ADU rules · Kirkland
Kirkland ADU rules in 2026
Kirkland already allowed two accessory units per house, and in June 2025 it loosened the rules again: separate ownership, unit lots for cottages, easier garage conversions. This page follows the ordinance, line by line.
By Giant Builders SeattleUpdated Rules checked against city sources in November 2026
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
The short answer
Kirkland allows two accessory dwelling units per single-family home, attached or detached in any mix, each up to 1,200 square feet. An ADU may be owned separately from the house, a detached one may sit on its own unit lot, and no parking is required within half a mile of a major transit stop.
- Accessory dwelling units allowed per single-family home
- 2
- Gross floor area limit for each unit
- 1,200 sq ft
- The day Ordinance O-4905 was passed
- June 17, 2025
- Kirkland sales tax, October to December 2026
- 10.4%
The code
Kirkland's ADU rules, line by line
The rules are in Kirkland Zoning Code 115.07. The City Council amended the section with Ordinance O-4905 on June 17, 2025, to match the state's housing laws. The numbers below are the section's own.
| Rule | What the code says | Where |
|---|---|---|
| How many | Two per single-family dwelling: one attached and one detached, or two of either type. | 115.07, opening paragraph |
| Ownership | An ADU may be segregated in ownership from the single-family dwelling. | 115.07.2 |
| Unit lots | A detached ADU may be subdivided within a unit lot subdivision under Title 22 of the municipal code. | 115.07.3 |
| Size | No more than 1,200 sq ft of gross floor area. More may be allowed for an attached unit that sits entirely within existing floor area on a single floor. | 115.07.4 |
| Not counted in the size | Area with less than 5 ft of ceiling height, uncovered roof decks and ground-level patios, and up to 200 sq ft of other covered or uncovered decks and porches. | 115.07.4.a to c |
| Setbacks, height, lot coverage | The same as for a single-family house in that zone. A detached unit must be in its own structure and may not share a roof with the house. | 115.07.5 |
| Converting a garage | Permitted conversions of existing structures, detached garages included, are exempt from current setback and lot coverage rules if existing nonconformities are not increased. | 115.07.6 |
| Parking | None within half a mile of a major transit stop. Farther out, one off-street space on a lot with more than one ADU, unless street parking is available within 600 ft or frequent transit is within half a mile. | 115.07.7 |
| Ceiling height in the house | Space that was legally built as habitable space need not meet the current building code's ceiling height. | 115.07.8 |
| Registration | An ADU permit application with an affidavit, and a covenant recorded with the King County Recorder's Office that notes the unit on the title. | 115.07.9 |
| Shoreline lots | In the Residential-L shoreline environment: one ADU only, and no separate ownership. A detached unit must sit behind the main house. | City ADU regulations page |
What changed
What the 2025 ordinance added
The ordinance is printed with new words underlined and deleted words struck through, so the changes are easy to see. Six matter to a homeowner.
- Separate ownership has its own line. It says an ADU may be segregated in ownership from the house.
- A cottage can have its own unit lot. The old text said a property with a detached ADU could not be subdivided. The new text says a detached ADU may be subdivided within a unit lot subdivision.
- Garage conversions got an exemption. An existing structure that sits too close to a lot line can still become an ADU, as long as the encroachment does not grow.
- Transit removes the parking question. The half-mile rule for major transit stops is new.
- The entrance rule is gone. The requirement that the ADU’s door be “clearly secondary” to the main entrance was deleted.
- Patios and roof decks no longer count. Uncovered roof decks and ground-level patios are outside the 1,200 square feet.
How Kirkland differs from Seattle
Kirkland’s limit is 1,200 square feet for any unit, where Seattle’s is 1,000, or 1,200 with three or more bedrooms. Kirkland lets a cottage be placed on a unit lot, and Seattle does not allow an ADU to be separated by subdivision at all. Kirkland can ask for one parking space when a lot has two units away from transit, and Seattle asks for none. See the Seattle ADU rules.
Permits and charges
- The city’s ADU Toolkit offers pre-approved ADU plans and a step-by-step page on the permit process.
- Kirkland’s own building department issues the plumbing permit. Public Health issues plumbing permits only in Seattle and unincorporated King County.
- Kirkland’s sewers feed King County’s treatment system, so the county’s capacity charge for a new ADU applies: $46.01 a month for 15 years at the 2026 rate.
A worked example
The rules applied to one property
Worked example, not a real job
Example: a house with a basement unit, adding a backyard cottage
A typical Kirkland lot three quarters of a mile from the nearest major transit stop, with one registered basement ADU already. The owner wants a 1,000 sq ft detached cottage. The contract figure is an example inside the Seattle-area range of $250,000 to $500,000 for a new cottage.
| Line | How it is worked out | Amount |
|---|---|---|
| Second unit | Two ADUs are allowed, one attached and one detached. | Allowed |
| Size | 1,000 sq ft against a limit of 1,200. | Allowed |
| Parking | More than one ADU, and over half a mile from a major transit stop: one off-street space, unless street parking is available within 600 ft or frequent transit is within half a mile. | 1 space, or none |
| Ownership | The cottage may be owned separately, and may be placed on its own unit lot. | Allowed |
| Registration | ADU permit with an affidavit, and a covenant recorded on the title. | Required |
| Construction contract | The example figure, for the cottage. | $330,000 |
| Sales tax | 10.4% of the contract price (Kirkland, October to December 2026). | $34,320 |
| Building permit | The fee is set by the city from the project's value. | By value |
| Sewer capacity charge | King County, billed to the owner for 15 years. | $46.01 a month |
See what an ADU would cost
The ADU cost calculator takes the type of unit, its size and your city and returns a budget range with the sales tax and the capacity charge shown.
Questions
Kirkland ADU questions, answered
01How many ADUs can I build in Kirkland?
Two per single-family home. Kirkland Zoning Code 115.07 permits one attached and one detached unit, or two of either type. The city's ADU page adds one exception: a property in the Residential-L shoreline environment is allowed only one.
02How big can an ADU be in Kirkland?
1,200 square feet of gross floor area. Floor area under a ceiling lower than 5 feet is not counted, nor are uncovered roof decks and ground-level patios, nor up to 200 square feet of other decks and porches. For a unit inside the house that fills existing floor area on a single floor, the Planning and Building Director may allow more.
03Can I sell my ADU separately in Kirkland?
Yes. Ordinance O-4905, passed in June 2025, added a line to the code that says an accessory dwelling unit may be segregated in ownership from the single-family home, and another that lets a detached unit be placed on its own unit lot through a unit lot subdivision. The city's page notes that separate ownership is not available in the Residential-L shoreline environment.
04Do I need a parking space for an ADU in Kirkland?
Not within half a mile of a major transit stop. Farther out, the code as amended in 2025 asks for one off-street space on a lot with more than one ADU, unless street parking is available within 600 feet or the property is within half a mile of transit that runs every 15 minutes during commute hours. The city's summary page words the rule as one space for the first ADU, so confirm with the planning counter before you design.
05Do I have to live on the property to have an ADU in Kirkland?
The ADU section of the zoning code has no owner-occupancy requirement, and state law, RCW 36.70A.681, does not allow a city to impose one. The owner does have to register the unit: the application includes a covenant, recorded with the King County Recorder's Office, that notes the ADU on the title.
06Can I convert my garage to an ADU in Kirkland?
Yes. The 2025 ordinance added a line that exempts the permitted conversion of an existing structure, including a detached garage, from today's setback and lot coverage requirements, on the condition that any existing nonconformity is not made larger. The unit still has to meet the building code.
07Does Kirkland have pre-approved ADU plans?
Yes. The city's ADU Toolkit says Kirkland offers pre-approved ADU plans to save time and money, and it has pages on planning, paying for and permitting a unit. A pre-approved plan still has to fit your lot's setbacks, lot coverage and height limit.
08What sales tax applies to building an ADU in Kirkland?
Kirkland's combined sales tax rate is 10.4% for October to December 2026, and in Washington it applies to the whole construction contract, labor included. On a $330,000 contract that is $34,320.
Free estimate
Find out what your Kirkland lot can hold
We visit, measure the house and the yard, check the zone's setbacks and the distance to transit, and tell you which kind of unit fits before you pay for drawings.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
Keep reading
- ADU and DADU buildersHow a cottage or an in-home unit gets planned, permitted and built.
- Remodeling in KirklandThe permit office, the tax rate and local costs.
- Redmond ADU rulesThe neighbouring city caps units at 1,000 sq ft.
- ADU and DADU cost in SeattleCost by type of unit, with tax, fees and the county charge.
Sources
- 01Kirkland Ordinance O-4905: amends KZC 115.07, accessory dwelling units (passed June 17, 2025) (read Nov 18, 2026)
- 02City of Kirkland: ADU regulations (read Nov 18, 2026)
- 03City of Kirkland: The Kirkland ADU Toolkit (read Nov 18, 2026)
- 04RCW 36.70A.681: state rules for accessory dwelling units (HB 1337, 2023) (read Nov 18, 2026)
- 05Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)
- 06Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)
- 07King County: sewage treatment capacity charge, 2026 rates (read Nov 18, 2026)