The short answer
In Washington, a design-build remodel puts design and construction under one contract with one firm, so the builder prices the work while it is being designed. An architect-first remodel uses separate contracts: an architect or designer draws the project, then contractors bid on the same drawings. State law (RCW 18.08.410) does not require an architect for a house of up to four units, and Seattle says house drawings rarely need a stamp, but a beam longer than the city's span limits needs a structural engineer.
Key points
- 01Design-build means one contract for design and construction; architect first means separate contracts and bids on finished drawings.
- 02Washington does not require an architect to design a house of up to four units, and Seattle says house drawings rarely need a professional stamp.
- 03A structural engineer is needed when a new beam passes Seattle's limits of 8 feet under two stories or 14 feet under one story, or when the inspector asks for engineering.
- 04Architect first is often the better path for a landmark or historic-district house, a steep or slide-prone lot, a large addition, or when you want several bids on identical drawings.
- 05On either path, get the design fee, who owns the drawings and what you owe if you stop after design in writing.
In this article (7 sections)
- 01What is the difference between design-build and hiring an architect first?
- 02How does a design-build remodel work?
- 03How does the architect-first path work?
- 04Do you need an architect to remodel a house in Washington?
- 05When is hiring an architect first the better choice?
- 06How do design fees and drawings work on each path?
- 07What should you check whichever path you choose?
What is the difference between design-build and hiring an architect first?
The difference is how many contracts you sign and when the builder joins the project. Washington's Department of Enterprise Services, which manages the state's own construction, defines design-bid-build as a method in which the owner "contracts with separate entities for the design and construction of a project," and design-build as one in which design and construction services "are contracted by a single entity." Those definitions are written for public buildings, but a house remodel follows the same two patterns.
In a design-build remodel you hire one firm. It measures the house, works out the design with you, prices it as the design develops, prepares the permit drawings and builds the project. If the firm uses an outside architect or engineer, that person works for the firm, not for you.
In an architect-first remodel (the traditional design-bid-build path) you hire an architect or a residential designer first. They draw the project to the level of detail you agree on. You then ask several contractors to bid on the same drawings, choose one and sign a separate construction contract.
| Question | Design-build | Architect first |
|---|---|---|
| Contracts you sign | One firm (sometimes a design agreement, then a construction contract) | Two: the designer, then the contractor |
| When you see a construction price | While the design is being drawn | After the drawings are finished and the bids come in |
| How you compare builders | On process, early pricing and references | On bids for identical drawings |
| Who answers when drawings and house disagree | The same firm | Architect and contractor sort it out; the fix may be a change order |
| Schedule | Design, pricing and ordering overlap | Design, bidding and building run one after another |
| Where it can cost you | Less direct price competition on the final design | A design can come in over budget and need redrawing |
How does a design-build remodel work?
One firm takes the project from the first visit to the final walkthrough. A typical order:
- 01
First visit
The firm walks and measures the house, looks at the structure and systems, and hears what you want.
- 02
Design and pricing together
Layouts and selections are drawn and priced in rounds, so you see what each choice costs. Some firms charge for this stage under a design agreement.
- 03
Engineering and permit drawings
The firm prepares the permit drawings and brings in a structural engineer where needed.
- 04
Construction contract
You sign a contract for the finished design, with the price, the payment schedule, the change order process and the state's disclosure statement.
- 05
Build and close out
The same firm builds it, schedules the inspections and walks the finished work with you.
The strength is that the person pricing the job sees the design as it forms, which helps keep it inside the budget in an older house where hidden conditions drive cost. The Department of Enterprise Services says design-build is used to "reduce the delivery schedule by overlapping the design phase and construction phase."
The weakness is that builders do not compete on the same finished plans. You choose the firm before the design exists, so check it carefully first.
How does the architect-first path work?
You hire the designer, the designer draws the project, and the drawings go out to bid. The usual order:
- 01
Hire an architect or designer
Agree in writing on what they will draw, how many design rounds are included, and whether they will visit during construction.
- 02
Design
Rough layouts first, then a chosen scheme, then detailed drawings and selections.
- 03
Permit set and engineering
The permit drawings, with a structural engineer's calculations where required.
- 04
Bids
Washington's Department of Labor & Industries (L&I) advises getting at least three written bids and comparing them carefully. Identical drawings make that comparison fair.
- 05
Construction
You sign with the contractor you choose. If the architect's contract includes it, the architect visits and reviews the work.
The strength is independence: the designer works for you, and price differences between bids show plainly. The weakness is that nobody prices the project until the drawings are done, so a design that bids over budget goes back for changes. A middle route, which Washington's public owners call general contractor/construction manager, brings a builder in during design to price it as it develops; ask your architect whether they work that way.
Do you need an architect to remodel a house in Washington?
Not by law, for a house. Washington's architect licensing law exempts design work and construction documents for "a residential building of up to and including four dwelling units," whatever its size (RCW 18.08.410). The Seattle Department of Construction and Inspections (SDCI) says house drawings "rarely require a professional stamp" and that you may prepare them yourself or hire a professional.
An engineer is a different matter. On Seattle's subject-to-field-inspection (STFI) permit, the city's quicker permit for small projects, a new beam or header in a bearing wall can be built without an engineer's stamp only up to 8 feet long under two stories and a roof, or 14 feet under one story and a roof. Longer spans need plans stamped by a civil or structural engineer, and the inspector may require stamped engineering for joists or rafters that go past the code's span tables (SDCI Tip 316, updated October 29, 2026).
Two more cases bring in a professional. On a steep slope, a slide area or other listed critical areas, SDCI requires a geotechnical report for exterior or foundation work. And a remodel that replaces wall surfaces in more than 60 percent of the house is likely a substantial alteration, which needs engineer-stamped seismic plans, approved Earthquake Home Retrofit plans or proof of a 1985 or later house to stay on the STFI permit. Beams are covered in opening a load-bearing wall.
When is hiring an architect first the better choice?
Architect first is often better when the design is the hard part, when a public board will review it, or when you want builders to compete on identical plans:
- A designated landmark or a house in a historic district. Seattle has designated more than 400 landmarks and has eight historic districts, and a Certificate of Approval must be issued before changes are made to a landmark or to a property in one of those districts. In the Harvard-Belmont district it is required before any building permit for work visible from the street. A designer who has taken drawings before a review board helps.
- A steep, slide-prone or liquefaction-prone lot. Exterior or foundation work there needs a geotechnical report, and Tip 316 says exterior work on a site with an environmentally critical area does not qualify for the STFI permit unless SDCI staff approve it.
- A large addition, a second story or a new layout for most of the house. These go through full plan review, and the design choices drive most of the cost.
- You want several bids on the same plans. If price competition matters most to you, finished drawings let L&I's advice to compare at least three written bids work as intended.
- You want an adviser on your side during construction. An architect hired for construction visits works for you, not for the builder.
- A long-range plan for the whole property, such as a house, an ADU and a garden built in phases over several years.
Design-build usually fits better when the project is a kitchen, bathrooms, a basement or an interior remodel of an existing house; when the budget is fixed and you want each design choice priced as you make it; and when the house is old enough that what is behind the walls will shape the design.
How do design fees and drawings work on each path?
Each firm sets its own terms, so ask about money and ownership before any design starts and get the answers in writing.
- What does the design phase cost, and is it a fixed fee, an hourly rate or part of the construction price?
- If I stop after design, what do I owe, and do I get the drawings?
- Who owns the drawings, and may another contractor build from them?
- Does the design include permit drawings, energy code forms and the structural engineer, or are those extra?
- How many rounds of changes are included?
- On the architect path: are site visits during construction included, and how many?
- On the design-build path: when will the firm give a construction price, and how firm is it?
Read the written estimate the same way on both paths: what is included, what is an allowance and what is left out. The estimate guide shows what to look for.
What should you check whichever path you choose?
The same state checks apply to every builder. A contractor must be registered with L&I, post a $30,000 bond as a general contractor ($15,000 as a specialty contractor), and carry liability insurance of at least $200,000 for public liability plus $50,000 for property damage, or $250,000 combined. A city may not issue a permit for work by a contractor who must register without first checking that the registration is current (RCW 18.27.110).
An architect must hold a Washington license, which the Department of Licensing lets you look up. A residential designer who is not an architect may design a house under the exemption above, so judge that person on references and finished work.
Before work starts on a residential job of $1,000 or more, the contractor must give you the state's disclosure statement (RCW 18.27.114). The questions to ask a contractor cover the rest.
Giant Builders Seattle works as a design-build contractor. The checks in this article apply to it as much as to any firm, and its state registration is listed on the about page.
Questions people also ask
01Is design-build cheaper than hiring an architect?
02Can a residential designer or drafter prepare my permit drawings?
03Can I switch from an architect to a design-build firm partway through?
04Who designs the structure on a design-build project?
05Do historic district rules apply to the inside of my house?
Sources
- 01Washington Dept. of Enterprise Services: Project delivery systems (read Nov 26, 2026)
- 02RCW 18.08.410: exemptions from the architect licensing law (read Nov 26, 2026)
- 03Seattle SDCI: House additions and remodels (read Nov 26, 2026)
- 04Seattle SDCI Tip 316: Subject-to-field-inspection permits (updated Oct. 29, 2026) (read Nov 26, 2026)
- 05Seattle SDCI: Construction permit, addition or alteration (review times, intake, permit life) (read Nov 26, 2026)
- 06Seattle Dept. of Neighborhoods: Landmarks (read Nov 26, 2026)
- 07Seattle Dept. of Neighborhoods: Historic districts (read Nov 26, 2026)
- 08Seattle Dept. of Neighborhoods: Harvard-Belmont Landmark District (Certificate of Approval) (read Nov 26, 2026)
- 09Washington Dept. of Licensing: Architects (read Nov 26, 2026)
- 10Washington L&I: Hiring a contractor (read Nov 26, 2026)
- 11Washington L&I: Register as a contractor (bond and insurance amounts) (read Nov 26, 2026)
- 12RCW 18.27.110: building permits, verification of contractor registration (read Nov 26, 2026)
- 13RCW 18.27.114: disclosure statement to customers (read Nov 26, 2026)
Rules, rates and programs change. This article was checked against the sources above on the dates shown. It is general information for homeowners, not legal, tax or engineering advice for a specific property.