ADU rules · Seattle
Seattle ADU and DADU rules in 2026
The city rewrote its accessory dwelling unit rules twice in under a year, and much of what is online, including the city's own tip sheets, still describes the old ones. This page follows the code as it stands, subsection by subsection.
By Giant Builders SeattleUpdated Rules checked against city sources in November 2026
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
A Seattle lot may have up to two accessory dwelling units, attached, detached or stacked, each up to 1,000 square feet, or 1,200 square feet with three or more bedrooms. No parking and no owner occupancy is required, a unit may be sold as a condominium but not split off by subdivision, and since January 2026 the units count toward the number of homes the lot may hold.
- Accessory dwelling units allowed on a lot
- 2
- Size limit: up to two bedrooms, or three and more
- 1,000 / 1,200 sq ft
- Parking spaces required
- 0
- The day the current version took effect
- Jan. 21, 2026
The code
Seattle's ADU rules, subsection by subsection
Seattle Municipal Code 23.42.022 holds the rules for every zone. It was added by Ordinance 127211 in 2025 and rewritten by Ordinance 127376, which took effect on January 21, 2026. The letters below are from the current version.
| Rule | What the code says | Where |
|---|---|---|
| Where they are allowed | As a housing use in every zone where housing uses are allowed. In the Shoreline District, chapter 23.60A also applies. | 23.42.022.A |
| How many | No lot may have more than two accessory dwelling units. | 23.42.022.C |
| What kind | Attached, detached or stacked, on the same lot as the principal home. | 23.42.022.D and F |
| Size | 1,000 sq ft of gross floor area with up to two bedrooms. 1,200 sq ft with three or more bedrooms. | 23.42.022.G.1 |
| Not counted in the size | Up to 250 sq ft of attached garage, stories or parts of stories that are underground, and up to 35 sq ft of long-term bicycle parking. | 23.42.022.G.2 |
| Converting a garage or shed | An accessory structure that existed before July 23, 2023 may become a detached unit despite lot coverage, yard and setback rules. Conversion includes removing the structure and rebuilding it. | 23.42.022.H |
| A larger unit in the house | An attached unit may exceed 1,000 sq ft if the part of the house it occupies existed on July 23, 2023. | 23.42.022.H.4 |
| Height and setbacks | The same standards as a principal home, unless the zone says otherwise. In Neighborhood Residential zones: 32 ft of height, and a rear setback of 5 ft for an accessory unit, or none where the lot line is on an alley. | 23.42.022.E; city summary of 23.44 |
| Parking | No off-street motor vehicle parking is required. | 23.42.022.I |
| Density | Accessory units and principal units are counted together. | 23.42.022.J |
| Sale | The land use code may not be used to prohibit the sale of a condominium unit because it was built as an accessory dwelling unit. | 23.42.022.K |
| Subdivision | An accessory dwelling unit may not be separated from the principal unit through subdivision. | City summary, January 2026 |
| Owner occupancy | No requirement appears in the section, and state law does not allow one. | RCW 36.70A.681 |
What changed
Two rewrites in under a year
2023: the state sets the floor
House Bill 1337, now RCW 36.70A.681, told cities what they may no longer do, from requiring the owner to live on the lot to capping a unit below 1,000 square feet. The last question on this page lists its terms.
June 30, 2025: Ordinance 127211
Seattle repealed its old ADU section, 23.44.041, and put one set of rules for all zones in a new section, 23.42.022. Two units in any mix, including two detached ones, a 1,000 square foot limit everywhere, no parking, and the condominium protection. In that version, an ADU in a Neighborhood Residential zone did not count against the floor area limit.
January 21, 2026: Ordinance 127376
The permanent middle housing law rewrote the section again. It added the 1,200 square foot size for units with three or more bedrooms. It also ended the special treatment: accessory units now count toward density, and the city’s summary says they count toward the floor area ratio and lot coverage too. The separate ADU rules on height and rear-yard placement moved into the zone’s own standards.
Still moving
On October 26, 2026 the planning office released draft “clean up” legislation for the Neighborhood Residential zones and said it plans to send it to the City Council in late 2026. Check the date on anything you read, this page included.
What the 2023 tip sheets still say, and no longer applies
- A lot must be at least 3,200 square feet for a detached unit.
- A second ADU is allowed only if it meets a green building standard or is rent-restricted.
- Two detached units on one lot are not among the listed options.
- Units in Lowrise zones are limited to 650 square feet.
The tips’ notes on the King County capacity charge and on plumbing and electrical permits still match the agencies’ current pages.
Density and floor area
What it means that an ADU now counts
Under the 2026 rules, a Neighborhood Residential lot may hold the greater of four homes, six homes if it is within a quarter mile of a major transit stop or at least two homes are affordable, or one home per 1,250 square feet of lot. Principal homes and accessory units are counted together, and no more than two of them may be ADUs.
The floor area limit works the same way. The more homes on the lot, the more total floor area the code allows, and the ADU’s floor area is part of the total. On lots with one or two homes the front setback is 15 feet; with three or more it is 10 feet. Buildings may cover half the lot.
So the real question for most lots is no longer “may I add a cottage?” It is whether the house you have, plus the unit you want, fits the floor area and coverage the lot is allowed. For a large house on a small lot, a unit inside the house or a garage conversion can be the only kind that fits. Lots with steep slopes, wetlands or shoreline are allowed less.
Why choose an ADU over a second principal home
The zone would also allow a second full-size house on many lots. An ADU is smaller, but it needs no parking, no street improvements and no affordability payment, and a detached one can be approved in weeks with a pre-approved plan. A second principal home can be on its own lot through a unit lot subdivision; an ADU cannot.
Worked example, not a real job
Example: a 5,000 sq ft lot in a Neighborhood Residential zone
A typical flat city lot away from a major transit stop, with one house on it today. The limits are computed from the city's January 2026 summary of the zone. Check your own lot before relying on any of it.
| Line | How it is worked out | Amount |
|---|---|---|
| Homes allowed | The greater of four, or one per 1,250 sq ft of lot. | 4 |
| Of which ADUs | No lot may have more than two. | 2 |
| Floor area, house alone | One home on 5,000 sq ft: floor area ratio 0.6. | 3,000 sq ft |
| Floor area, house and one ADU | Two homes, one per 2,500 sq ft: ratio 0.8. The total covers both buildings. | 4,000 sq ft |
| Floor area, house and two ADUs | Three homes, one per 1,667 sq ft: ratio 1.0. | 5,000 sq ft |
| Ground covered by buildings | Lot coverage of 50 percent. | 2,500 sq ft |
| Largest two-bedroom cottage | The ADU size limit, if the floor area above leaves room for it. | 1,000 sq ft |
| Permit | Construction permit with full plan review. The fee is set by the city from the project's value. | By value |
| Sales tax on the build | Seattle's combined rate for October to December 2026, on the whole contract. | 10.55% |
Permits
How an ADU is permitted in Seattle
The city’s ADU page is short and current. An accessory unit is not legal until it has been established through a permit. Adding one inside the house or building a detached one takes a construction permit for an addition or alteration. Legalizing a unit that already exists takes a construction permit to establish use.
- No quick permit. Creating or converting to an ADU is on the list of projects that do not qualify for the subject-to-field-inspection permit, so the plans are reviewed in full.
- Pre-approved cottage plans. The planning office keeps a gallery of pre-approved DADU designs. The city says that with one of them you can get the permit in 2 to 6 weeks in most cases.
- Other permits. Electrical from SDCI, plumbing from Public Health Seattle & King County, and a new or changed electrical service from Seattle City Light where needed.
- The county is told. SDCI reports every ADU permit to King County, which bills a sewer capacity charge to the owner: $46.01 a month for 15 years at the 2026 rate.
- Tiny houses. A tiny house on wheels is treated like a camper, and the city says you cannot live in one on a Seattle lot. A tiny house on a foundation is a DADU.
See what an ADU would cost on your lot
The ADU cost calculator takes the type of unit, its size and your lot's conditions and returns a budget range with the sales tax and the capacity charge shown.
Questions
Seattle ADU questions, answered
01How many ADUs can I build on my lot in Seattle?
Two. Seattle Municipal Code 23.42.022 says no lot may have more than two accessory dwelling units, and they may be attached, detached or stacked. Since January 21, 2026 the units also count toward the total number of homes the zone allows on the lot, which is four on most Neighborhood Residential lots, or six within a quarter mile of a major transit stop or when at least two homes are affordable.
02How big can a DADU be in Seattle?
Up to 1,000 square feet of gross floor area with up to two bedrooms, and up to 1,200 square feet with three or more bedrooms. Up to 250 square feet of attached garage, any story or part of a story that is underground, and up to 35 square feet of bicycle parking are not counted. The unit also has to fit inside the lot's floor area and lot coverage limits, which it now counts toward.
03Does a Seattle ADU need a parking space?
No. The code says no off-street motor vehicle parking is required for an accessory dwelling unit. The city's ADU page adds that street improvements and mandatory housing affordability contributions do not apply to accessory units either.
04Can I rent out my ADU, and do I have to live on the property?
You can rent it, and you do not have to live there. Seattle's ADU section has no owner-occupancy rule, and state law, RCW 36.70A.681, says a city may not require the owner to live in or occupy the accessory unit or another home on the lot. If an older permit put an owner-occupancy covenant on your title, the city has a form to release it. Seattle has separate rules for rental registration and short-term rentals, so check those before you list a unit.
05Can a DADU be sold separately from the house?
As a condominium unit, yes. The code says the land use rules may not be applied to prohibit the sale of a condominium unit on the grounds that it was built as an accessory dwelling unit. What is not allowed is subdivision: the city's summary of the rules says an accessory dwelling unit may not be separated from the principal unit through subdivision. Forming a condominium is legal work, so talk to a real estate attorney first.
06Is there a minimum lot size for a DADU in Seattle?
Not in the current ADU section. The 3,200 square foot minimum that many pages still quote was in section 23.44.041, which the city repealed in 2025. What limits a small lot now is arithmetic: the unit counts toward the floor area ratio and the 50 percent lot coverage limit, and it has to meet the setbacks. Slopes, wetlands and shorelines reduce what a lot may hold.
07What is the difference between an ADU and a DADU?
An ADU, or accessory dwelling unit, is a second, smaller home on the same lot as a house. The city calls a unit inside or attached to the house an attached accessory dwelling unit, or AADU: a basement apartment is the usual example. A DADU is a detached accessory dwelling unit, a separate building in the yard, often called a backyard cottage. Both follow the same section of the code.
08What is HB 1337?
House Bill 1337 is the 2023 Washington law, now RCW 36.70A.680 and 36.70A.681, that set a floor under city ADU rules. Cities must allow at least two ADUs per lot, may not cap their size below 1,000 square feet or their roof height below 24 feet, may not require owner occupancy, may not require parking within half a mile of a major transit stop, and may not block the sale of an ADU as a condominium. Seattle's Ordinance 127211 brought the city code into line in 2025.
Free estimate
Find out what your lot can hold
We visit, measure the house and the yard, check the zoning, the slope, the trees and the utilities, and tell you which kind of unit fits before you pay for drawings.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Keep reading
- ADU and DADU buildersHow a cottage or an in-home unit gets planned, permitted and built.
- ADU and DADU cost in SeattleCost by type of unit, with the tax, fees and county charge.
- Basement finishing permits in SeattleThe code rules for a basement apartment.
- Bellevue ADU rulesAcross the lake the limits are different.
Sources
- 01Seattle Ordinance 127376: Neighborhood Residential update, amends SMC 23.42.022 (passed Dec. 16, 2025; in effect Jan. 21, 2026) (read Nov 18, 2026)
- 02Seattle Ordinance 127211: adds SMC 23.42.022 (passed May 6, 2025; in effect June 30, 2025) (read Nov 18, 2026)
- 03RCW 36.70A.681: state rules for accessory dwelling units (HB 1337, 2023) (read Nov 18, 2026)
- 04Seattle SDCI: Accessory dwelling units (read Nov 18, 2026)
- 05Seattle SDCI Building Connections: New middle housing codes (March 2, 2026) (read Nov 18, 2026)
- 06Seattle SDCI Building Connections: ADUs and middle housing (July 7, 2025) (read Nov 18, 2026)
- 07Seattle OPCD: Summary of updated rules in Neighborhood Residential zones (January 2026) (read Nov 18, 2026)
- 08Seattle OPCD: One Seattle Plan and zoning implementation (read Nov 18, 2026)
- 09Seattle SDCI Tip 116A, dated Aug. 18, 2023 (out of date; cited for that reason) (read Nov 18, 2026)
- 10Seattle SDCI Tip 116B, dated Aug. 18, 2023 (out of date; cited for that reason) (read Nov 18, 2026)
- 11Seattle SDCI: Director's Rules page, with the notice that tips may not reflect current regulations (read Nov 18, 2026)
- 12Seattle SDCI Tip 316: Subject-to-field-inspection permits (updated Oct. 29, 2026) (read Nov 18, 2026)
- 13Seattle SDCI: Construction permit, addition or alteration (read Nov 18, 2026)
- 14King County: sewage treatment capacity charge, 2026 rates (read Nov 18, 2026)
- 15Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)