Permit guides · Seattle
Seattle remodeling permits, explained
Three guides that answer the permit questions homeowners search for, room by room. Each one quotes the code section or the city page behind every rule, and prices the permits from the 2026 fee schedules.
By Giant Builders SeattleUpdated Rules checked against city sources in November 2026
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
- Permit guide
Kitchen remodel permits in Seattle
What needs no permit, what the $6,000 rule really covers, the quick field-inspection permit, and which agency issues which permit.
Cabinets and finishes: no building permit - Permit guide
Bathroom remodel permits in Seattle
When a bathroom needs a building permit, why the plumbing permit comes from Public Health and not the city, and what each one costs.
Plumbing permit: $137 plus $27 a fixture - Permit guide
Basement finishing permits in Seattle
The permit a basement needs, the ceiling height the code accepts in an existing house, and when a bedroom needs an escape window.
Ceiling in an existing basement: 6 ft 8 in
In one table
Who issues which permit in Seattle
| Permit | Issued by | 2026 fee |
|---|---|---|
| Building permit, field-inspection route | Seattle Department of Construction and Inspections (SDCI) | Set from the value of the work: $1,611.86 at $50,000, $2,677.61 at $100,000 |
| Building permit, full plan review | SDCI | $2,302.65 at $50,000, $3,825.15 at $100,000 |
| Electrical permit | SDCI | $55.48 plus $26.28 per circuit up to 25 amps, plus 5% |
| Plumbing permit | Public Health Seattle & King County | $137 plus $27 per fixture |
| Gas piping permit | Public Health Seattle & King County | $137 plus $27 per outlet |
Three things that are true of every Seattle remodel
- Minor alterations worth $6,000 or less in six months, cabinets, paint and new finishes over existing walls need no building permit. Work on load-bearing supports or the outside walls always does.
- The building permit never covers the wiring or the plumbing. Those are separate permits, and the plumbing one comes from the county health department.
- Most kitchens, bathrooms and basements qualify for the quick field-inspection permit, which the city says it screens in a few days.
These guides cover Seattle. Other cities have their own exemptions, offices and fees.
Get the permit list for your project
The permit navigator asks what you are changing and where you live, and returns the permits that apply, for Seattle and for the cities around it.
