost in writing and decide before any extra work is done.
08Which areas do you serve?
Seattle and the Eastside, including Bellevue, Kirkland, Redmond, Mercer Island, Renton and Issaquah, and south through Kent, Auburn and Federal Way to Tacoma.
Free estimate
Get a price for your kitchen
Tell us a little about the room. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Related
Sources
- 01Seattle SDCI: Do you need a permit? (read Nov 18, 2026)
- 02Seattle SDCI Tip 316: Subject-to-field-inspection permits (read Nov 18, 2026)
- 03Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 04Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
