Skip to the content

Garage conversions · Seattle & the Eastside

Garage conversions in Seattle

A garage turned into a room, an office or a legal rental unit, designed, permitted and built by one licensed contractor. Here is what the work involves, what Seattle allows, what each route costs and how it runs.

A garage turned into a studio apartment with a navy kitchen wall, a large window and glass door, and a grey sofa
Illustration
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

What is included

What it takes to turn a garage into a room

A garage gives you a roof and four walls. Everything else that makes a room comfortable to live in has to be added, and in the right order.

The floor

A garage slab slopes toward the door, sits lower than the house floor and has no insulation under it. We level it, insulate over it and bring it up to the height of the house where the two connect.

The door wall

The garage door comes out and the opening is framed in as a wall with windows, a glass door or a new entry, finished outside to match the house.

Insulation and heat

Walls and ceiling insulated to the current energy code, with a ductless heat pump or an extension of the house system for heating and cooling.

Daylight and wiring

New circuits, lighting and outlets, and windows sized for the room. Seattle's code asks for window area of at least 8 percent of the floor area in a room people live in.

Plumbing, if you want it

A bathroom, a laundry or a kitchen means cutting the slab for drains and reaching the sewer line. That is one of the larger costs in a conversion, so we find the line first.

Structure

A garage was built to keep rain off a car. We check the footing under the walls, the framing and the roof, and strengthen what a lived-in room needs.

Two routes

A room for your house, or a legal home of its own

This is the first decision, because it sets the permit, the price and what you can do with the space afterward.

A converted garage as a room and as an accessory dwelling unit (ADU)
QuestionA room of your houseA legal unit (ADU)
What it isA bedroom, an office, a family room or a studio that belongs to the main house.A separate home with its own entrance, kitchen and bathroom.
Renting it as its own homeNot allowed. The city says a unit is not legal unless it has been established through a permit.Allowed. The owner does not have to live on the property.
PermitA construction addition or alteration permit from SDCI. The city decides at screening whether it needs full plan review.A construction addition or alteration permit with full plan review. An ADU never qualifies for the quicker field-inspection permit.
SizeLimited by the zone's floor area and lot coverage rules.Up to 1,000 square feet, or 1,200 with three or more bedrooms.
Parking for itNone.None. No off-street parking is required for an ADU.
Typical cost in Seattle$50,000 to $90,000, or $90,000 to $150,000 with a bathroom.$150,000 to $300,000, plus King County's sewer capacity charge of $46.01 a month for 15 years at the 2026 rate.
SDCI is the Seattle Department of Construction and Inspections. A lot may have up to two ADUs, and they count toward the number of homes the zone allows.

More on the ADU route, with the full rules table, on our ADU and DADU page and in the Seattle ADU rules guide.

What Seattle allows

Seattle's rules for converting a garage

A garage inside today’s setbacks can stay where it is

Many old garages sit on the property line or on the alley, where nothing new could be built today. Seattle’s code lets an accessory structure that existed before July 23, 2023 be converted to a detached accessory dwelling unit even where it does not meet the lot coverage or setback rules. State law requires every city to allow this.

  • The code counts three things as a conversion: keeping the structure as it is, adding to or altering it, and removing it and rebuilding it.
  • Any part that is enlarged or moved has to meet the current standards.
  • The city may waive or adjust other ADU standards to make a conversion work.
  • The finished building has to meet the minimum standards of Seattle’s housing code.

Walls near the property line

The residential code still applies to a converted garage. A wall closer than 5 feet to an interior lot line must be built with a one-hour fire rating; between 3 and 5 feet, openings may take up to a quarter of the wall, and closer than 3 feet none are allowed. Along an alley, the distance is measured to the far side of the alley, which often helps. This often decides which side the windows go on.

Parking

Seattle requires no parking for an accessory dwelling unit. For the homes on a lot, the rules in effect since January 2026 ask for one space for every two homes, round a half space down, and ask for none within a half mile walk of a major transit stop. By that arithmetic a lot with one house needs no parking space, so the garage is usually free to become something else. We confirm it for your lot.

Permits

A conversion needs a construction addition or alteration permit from the Seattle Department of Construction and Inspections (SDCI), an electrical permit from SDCI and, if you add a bathroom or a kitchen, a plumbing permit from Public Health Seattle & King County. The permit navigator works out the list for your project. Other cities have their own rules: see the local remodel guides.

What we check at the first visit

  • The slab: cracks, slope and its height against the house floor
  • The footing under the walls, and rot at the bottom of the framing
  • The distance from each wall to the property line
  • Where the sewer line and the power come from
  • The roof framing and the height inside
  • Whether your lot has to keep a parking space

Cost

What a garage conversion costs in Seattle

The price follows what goes into the space: a dry, warm room costs the least, plumbing adds a step, and a full home adds another. The ranges are typical for Seattle-area garages in 2026.

Level 01

Room, office or studio

$50,000 to $90,000

About 6 to 10 weeks on site

The garage becomes a finished, heated room that belongs to the house. No plumbing.

  • Floor leveled and insulated
  • Door opening framed in, with windows
  • Insulation, heat, wiring and lighting
  • Building and electrical permits

Level 02

Suite with a bathroom

$90,000 to $150,000

About 10 to 14 weeks on site

A bedroom or a guest suite with its own bathroom, still part of the main house.

  • Everything in the room conversion
  • Slab cut for drains and the sewer line reached
  • A bathroom finished to the standard of the house
  • Building, electrical and plumbing permits

Level 03

Legal rental unit (ADU)

$150,000 to $300,000

About 4 to 6 months on site

A complete small home with its own entrance, kitchen and bathroom, permitted as an accessory dwelling unit.

  • Kitchen, bathroom and its own heat
  • Often rebuilt from the slab up
  • Full plan review by the city
  • King County sewer capacity charge applies

No one publishes a Seattle benchmark for garage conversions. These ranges are typical local pricing, set beside the two closest published Seattle figures (Remodeling magazine’s 2025 Cost vs. Value report: $68,358 for a basement remodel and $210,944 for an accessory dwelling unit). Sales tax is charged on the full contract in Washington: 10.55% in Seattle. Your written estimate is for your garage, not an average. Try the ADU cost calculator.

The finished room

What makes a converted garage stop feeling like a garage

An open living room with light wood floors, recessed lights, a wall-mounted television and red leather seating

A conversion that only adds drywall and carpet still feels like a garage: cold at the floor, dark, and a step down from the house. These are the details that change that.

  • The floor: insulated and raised, so it is warm underfoot and level with the house at the door.
  • The old door opening: rebuilt as a real wall, with windows set at the same height as the rest of the house, so the outside does not show where a garage door used to be.
  • Light from two sides: a window or a glass door on a second wall wherever the property line allows it.
  • Heat of its own: a heat source sized for the room, so it is not the coldest room in the house in January.
  • The ceiling: opened up to the roof framing where the structure allows, to give back the height the raised floor takes.

For rooms from Giant Builders projects, see our before and after photos. If the garage is too small or too far gone, a home addition may be the better way to get the same room.

Older garages

What older Seattle garages hide

Garages were built to a lower standard than houses, and many are as old as the house they belong to. These are the conditions we look for, and price for, at the first visit.

A thin slab with no footing

Old garage floors are often a few inches of concrete poured on dirt, cracked and sloped, with the walls resting on the edge. A lived-in building needs real footings under its walls, so some conversions start with concrete work.

Rot at the bottom of the walls

Framing that sits at ground level, with siding that runs down to the soil, has usually rotted along the bottom. It is cut out and rebuilt on a raised concrete curb.

Framing sized for a shed

Thin studs set far apart, no sheathing on the walls and a roof framed lighter than a house roof. We add what is needed for insulation depth, for wind and earthquake bracing and for the roof load.

Walls close to the property line

Many alley garages sit on the property line or within a few feet of it. The residential code measures a wall from the lot line beside it, or from the far side of an alley or street. Under 5 feet, the wall needs fire-rated construction and its openings are limited, so we measure before design.

Power by a single old wire

One old circuit run from the house, sometimes overhead and sometimes buried without conduit. A converted garage gets a properly sized feed from the panel, or a service of its own.

No sewer anywhere near

The sewer line usually leaves the house on another side. Reaching it can mean trenching across the yard and, where the garage sits lower than the line, a pump.

Process

How a garage conversion runs

  1. 01

    Visit and measure

    A free visit to measure the garage, look at the slab, the framing and the roof, and find the property lines, the sewer and the power.

  2. 02

    Room or unit, and a price

    We lay out both routes where both are possible, draw the one you choose and give you a written, itemized price.

  3. 03

    Permits and orders

    We file the permits your project needs and order windows, doors and other long-lead items.

  4. 04

    Build

    Concrete and framing repairs first, then the door wall and windows, plumbing and wiring, inspections, insulation, drywall and finishes.

  5. 05

    Walkthrough

    We walk the finished space with you and close out every item on the list before we call it done.

Reviews

What homeowners have said

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Garage conversion questions, answered

01

How much does a garage conversion cost in Seattle?

Turning a garage into a finished room, office or studio typically runs $50,000 to $90,000. Adding a bathroom brings it to $90,000 to $150,000, and converting the garage into a legal rental unit with a kitchen and bathroom typically runs $150,000 to $300,000. No one publishes a Seattle benchmark for garage conversions. The closest published figures are in Remodeling magazine's 2025 Cost vs. Value report: $68,358 for a basement remodel and $210,944 for an accessory dwelling unit. Washington sales tax applies to the whole contract, labor included: 10.55% in Seattle.

02

Do I need a permit to convert my garage in Seattle?

Yes. A conversion changes the structure and the outside walls of the building, so it needs a construction addition or alteration permit from the Seattle Department of Construction and Inspections (SDCI). New wiring needs an electrical permit from SDCI, and a bathroom or kitchen needs a plumbing permit from Public Health Seattle & King County. If the garage becomes an accessory dwelling unit, the plans go through full plan review. We file all of them.

03

Can I turn my garage into an ADU and rent it out?

In Seattle, yes. A lot may have up to two accessory dwelling units, the owner does not have to live on the property, and the unit does not need a parking space. The unit can be up to 1,000 square feet, or 1,200 with three or more bedrooms, and it needs its own kitchen and bathroom. A garage that is used as a home without a permit is not a legal unit, so the permit matters if you plan to rent it.

04

My garage sits on the property line. Can it still be converted?

Usually, yes. Seattle's code lets an accessory structure that existed before July 23, 2023 be converted to a detached accessory dwelling unit even where it does not meet today's lot coverage or setback rules, and state law requires cities to allow this. The building code still applies: a wall closer than 5 feet to an interior lot line must be fire-rated, with openings limited to a quarter of the wall between 3 and 5 feet and none closer than 3 feet. Along an alley, the distance is measured to the far side of the alley. Any part of the building you enlarge or move has to meet the current rules.

05

Do I have to replace the parking when I convert the garage?

On most lots, no. Seattle requires no parking for an accessory dwelling unit. For the homes on a lot, the rules in effect since January 2026 ask for one space for every two homes, round a half space down, and ask for none within a half mile walk of a major transit stop. By that arithmetic a lot with one house needs no parking space. We confirm it for your lot before design starts.

06

Should I convert the garage or tear it down and build new?

It depends on the slab, the framing and where the garage sits. If it stands inside today's setbacks, its location is worth keeping. The code counts removing a structure and rebuilding it in the same place as a conversion, so you can keep the spot even when little of the old building is worth saving. If the garage stands where a new building could go anyway, a new cottage is sometimes the better building for similar money. We look at both.

07

How long does a garage conversion take?

Plan on 6 to 10 weeks of construction for a room, 10 to 14 weeks with a bathroom and 4 to 6 months for a legal rental unit. Design and permits come first. An accessory dwelling unit goes through full plan review, which takes longer than the permit for a simple room. We give you a schedule before work starts.

08

Can I keep part of the garage for storage?

Yes. A common layout keeps a storage bay at the door end, behind the existing garage door or a smaller one, and converts the rest. The wall between the two is insulated and sealed like an outside wall, so the room stays warm and free of fumes.

Free estimate

Get a price for your garage

Tell us what you want the garage to become. We come out, measure, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

When would you like to start?

We use your details to answer you. Nothing else.