ADU rules · Unincorporated King County
King County ADU rules in 2026
If your home is outside any city's limits, King County is your building department and its code decides what you may add. The rules split in two: the urban area allows two units per lot, the rural area one. This page follows the county's March 2026 information sheet, which prints the code.
By Giant Builders SeattleUpdated Rules checked against city sources in November 2026
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
Outside city limits, King County allows two accessory dwelling units per lot in the urban area and one in the rural area. An ADU may have 1,000 square feet of heated floor area plus 1,000 square feet of unheated area, needs no extra parking, and must be recorded on the property’s title before the permit is approved.
- ADUs per lot: urban area, or rural area
- 2 or 1
- Heated floor area, plus unheated floor area
- 1,000 + 1,000 sq ft
- County application review fee for a new ADU, 2026
- $4,556
- Sales tax in most unincorporated areas, October to December 2026
- 10.3%
The code
King County's ADU standards, item by item
The standards are in King County Code 21A.08.030, subsection B.7.a. The county's Permitting Division prints them in its ADU information sheet, last revised in March 2026. Item numbers below are the sheet's.
| Rule | What the code says | Item |
|---|---|---|
| Urban area: how many | Two ADUs per lot: one attached and one detached, two attached, or two detached, in one or two structures. | 7(a) |
| Rural area: how many | One ADU per lot, in the rural area and on natural resource lands. | 8(a) |
| Rural area: detached units | Allowed only when the lot has no more than one primary home, and is at least 3,200 sq ft in a rural town or meets the minimum lot area of its zone elsewhere. Otherwise the unit must be in the same building as the house. | 8(b) |
| Size | No more than 1,000 sq ft of heated floor area and 1,000 sq ft of unheated floor area. | 1 |
| Size exceptions | No limit for a unit wholly within the basement or attic of the house. A basement under a detached unit does not count. In the urban area, heated area may rise to 1,500 sq ft, one square foot for each square foot of unheated area not used. | 1(a) to (c) |
| Height | A unit that is not wholly inside an existing home may not exceed the base height of the zone. | 2 |
| What counts as attached | At least one common wall with the house. A breezeway counts only if it is under 10 ft long, shares a wall with both buildings, and is fully enclosed and heated. | 3 |
| Parking | No additional off-street parking spaces are required. | 4 |
| Notice on title | A recorded notice that identifies the unit as accessory. Proof of filing is due before the county approves the permit. | 5 |
| Converting a garage, urban area | Existing structures, garages included, may be converted even if they are legally nonconforming for setbacks or impervious surface. No public street improvements are required. | 7(b) and (c) |
| Farm and forest zones | Agriculture zone: attached units only, accessory to commercial agriculture. Forest zone: ADUs are prohibited. | 6 and the sheet's overview |
Urban or rural
The first question is which area your lot is in
Washington’s growth management law draws a line around the places meant to grow, the urban growth area. Inside it, the state’s ADU law, RCW 36.70A.681, requires two ADUs per lot, and the county’s code follows. Outside it, in the rural area, the county keeps one unit per lot and limits where a detached one can go.
In the urban area
The rules are close to a city’s. Two units in any mix, including two cottages. An old garage that sits too near the lot line can still be converted. No street improvements can be required. And the trade between heated and unheated area lets a unit with a small garage, or none, reach 1,250 or even 1,500 square feet of living space, which is more than Seattle, Bellevue, Kirkland or Redmond allow.
In the rural area
One unit. If it is in the same building as the house, only one entrance may face the street. A detached unit needs a lot that meets the minimum area for its zone, and the code asks that it be designed to be compatible with the house and its neighbors. In the rural zones a detached ADU also counts as a separate home when the land is later subdivided.
Septic and sewer
Many unincorporated lots are on septic systems. The county’s sheet says an ADU may need public health approval of the on-site sewage system, or a sewer certificate, the same review a new home gets. A septic system sized for the existing house may not have room for another kitchen and bathroom, so this is the first thing to check on a rural lot. Septic, plumbing and gas piping permits all come from Public Health Seattle & King County.
Who issues what, outside the cities
- Building permit: King County Permitting, applied for online through MyBuildingPermit.com.
- Plumbing, gas piping and septic: Public Health Seattle & King County. Plumbing is $137 plus $27 per fixture in 2026.
- Electrical: the Washington State Department of Labor & Industries, not the county.
- Sewer capacity charge: on lots that connect to a sewer served by King County’s treatment system, $46.01 a month for 15 years. A unit on septic does not connect and is not charged.
Fees
What King County charges for an ADU permit in 2026
| Project | Application review | Site review | Inspection |
|---|---|---|---|
| New accessory dwelling | $4,556 | $3,618 | $2.46 per sq ft |
| Addition or conversion to living space, or a garage addition | $3,109 | $2,033 for a basic review, $3,618 for multiple or complex reviews | $2.46 per sq ft |
| Fire sprinklers, where required | $1,119 | $1,997 |
Unlike Seattle, the fee is not based on value
Seattle computes its building permit fee from the value of the work. King County charges flat review fees by project type and an inspection fee by the square foot, so the fee does not move with what you spend on finishes.
Sales tax
The combined rate in unincorporated King County is 10.3% inside the regional transit district and 8.9% outside it, for October to December 2026. It applies to the whole construction contract, labor included. On a $300,000 contract the difference between the two rates is $4,200, so it is worth knowing which side of the line you are on.
A worked example
The rules and fees applied to one unit
Worked example, not a real job
Example: an 800 sq ft detached ADU on an urban-area lot
A typical one-story backyard unit on a lot outside city limits, inside the urban growth area and the regional transit district, connected to sewer. The contract figure is an example inside the Seattle-area range of $250,000 to $500,000 for a new cottage.
| Line | How it is worked out | Amount |
|---|---|---|
| Units allowed | Urban area: two per lot. This is the first. | Allowed |
| Size | 800 sq ft heated, against 1,000. With no garage, up to 1,500 sq ft heated would be allowed. | Allowed |
| Parking | No additional off-street parking is required. | 0 spaces |
| Notice on title | Recorded before the county approves the permit. | Required |
| Construction contract | The example figure. | $300,000 |
| Sales tax | 10.3% of the contract price (unincorporated King County, October to December 2026). | $30,900 |
| County application review | New home, accessory dwelling. | $4,556 |
| County site review | As listed for a new accessory dwelling. | $3,618 |
| County inspection | 800 sq ft at $2.46. | $1,968 |
| State building code surcharge | Per permit. | $6.50 |
| Sewer capacity charge | King County, billed to the owner for 15 years. | $46.01 a month |
| County building permit fees in this example | $10,148.50 | |
See what an ADU would cost
The ADU cost calculator takes the type of unit, its size and your location and returns a budget range with the sales tax shown.
Questions
King County ADU questions, answered
01How many ADUs can I build in unincorporated King County?
Two per lot in the urban area, and one per lot in the rural area and on natural resource lands. In the urban area the two may be one attached and one detached, two attached, or two detached, in one building or two. These are the standards of King County Code 21A.08.030.B.7.a as printed in the county's March 2026 information sheet.
02How big can an ADU be in unincorporated King County?
An ADU may have up to 1,000 square feet of heated floor area and up to 1,000 square feet of unheated floor area, such as a garage. The limit does not apply to a unit wholly inside the basement or attic of the house, and a basement under a detached unit is not counted. In the urban area, heated area can go as high as 1,500 square feet by giving up the same amount of unheated area: the county's own example is 1,250 heated with 750 unheated.
03Can I build a detached ADU on a rural lot in King County?
Sometimes. In the rural area the ADU must be in the same building as the house unless two conditions are met: there is only one primary home on the lot, and the lot is at least 3,200 square feet in a rural town or meets the minimum lot area for its zone elsewhere. In the Agriculture zone only an attached unit is allowed, and in the Forest zone ADUs are prohibited.
04Do I need a parking space for an ADU in unincorporated King County?
No. The code says no additional off-street parking spaces are required for accessory dwelling units, in the urban and the rural area alike.
05What is the notice on title for a King County ADU?
Before the county approves a permit to build an ADU, the applicant must record a notice that identifies the unit as accessory. The notice is approved by the county's records and licensing division and runs with the land, which means it stays on the title when the property is sold. The county has a form for it, called the notice on title requirements and affidavit.
06Does the owner have to live on the property?
The standards in the county's March 2026 information sheet contain no owner-occupancy condition. The county's online permit FAQ still says the ADU or the house must be owner-occupied, and that only one ADU is allowed, which is the older rule. State law bars an owner-occupancy requirement inside urban growth areas. For a rural lot, ask the Permitting Division which text applies before you plan a rental.
07What does King County charge to permit an ADU?
For a new accessory dwelling the county's 2026 fee guide lists an application review fee of $4,556, a site review fee of $3,618 and an inspection fee of $2.46 per square foot. For an 800 square foot unit that is $10,148.50 with the state surcharge, before any sprinkler fees or school impact fees. Converting existing space or a garage has a lower review fee, $3,109. Plumbing permits come from Public Health and electrical permits from the state.
08Is my address in unincorporated King County?
Not necessarily what the mailing address suggests. A home with a Renton, Redmond or Woodinville mailing address can sit outside that city's limits, and then the county's code applies, not the city's. The county's property research tools show the jurisdiction for a parcel. If you are inside a city, that city's rules apply.
Inside a city? See the rules for Seattle, Bellevue, Kirkland and Redmond.
Free estimate
Find out what your lot can hold
We visit, check whether the lot is urban or rural, look at the septic or sewer, the well, the slopes and the setbacks, and tell you which kind of unit fits before you pay for drawings.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Keep reading
Sources
- 01King County Permitting: Residential accessory dwelling units, information sheet (March 2026) (read Nov 18, 2026)
- 02King County Permitting: 2026 Fee Guide 02, single family residential construction (December 2025) (read Nov 18, 2026)
- 03King County Permitting: permit guide FAQ (its ADU answer is out of date; cited for that reason) (read Nov 18, 2026)
- 04RCW 36.70A.681: state rules for accessory dwelling units (HB 1337, 2023) (read Nov 18, 2026)
- 05Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)
- 06Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 07Public Health Seattle & King County: plumbing and gas piping permits (read Nov 18, 2026)
- 08Public Health Seattle & King County: plumbing and gas piping fees (effective Jan. 1, 2026) (read Nov 18, 2026)
- 09King County: sewage treatment capacity charge, 2026 rates (read Nov 18, 2026)