Permit guide · Seattle
Do you need a permit to remodel a bathroom in Seattle?
A bathroom is small, but it is the one room where three permits from two agencies usually meet. Here is what each one covers, what is exempt, the code rules an inspector checks, and the 2026 fees.
By Giant Builders SeattleUpdated Rules checked against city sources in November 2026

- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
For most bathroom remodels, yes. Any change to the plumbing needs a permit from Public Health Seattle & King County, not from the city; new wiring needs a city electrical permit; and taking the room back to the studs or moving a wall needs a building permit, usually the quick field-inspection kind.
- Plumbing permit from Public Health, plus the second figure per fixture
- $137 + $27
- Smallest switched exhaust fan the code accepts, ducted outside
- 50 cfm
- Bathroom ceiling height. 6 ft 4 in in an existing basement
- 6 ft 8 in
- The city's screening time for a field-inspection permit
- A few days
What triggers what
Which permit each kind of bathroom work needs
| Work | Building permit (SDCI) | Plumbing permit (Public Health) | Electrical permit (SDCI) |
|---|---|---|---|
| Paint, a new vanity cabinet, new finishes over the existing walls | No | No, if no plumbing is changed | No |
| Tub-to-shower conversion, room otherwise kept | Only if walls are rebuilt in a job over $6,000 | Yes | If a fan, light or outlet is added |
| Full remodel to the studs, fixtures in the same places | Yes, field-inspection route | Yes | Yes |
| New layout: fixtures moved, a wall moved or removed | Yes. Field-inspection route if any new beam is within the span limits or engineered | Yes, one fee per fixture | Yes |
| A new or resized window | Yes: it changes the building envelope | No | No |
| A new bathroom inside the house | Yes, field-inspection route | Yes | Yes |
| A bathroom addition | Yes. Field-inspection route for one story at ground level up to 750 sq ft; full review for a second story | Yes | Yes |
Two agencies
Why the plumbing permit does not come from the city
Seattle splits its permits in a way that surprises people who have remodeled elsewhere. The Seattle Department of Construction and Inspections (SDCI) issues the building permit and the electrical permit. Plumbing and gas piping permits are issued, and inspected, by Public Health Seattle & King County, which does this for Seattle and for unincorporated King County.
What that means on a bathroom
- There are two applications, in two online systems: the Seattle Services Portal and the Public Health Permit Center.
- There are two sets of inspections. The city’s building inspector does not sign off the plumbing, and the plumbing inspector does not look at the framing.
- The walls stay open until both the plumbing and the electrical rough-in have passed.
The plumbing rule is broad
Public Health requires a permit “whenever you are going to install, relocate, or change a plumbing or gas piping system”. On a bathroom that covers a moved toilet, a new shower valve, a tub replaced by a shower and a second sink. The 2026 fee is $137 plus $27 per fixture, and a repeated inspection costs $137.
The building permit follows the walls
The city exempts painting and new surface finishes over existing walls and ceilings, and minor alterations worth $6,000 or less in six months. A full bathroom remodel passes that value quickly and replaces the wall board, not only the finish, so it needs a building permit. Most qualify for the subject-to-field-inspection permit, which the city screens in a few days.
Outside Seattle
In Bellevue, Kirkland, Redmond and the other cities, the city’s own building department issues the plumbing permit along with the rest. Our local remodel guides name each permit office.
What the inspector checks
The code rules that shape a Seattle bathroom
| Rule | What the code asks for | Where it is |
|---|---|---|
| Fixtures | Every home must have a toilet, a sink and a bathtub or shower. A tub can become a shower; the only bathing fixture cannot be removed. | SRC R306.1 |
| Exhaust fan | A local exhaust fan in every bathroom and toilet room: at least 50 cfm on a switch or 20 cfm running all the time, with the duct ending outside. | Seattle Residential Code, Table M1505.4.4.1 |
| Ceiling height | 6 ft 8 in in bathrooms, toilet rooms and laundry rooms, and 6 ft 8 in over a 30 by 30 inch area at a showerhead. In a bathroom created in the basement of an existing house, 6 ft 4 in. | SRC R305.1 and R4404.6 |
| Glass near water | Glass in a wall around or beside a tub or shower must be safety glazing when its bottom edge is less than 60 inches above the standing surface, unless it is more than 60 inches from the water's edge. | SRC R308.4.5 |
| Smoke alarms | When an alteration needs a building permit, the home must have smoke alarms where a new home would. Battery alarms are accepted. | SRC R314.2.2 |
| Carbon monoxide alarms | Required in existing homes, outside each sleeping area and on each level. Checked when permitted work is inspected. | SRC R315.2 |
Before demolition in an older house
Old sheet flooring, its adhesive and wall texture can contain asbestos. The Puget Sound Clean Air Agency requires a check for asbestos before any renovation: a survey by a certified building inspector, unless the owner lives in the house and does the survey personally, with a copy kept at the site. In a house built before 1978, Washington's lead rules require a certified firm and lead-safe work practices when painted surfaces are disturbed.
A worked example
The permits on one bathroom, added up
Worked example, not a real job
Example: a primary bathroom with a new layout
A typical primary bathroom remodel valued at $95,000, inside the usual Seattle range of $75,000 to $130,000: every fixture moved, a wall that carries no load taken out, a tiled shower, a freestanding tub, two sinks and a heated floor. Every fee is computed from the 2026 schedules.
| Line | How it is worked out | Amount |
|---|---|---|
| Construction contract | The example figure the fees are based on. | $95,000 |
| Sales tax | 10.55% of the contract price (Seattle, October to December 2026). | $10,022.50 |
| Building permit (SDCI) | Field-inspection route: permit fee $1,751.50, plan review fee $700.60, technology fee $122.61. | $2,574.71 |
| Electrical permit (SDCI) | $55.48 administrative fee and 4 circuits up to 25 amps at $26.28, plus the 5% technology fee. | $168.63 |
| Plumbing permit (Public Health) | $137 plus $27 for each of 5 fixtures: shower, tub, toilet and two sinks. | $272 |
| Total with tax and permits | $108,037.84 | |
Get the permit list for your bathroom
The permit navigator asks what you are changing and where you live, and returns the permits that apply, for Seattle and for the cities around it.
Questions
Bathroom permit questions, answered
01Do I need a permit to remodel a bathroom in Seattle?
For most bathroom remodels, yes. Any change to the plumbing needs a plumbing permit from Public Health Seattle & King County, and new or changed wiring needs an electrical permit from the city. A building permit is needed when the job is more than new finishes: taking walls back to the studs in a job over $6,000, moving a wall, or changing a window. Painting and new surface finishes over the existing walls need no building permit.
02Do I need a permit for a tub-to-shower conversion in Seattle?
Yes, a plumbing permit. The drain and the valve change, and Public Health requires a permit whenever a plumbing system is installed, relocated or changed. In 2026 it costs $137 plus $27 per fixture. A building permit is added when the walls around the tub are rebuilt as part of a job worth more than $6,000, and an electrical permit when a fan, a light or an outlet is added.
03Who issues plumbing permits in Seattle?
Public Health Seattle & King County, not the Seattle Department of Construction and Inspections. Public Health issues plumbing and gas piping permits and does the inspections in Seattle and in unincorporated King County. In Bellevue, Kirkland, Redmond and other cities, the city's own building department issues them.
04Do I need a permit to replace a toilet, a faucet or a vanity?
A new vanity cabinet and new finishes need no building permit. For the plumbing, Public Health's rule is broad: a permit whenever you install, relocate or change a plumbing system. Its permit page does not list an exception for swapping one fixture for another in the same place, so ask Public Health before assuming a like-for-like replacement is exempt.
05How much do bathroom remodel permits cost in Seattle?
Take a primary bathroom with a new layout, valued at $95,000, on the field-inspection route. In 2026 its permits come to about $3,020: $2,574.71 for the building permit and its plan review, $168.63 for an electrical permit with 4 circuits, and $272 for a plumbing permit with 5 fixtures. A failed plumbing inspection that has to be repeated costs $137.
06Does a bathroom need an exhaust fan in Seattle?
Yes. The city's summary of the residential code says local exhaust fans are required in bathrooms and toilet rooms, moving at least 50 cubic feet a minute when they run on a switch or 20 when they run all the time, and that exhaust ducts must end outside the building. A fan that empties into the attic does not meet it. Wiring a new fan needs an electrical permit.
07Can I do the plumbing in my own bathroom?
Yes, in a house you own. Public Health says a plumbing permit issued to a homeowner authorizes the homeowner to do the plumbing, and the work is inspected like any other. A plumber you hire must be a registered contractor. The city applies the same idea to electrical work: owners may do their own in a home they own and live in.
08What permits does a new bathroom in the basement need?
A building permit for the new room, a plumbing permit for the fixtures and the drains cut into the slab, and an electrical permit. The ceiling may be as low as 6 feet 4 inches in a bathroom created in the basement of an existing house. The basement permit guide covers the rest.
Free estimate
We prepare and file the permits
Tell us what you want to change. We apply to the city and to Public Health, schedule both sets of inspections and keep the walls open until they pass.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Keep reading
- Bathroom remodelingWhat is included and how a bathroom remodel runs.
- Bathroom remodel cost in SeattleRanges by scope, with tax and permits added.
- Kitchen remodel permits in SeattleThe exemptions and the field-inspection permit in detail.
- Basement finishing permits in SeattleAdding a bathroom downstairs.
Sources
- 01Seattle SDCI: Do you need a permit? (read Nov 18, 2026)
- 022021 Seattle Residential Code, chapter 1: section R105.2, work exempt from permit (read Nov 18, 2026)
- 03Seattle SDCI: Construction permit, subject to field inspection (read Nov 18, 2026)
- 04Seattle SDCI: Subject-to-field-inspection criteria, infographic (read Nov 18, 2026)
- 05Seattle SDCI Tip 316: Subject-to-field-inspection permits (updated Oct. 29, 2026) (read Nov 18, 2026)
- 06Seattle SDCI: 2026 Fee Subtitle (effective Jan. 1, 2026) (read Nov 18, 2026)
- 07Seattle SDCI: Electrical permit (read Nov 18, 2026)
- 08Seattle SDCI Tip 104: Getting an over-the-counter permit (dated July 25, 2022) (read Nov 18, 2026)
- 09Public Health Seattle & King County: plumbing and gas piping permits (read Nov 18, 2026)
- 10Public Health Seattle & King County: plumbing and gas piping fees (effective Jan. 1, 2026) (read Nov 18, 2026)
- 112021 Seattle Residential Code, chapter 3: sections R303 to R315 (light, room size, ceiling height, escape openings, alarms) (read Nov 18, 2026)
- 122021 Seattle Residential Code, chapter 44: existing buildings (section R4404.6, ceiling height) (read Nov 18, 2026)
- 13Seattle SDCI Tip 303A: Common Seattle Residential Code requirements (dated Dec. 8, 2021) (read Nov 18, 2026)
- 14Puget Sound Clean Air Agency: asbestos rules for renovation (read Nov 18, 2026)
- 15U.S. EPA: Lead Renovation, Repair and Painting program (read Nov 18, 2026)
- 16Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)
