ADU rules · Bellevue
Bellevue ADU rules in 2026
Until June 2025 Bellevue did not allow a backyard cottage at all. It does now, and the rules differ from Seattle's on size, height, parking and rentals. This page follows the ordinance the City Council adopted.
By Giant Builders SeattleUpdated Rules checked against city sources in November 2026
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
Bellevue allows up to two accessory dwelling units on a lot, attached or detached, each up to 1,200 square feet. A detached unit may be 24 feet tall, parking is required only for a unit of 1,000 square feet or more that is over half a mile from a major transit stop, and a unit may be rented only for 30 days or longer.
- Accessory dwelling units allowed on a lot
- 2
- Floor area limit for each unit
- 1,200 sq ft
- Height limit for a detached unit
- 24 ft
- Bellevue sales tax, October to December 2026
- 10.3%
The code
Bellevue's ADU rules, subsection by subsection
The rules are in Land Use Code 20.20.120, rewritten by Ordinance 6851. The City Council adopted it on June 24, 2025 to carry out the state's middle housing and ADU laws.
| Rule | What the code says | Where |
|---|---|---|
| Where they are allowed | On each lot in a land use district that allows a single-family home. | 20.20.120.C.1 |
| How many | Up to two per lot. | 20.20.120.C.1 |
| Size | A maximum of 1,200 sq ft of floor area. Up to 300 sq ft per unit for parking or unheated storage is exempt. | 20.20.120.C.3 |
| When a unit may be larger | With the Director's approval: a unit on one entire floor of the house, an addition to an existing detached accessory structure, or a conversion of one. A converted guest cottage is exempt if it is not expanded. | 20.20.120.C.3.a and b |
| Converting a garage | Existing structures, including detached garages, may be converted even if they do not meet today's setbacks and lot coverage, if they were permitted when built. | 20.20.120.C.4 |
| Parking | None for a unit under 1,000 sq ft (not counting a garage) or within half a mile of a major transit stop. Otherwise one space per unit. | 20.20.120.C.5 |
| Home business | A site may not have both an ADU and a business that needs a Home Occupation Permit. | 20.20.120.C.6 |
| Unit lots | No new ADU on a unit lot that was created by a unit lot subdivision and developed under it. | 20.20.120.C.7 |
| Attached units | Inside or attached to the house, with the same height and setback rules as the house. Their floor area is left out of the house's floor area limit. | 20.20.120.C.3 and D |
| Detached units | 24 ft high, or 28 ft as an addition over an existing accessory structure, measured to the highest point. Same dimensional rules as middle housing, and they may sit at a lot line on an alley. | 20.20.120.E |
| Counting toward density | A detached unit counts toward the maximum number of homes on the lot. An attached unit does not. | LUC 20.20.538, note to its table |
| Renting | Long-term occupancy only: 30 days or longer. | City rental regulations page |
| Owner occupancy | No requirement in the section, and state law does not allow one. | RCW 36.70A.681 |
What changed
From no cottages to two units per lot
2023: the first reform
Bellevue’s 2023 code change raised the size limit for a unit inside the house from 800 to 1,200 square feet, ended the rule that the owner live on the site, and allowed an ADU to be sold to a separate owner. It did not allow detached units.
June 24, 2025: Ordinance 6851
The state’s ADU law, RCW 36.70A.681, requires cities to allow two ADUs per lot, attached or detached. Bellevue’s middle housing ordinance did that and wrote a new section with standards for both kinds. The ordinance took effect five days after adoption and publication.
How Bellevue differs from Seattle
- Size: 1,200 square feet for any unit. Seattle allows 1,000, or 1,200 with three or more bedrooms.
- Height: a fixed 24 feet for a detached unit. Seattle uses the height limit of the house.
- Parking: Bellevue can require a space for a large unit away from transit. Seattle requires none.
- Density: only a detached unit counts toward the lot’s number of homes. In Seattle both kinds count.
- Rentals: Bellevue limits an ADU to stays of 30 days or longer.
The Seattle ADU rules page has the other side of the comparison.
Permits and charges
- The city’s permit page says ADUs are treated as regular dwelling units for permitting: a lot with one or two homes, ADUs included, uses the one- and two-family building permit.
- Bellevue’s own building department issues the plumbing permit. Public Health issues plumbing permits only in Seattle and unincorporated King County.
- Bellevue’s sewers feed King County’s treatment system, so the county’s capacity charge for a new ADU applies: $46.01 a month for 15 years at the 2026 rate.
A worked example
The rules applied to one cottage
Worked example, not a real job
Example: a 1,100 sq ft backyard cottage, a mile from the nearest major transit stop
A typical two-bedroom detached unit on a Bellevue lot that has one house and no alley. The contract figure is an example inside the Seattle-area range of $250,000 to $500,000 for a new cottage.
| Line | How it is worked out | Amount |
|---|---|---|
| Size | Under the 1,200 sq ft limit, so no approval from the Director is needed. | Allowed |
| Height | Detached unit, measured to the highest point. | 24 ft at most |
| Parking | The unit is 1,000 sq ft or more and over half a mile from a major transit stop. | 1 space |
| Counts as a home on the lot | Detached units count toward the maximum number of dwelling units. | Yes |
| Renting | Long-term occupancy only. | 30 days or more |
| Construction contract | The example figure. | $350,000 |
| Sales tax | 10.3% of the contract price (Bellevue, October to December 2026). | $36,050 |
| Building permit | One- and two-family building permit. The fee is set by the city from the project's value. | By value |
| Sewer capacity charge | King County, billed to the owner for 15 years. | $46.01 a month |
See what an ADU would cost
The ADU cost calculator takes the type of unit, its size and your city and returns a budget range with the sales tax and the capacity charge shown.
Questions
Bellevue ADU questions, answered
01How many ADUs can I have on my lot in Bellevue?
Up to two. Bellevue Land Use Code 20.20.120, as rewritten by Ordinance 6851 in June 2025, permits up to two accessory dwelling units on each lot in a land use district that allows a single-family home. They may be attached to the house or detached from it.
02Does Bellevue allow backyard cottages (DADUs)?
Yes, since 2025. Before Ordinance 6851, Bellevue allowed only units attached to or inside the house, and an older city web page still says detached units are not allowed. The current code has a section of standards for detached accessory dwelling units: they are limited to 24 feet in height, or 28 feet when built as an addition over an existing accessory structure, and they may sit at a lot line that abuts an alley.
03How big can an ADU be in Bellevue?
1,200 square feet of floor area. Up to 300 square feet per unit used for parking or unheated storage is not counted. The Director may approve a larger unit in three cases: when it takes up one entire floor of the house, when it is an addition to an existing detached accessory structure, or when it is a conversion of one.
04Do I need a parking space for an ADU in Bellevue?
Only for a larger unit away from transit. No off-street parking is required for an accessory dwelling unit of less than 1,000 square feet, not counting any garage, or for one within half a mile of a major transit stop. Otherwise the code asks for one space per unit, in addition to the parking the house needs.
05Can I rent my Bellevue ADU on a short-term rental site?
No. The city's rental regulations page says an ADU may only be rented for long-term occupancy, which the Land Use Code defines as any period of 30 days or longer. Stays of less than 30 days are transient lodging and are not allowed in an ADU or in a house that has one.
06Do I have to live on the property to have an ADU in Bellevue?
No. Bellevue removed its owner-occupancy requirement in 2023, the current section does not contain one, and state law, RCW 36.70A.681, does not allow a city to require it.
07Does an ADU count toward the number of homes allowed on my Bellevue lot?
A detached one does. When the City Council adopted the middle housing rules on June 24, 2025, it decided that detached accessory dwelling units count toward the maximum number of dwelling units per lot and attached ones do not. The floor area of an attached unit is also left out of the floor area limit for the house.
08What sales tax applies to building an ADU in Bellevue?
Bellevue's combined sales tax rate is 10.3% for October to December 2026, and in Washington it applies to the whole construction contract, labor included. On a $350,000 contract that is $36,050. Addresses in Bellevue outside the regional transit district have a lower rate, 8.9%, so check the rate for your address.
Free estimate
Find out what your Bellevue lot can hold
We visit, measure the house and the yard, check the zoning and the distance to transit, and tell you which kind of unit fits before you pay for drawings.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Keep reading
- ADU and DADU buildersHow a cottage or an in-home unit gets planned, permitted and built.
- Remodeling in BellevueThe permit office, the tax rate and local costs.
- Kirkland ADU rulesNext door, separate ownership is written into the code.
- ADU and DADU cost in SeattleCost by type of unit, with tax, fees and the county charge.
Sources
- 01Bellevue Ordinance 6851: middle housing and accessory dwelling units, LUC 20.20.120 (council record, June 24, 2025) (read Nov 18, 2026)
- 02Bellevue Land Use Code 20.20.120, the published code (linked for reference; we read the ordinance)
- 03City of Bellevue: Middle housing code amendments (read Nov 18, 2026)
- 04City of Bellevue: Council roundup, June 24, 2025 (read Nov 18, 2026)
- 05City of Bellevue: Residential rental regulations (read Nov 18, 2026)
- 06City of Bellevue: Middle housing building permits (read Nov 18, 2026)
- 07City of Bellevue: ADU Reform page from 2023 (out of date; cited for that reason) (read Nov 18, 2026)
- 08RCW 36.70A.681: state rules for accessory dwelling units (HB 1337, 2023) (read Nov 18, 2026)
- 09Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)
- 10Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 11King County: sewage treatment capacity charge, 2026 rates (read Nov 18, 2026)
- 12King County: local sewer agencies served by the regional system (read Nov 18, 2026)
- 13Public Health Seattle & King County: plumbing and gas piping permits (read Nov 18, 2026)
