ADU rules · Seattle and the Eastside
ADU and DADU rules, city by city
A 2023 state law made every city here rewrite its rules for accessory dwelling units, and each did it differently. These five guides follow the ordinance each council adopted, with the size, parking and ownership rules side by side.
By Giant Builders SeattleUpdated Rules checked against city sources in November 2026
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
- ADU rules
Seattle ADU and DADU rules
The code as amended in 2025 and 2026, section by section: how many, how big, parking, sale, density, and why the city's 2023 tip sheets are wrong.
Two per lot, 1,000 or 1,200 sq ft - ADU rules
Bellevue ADU rules
Bellevue has allowed backyard cottages since 2025. The size cap, the 24-foot height limit, the parking test and the rental rule.
Two per lot, 1,200 sq ft - ADU rules
Kirkland ADU rules
Two units up to 1,200 square feet, separate ownership allowed, and a parking rule that depends on transit and on how many units you build.
Two per house, 1,200 sq ft - ADU rules
Redmond ADU rules
Two ADUs or tiny homes per lot, a 1,000 square foot cap with two ways to exceed it, no required parking, and sprinklers in a detached unit.
Two per lot, 1,000 sq ft - ADU rules
King County ADU rules
For addresses outside any city: two units in the urban area and one in the rural area, the heated and unheated floor area limits, and the county's fees.
Urban: two per lot. Rural: one
Side by side
The main rules in each place
| Place | Units per lot | Size limit | Parking | Detached height | Sales tax, October to December 2026 |
|---|---|---|---|---|---|
| Seattle | 2 | 1,000 sq ft, or 1,200 with three or more bedrooms | None | The zone's limit for a house: 32 ft in Neighborhood Residential zones | 10.55% |
| Bellevue | 2 | 1,200 sq ft | One space only for a unit of 1,000 sq ft or more that is over half a mile from a major transit stop | 24 ft | 10.3% |
| Kirkland | 2 per house | 1,200 sq ft | None within half a mile of a major transit stop. Farther out, one space on a lot with two units, with exceptions | The zone's limit for a house | 10.4% |
| Redmond | 2, ADUs or tiny homes | 1,000 sq ft | None | The zone's limit | 10.4% |
| Unincorporated King County | 2 in the urban area, 1 in the rural area | 1,000 sq ft heated plus 1,000 unheated | None added | The zone's base height | 10.3%, or 8.9% outside the transit district |
See what an ADU would cost
The ADU cost calculator takes the type of unit, its size and your city and returns a budget range with the sales tax and the capacity charge shown.
Related
- ADU and DADU cost in SeattleCost by type of unit, with tax, fees and the county charge.
- ADU and DADU buildersHow a cottage or an in-home unit gets planned, permitted and built.
- Garage conversionsA garage turned into a room or a legal rental unit.
- Permit guidesWhat needs a permit in Seattle, and what it costs.
