Skip to the content

ADU rules · Redmond

Redmond ADU rules in 2026

Redmond replaced its ADU rules in 2025 and edited them again in June 2026. The new section is short: two units per lot, 1,000 square feet, and none of the owner and parking conditions the old one carried. This page follows the code as the City Council last amended it.

By Giant Builders SeattleUpdated Rules checked against city sources in November 2026

WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short answer

Redmond allows two accessory dwelling units or tiny homes on each residential lot, and an ADU may be up to 1,000 square feet. The zoning code requires no parking space for an ADU anywhere in the city, a building that holds an ADU may be as tall as the zone allows, and the city requires fire sprinklers in a detached unit.

ADUs or tiny homes allowed on a residential lot
2
Size limit for an ADU. 400 sq ft for a tiny home
1,000 sq ft
Parking spaces the code requires for an ADU
0
Redmond sales tax, October to December 2026
10.4%

The code

Redmond's ADU rules, line by line

The rules are in Redmond Zoning Code 21.04.1110, Accessory Dwelling Units and Tiny Homes. The section dates from the city's 2025 code update (Ordinance 3220) and was last amended by Ordinance 3261, approved on June 2, 2026.

RZC 21.04.1110 and related sections
RuleWhat the code saysWhere
How manyTwo ADUs or tiny homes shall be allowed on each residential lot.21.04.1110.C.1
Where on the lotInside or added to the primary home, or in a detached structure on the same lot.21.04.1110.C.2.a
Lot coverage and setbacksA detached ADU and the house must each meet the lot coverage limits and the other standards for a detached home in the zone. A detached ADU may sit right at a lot line that abuts a public alley or right-of-way.21.04.1110.C.2.b
SizeThe total square footage of an ADU shall not exceed 1,000 sq ft.21.04.1110.C.3.a
A larger unit: whole floorIf the ADU occupies an entire single floor of the house, the Administrator may allow a larger size so the floor can be used efficiently.21.04.1110.C.3.b
A larger unit: large siteOn a site over 10,000 sq ft, the Administrator may allow a larger size if the ADU is an affordable housing unit or a public benefit is provided.21.04.1110.C.3.c
Tiny homesNo more than 400 sq ft. In public view, landscaping must fully screen the trailer base.21.04.1110.C.2.c and C.3.d
Home businessAllowed in both the ADU and the primary home, under the existing rules.21.04.1110.C.4
Ceiling height in the houseThe Building Official may waive the building code's ceiling height where the structure was built in compliance with past codes.21.04.1110.C.5
HeightAn accessory structure that contains an ADU may be as tall as the underlying zone allows. Other accessory structures are limited to 22 ft.RZC 21.04.1120
ParkingMinimum required for an accessory dwelling unit: zero, in all three location classes of the table.RZC Table 21.40.010D
SprinklersRequired for detached ADU units.City residential permits page
Read in the exhibits to Ordinance 3261 in the City Council’s record, which print the code “current through Ordinance 3226, passed September 2, 2025” with the 2026 changes marked, and in the city’s chapter 21.04 as prepared for adoption in May 2025 (the height line). The codified text is at redmond.municipal.codes.

What changed

What the old Redmond rules said, and what replaced them

Redmond’s earlier ADU section, RZC 21.08.220, allowed one ADU or tiny home per lot. A detached unit could be no more than a set share of the combined floor area of the house and the unit. A parking space was required. And no permit was issued until the owner recorded a document on the title about owner occupancy and on-site parking.

The state’s ADU law, RCW 36.70A.681, set a floor those rules did not meet: cities must allow two ADUs per lot, may not cap them below 1,000 square feet, and may not require the owner to live on the lot. Redmond’s 2025 code update moved the rules to a new section, 21.04.1110, and dropped the old conditions. The percentage test, the covenant and the parking space are not in it.

The June 2026 edit

Ordinance 3261 made one change inside the ADU section. It deleted the line that said ADUs could not be used to meet a requirement to provide affordable homes. The rest of the section was left as it was.

How Redmond differs from its neighbours

Redmond’s 1,000 square foot limit is lower than the 1,200 allowed in Bellevue and Kirkland. In return, Redmond asks for no parking anywhere, where both neighbours can require a space away from transit. Redmond is also the only one of the three whose section covers tiny homes.

Permits and charges

  • The city’s residential permits page lists adding an ADU under building permits, requested through its Plan Review Online form. Fees are based on the value of construction, and impact and capital facilities charges may apply.
  • Redmond issues its own plumbing permit. Public Health issues plumbing permits only in Seattle and unincorporated King County.
  • Redmond’s sewers feed King County’s treatment system, so the county’s capacity charge for a new ADU applies: $46.01 a month for 15 years at the 2026 rate.

A worked example

The rules applied to one lot

Worked example, not a real job

Example: a 9,000 sq ft Redmond lot with one house, adding a detached ADU

A typical lot in a neighborhood zone, with no alley. The owner wants the largest detached unit the code allows. The contract figure is an example inside the Seattle-area range of $250,000 to $500,000 for a new cottage.

LineHow it is worked outAmount
Units allowedTwo ADUs or tiny homes per residential lot. This would be the first.Allowed
Largest sizeThe site is under 10,000 sq ft, so the large-site exception is not available.1,000 sq ft
HeightAn accessory structure that contains an ADU follows the zone's height limit.Zone limit
ParkingThe parking table's minimum for an accessory dwelling unit.0 spaces
Fire sprinklersRequired by the city for detached ADU units.Required
Construction contractThe example figure, sprinklers included.$320,000
Sales tax10.4% of the contract price (Redmond, October to December 2026).$33,280
Building permitThe fee is set by the city from the value of construction. Impact and capital facilities charges may apply.By value
Sewer capacity chargeKing County, billed to the owner for 15 years.$46.01 a month
An illustration, not a real property and not a quote. Lot coverage, setbacks and the zone's height limit decide where the unit can sit, and those depend on the lot.

See what an ADU would cost

The ADU cost calculator takes the type of unit, its size and your city and returns a budget range with the sales tax and the capacity charge shown.

Open the ADU calculator

Questions

Redmond ADU questions, answered

01

How many ADUs can I build on my lot in Redmond?

Two. Redmond Zoning Code 21.04.1110 says two ADUs or tiny homes shall be allowed on each residential lot. An ADU may be inside or added to the house, or in a detached structure on the same lot. The older code, which is still easy to find online, allowed one.

02

How big can an ADU be in Redmond?

The total square footage of an ADU may not exceed 1,000 square feet. The code gives two ways to go larger. If the ADU takes up an entire single floor of the house, the city's Administrator may allow more so the whole floor can be used. If the site is larger than 10,000 square feet, the Administrator may allow more when the ADU is an affordable housing unit or a public benefit is provided.

03

Does Redmond require a parking space for an ADU?

No. Redmond's off-street parking table lists a minimum of zero spaces for an accessory dwelling unit in every part of the city: near frequent transit, in a center, and in all other locations. The older code required one off-street space, and that requirement is gone.

04

Do I have to live on the property to have an ADU in Redmond?

The current ADU section has no owner-occupancy rule. Redmond's older section required a recorded document about owner occupancy and parking before the permit was issued; that language is not in the section that replaced it in 2025. State law, RCW 36.70A.681, does not allow a city to require the owner to live on the lot.

05

Are tiny homes allowed in Redmond?

Yes, under the same section as ADUs. A tiny home may not exceed 400 square feet, and one that can be seen from the street must have landscaping that fully screens its trailer base. The use table allows one tiny home for each allowed dwelling unit, and two where there is only one primary home on the lot.

06

Does a detached ADU need fire sprinklers in Redmond?

Yes. The city's residential permits page says sprinklers are required for detached ADU units. That adds a sprinkler design, a larger water supply in some cases and a separate fire permit, so it belongs in the budget from the start.

07

Can I sell a Redmond ADU separately from the house?

Redmond's older code said an ADU could not be subdivided or segregated in ownership from the house. The current section does not say that, and state law says a city may not prohibit the sale of a condominium unit solely because it was built as an ADU. Forming a condominium is legal work, so talk to a real estate attorney and to the city before you plan around it.

08

What sales tax applies to building an ADU in Redmond?

Redmond's combined sales tax rate is 10.4% for October to December 2026, and in Washington it applies to the whole construction contract, labor included. On a $320,000 contract that is $33,280. Addresses in Redmond outside the regional transit district have a lower rate, 9%.

Free estimate

Find out what your Redmond lot can hold

We visit, measure the house and the yard, check the zone's lot coverage and height limit, and tell you which kind of unit fits before you pay for drawings.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

When would you like to start?

We use your details to answer you. Nothing else.