Skip to the content

Cost guide · Seattle

Bathroom remodel cost in Seattle

What a bathroom costs here in 2026, from a tub-to-shower conversion to a rebuilt primary bath, with the published figures behind the ranges and the tax and permit lines added in.

By Giant Builders SeattleUpdated Rules checked against city sources in November 2026

A bathroom with marble-look wall tile, a floating wood vanity with two vessel sinks, dark floor tile and tall windows
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short answer

Most full bathroom remodels in Seattle cost $35,000 to $65,000 before tax; a refresh or a tub-to-shower conversion runs $15,000 to $30,000, and a primary bath or a new layout $75,000 to $130,000. Sales tax of 10.55% applies to the whole contract, labor included.

Midrange remodel, 5 by 7 ft bathroom, Seattle (Cost vs. Value 2025)
$36,146
Upscale remodel, enlarged to 100 sq ft
$107,451
What the midrange figure works out to
$1,033 per sq ft
Seattle sales tax, charged on labor and materials
10.55%

By scope

Bathroom remodel cost by scope

A bathroom is priced by what is done to it, not by its floor area. These three sizes of project cover most of what homeowners ask for. The ranges are typical for Seattle-area homes in 2026.

Typical Seattle bathroom costs in 2026
ScopeWhat changesTypical range, before taxWith 10.55% sales taxTime on site
Refresh or tub-to-showerThe room keeps its layout. A tub becomes a shower, or the vanity, toilet, fixtures, lighting and floor are replaced without opening every wall.$15,000 to $30,000$16,600 to $33,2002 to 3 weeks
Full remodelBack to the studs. New tub or tiled shower, waterproofing, tile, vanity, toilet, fan, lighting and wiring, with the fixtures in about the same places.$35,000 to $65,000$38,700 to $71,9004 to 6 weeks
Primary bath or new layoutThe room grows or is rearranged. Fixtures move, a wall comes out, and the finishes step up: a large tiled shower, a freestanding tub, two sinks, a heated floor.$75,000 to $130,000$82,900 to $143,7008 to 12 weeks
Ranges are typical local pricing, checked against Remodeling magazine's 2025 Cost vs. Value figures for Seattle. They are not a quote.
What the 2025 Cost vs. Value report prices in Seattle
Project in the reportWhat it includesSeattle job costAbove the U.S. averageRecouped at resale
Bath remodel, midrange5 by 7 ft room. All fixtures replaced: steel tub with a ceramic tile surround, new shower valve, toilet, vanity with a solid-surface top, medicine cabinet, ceramic tile floor.$36,14638%46.8%
Bath remodel, universal designThe same 5 by 7 ft room made wheelchair accessible: 36 inch door, curbless tiled shower with a seat, comfort-height toilet, heated floor, reachable storage and switches.$58,15138%59.2%
Bath remodel, upscaleA 35 sq ft room enlarged to 100 sq ft inside the house, every fixture moved: tiled shower with frameless glass, freestanding tub, two sinks, stone top, heated floor.$107,45132%35.3%
Bathroom addition, midrangeA new bathroom built as an addition to the house.$82,21836%39.7%
Source: Remodeling magazine, 2025 Cost vs. Value report, Seattle. The last two columns compare Seattle with the report’s national average and give its estimate of the value recovered at sale.

Why it costs what it does

Why a bathroom costs more per square foot than any other room

Divide the report’s figures by the size of each room and the bathroom stands out: about $1,033 per square foot for the midrange bathroom, against $478 for a major kitchen remodel and $107 for a finished basement. The room is small, but nothing in it is simple. Four things explain most of the difference between one bathroom price and another.

Whether the fixtures move

A toilet, a tub and a sink that stay where they are reuse the drains under the floor. Move them and the plumber opens the floor, reroutes drain and vent lines, and the plumbing permit grows by a fixture each. The upscale project in the report moves every fixture and nearly triples the floor area, and costs about three times the midrange one.

The shower

A steel tub with a tile surround is the cheapest wet area to build. A tiled shower built in place needs a sloped pan, a waterproofing layer behind every tile, and glass. A curbless shower also needs the floor framing lowered or the rest of the floor raised. The universal design project shows the price of that step: the same 5 by 7 foot room, $58,151 in place of $36,146.

How much tile, and which

Tile to the ceiling, a niche, a bench and a heated floor are each a modest line, and together they move a bathroom from the low end of its range to the high end. Large tile and natural stone take more labor to set flat than standard ceramic.

What an older Seattle house adds

The usual finds are galvanized supply pipe, cast iron or lead drain parts, rot in the subfloor around the toilet and the tub, and a fan that vents into the attic or no fan at all. Seattle’s code summary calls for an exhaust fan in every bathroom, at least 50 cubic feet a minute, ducted to the outside. Old sheet flooring and wall texture can contain asbestos, which the Puget Sound Clean Air Agency requires to be checked before any renovation, and homes built before 1978 fall under the federal lead-safe work rules.

Seattle also runs further above the national average for bathrooms than for other rooms: 38% higher for the midrange remodel in the report, against 15% for a major kitchen. The bathroom permit guide covers which permits apply.

What the permits cost

Seattle’s building permit fee follows the value of the work: $1,156.16 for $30,000 of work and $1,832.36 for $60,000 on the field-inspection route, technology fee included. The plumbing permit comes from Public Health, at $137 plus $27 per fixture. The electrical permit comes from the city, at $55.48 plus $26.28 for each new or altered circuit up to 25 amps, and a 5% technology fee.

A worked example

Adding it up for one bathroom

Worked example, not a real job

Example: a 5 by 8 foot hall bathroom, full remodel

A typical full remodel taken back to the studs: a tiled shower in place of the old tub, tile floor, new vanity, toilet, fan and lighting, with the fixtures in the same places. Priced at $1,200 per square foot, a step above the report's midrange rate of $1,033 because of the tiled shower. The fees are computed from the 2026 schedules.

LineHow it is worked outAmount
Construction contract40 sq ft at $1,200 per sq ft. Demolition, plumbing, electrical, waterproofing, tile, fixtures, paint and cleanup.$48,000
Sales tax10.55% of the contract price (Seattle, October to December 2026).$5,064
Building permitSubject-to-field-inspection permit, if the city accepts $48,000 as the value: permit fee $1,065.50, plan review fee $426.20, technology fee $74.59.$1,566.29
Electrical permitSeattle's schedule: $55.48 administrative fee and 2 circuits up to 25 amps at $26.28, plus the 5% technology fee.$113.44
Plumbing permitPublic Health Seattle & King County: $137 plus $27 for each of 3 fixtures (shower, toilet, sink).$218
Total with tax and permits$54,961.73
Typical numbers put together to show how the lines add up. This is not a project we built and not a quote. The city sets the permit value itself, and an older house can add pipe, subfloor or asbestos work that a visit would find.

Price your own bathroom

The remodel cost calculator takes the kind of bathroom, the scope and the finish level and returns a range with the sales tax for your city.

Open the cost calculator

Questions

Bathroom remodel cost questions, answered

01

How much does a bathroom remodel cost in Seattle?

Most full bathroom remodels in Seattle cost $35,000 to $65,000 before tax. A refresh or a tub-to-shower conversion is typically $15,000 to $30,000, and a primary bath or a new layout $75,000 to $130,000. Remodeling magazine's 2025 Cost vs. Value report prices a midrange remodel of a 5 by 7 foot bathroom in Seattle at $36,146 and an upscale remodel that enlarges the room to 100 square feet at $107,451. Add 10.55% sales tax on the whole contract.

02

How much does a bathroom remodel cost per square foot?

About $1,033 per square foot for the midrange remodel in the 2025 Cost vs. Value report ($36,146 for 35 square feet) and about $1,075 for the upscale one ($107,451 for 100 square feet). That is more than double the report's rate for a major kitchen remodel. A bathroom packs a plumber, an electrician, a tile setter and waterproofing into the smallest room in the house, so the price does not shrink with the floor area.

03

How much does a tub-to-shower conversion cost in Seattle?

Typically $15,000 to $30,000 before tax when the rest of the bathroom stays. The price depends on whether the shower is a prefabricated base with wall panels or a tiled shower built in place, on the glass, and on what is found in the wall when the tub comes out. Changing the drain and the valve is plumbing work, so the job needs a plumbing permit from Public Health: $137 plus $27 per fixture in 2026.

04

How much does an accessible bathroom with a curbless shower cost?

The 2025 Cost vs. Value report prices a universal design remodel of a 5 by 7 foot bathroom in Seattle at $58,151: a curbless tiled shower with a fold-out seat, a 36 inch door, a comfort-height toilet, a heated floor and towel bars built to carry 250 pounds. That is about 61% more than the report's standard remodel of the same room, and the report estimates it returns more of its cost at resale, 59.2% against 46.8%.

05

How much does it cost to add a bathroom in Seattle?

As an addition to the house, the 2025 Cost vs. Value report puts a midrange bathroom addition in Seattle at $82,218. A bathroom built inside space you already have, such as a basement or a large closet, costs less because the walls and the roof exist, but it needs new drain, supply and vent lines, which is where the money goes.

06

Is a bathroom remodel worth it for resale?

Partly. The 2025 Cost vs. Value report estimates that a midrange bathroom remodel in Seattle returns 46.8% of its cost at sale, a universal design remodel 59.2% and an upscale remodel 35.3%. These are market averages. A bathroom that leaks, has no fan or has failing tile costs a seller more than the table shows, because buyers discount for the unknown.

07

How much do permits add to a bathroom remodel in Seattle?

For a full remodel on the city's subject-to-field-inspection route, about $1,600 to $2,300: the building permit and plan review fee, set from the value of the work, an electrical permit from the city priced by the circuit, and a plumbing permit from Public Health at $137 plus $27 per fixture. A refresh that changes no walls and no plumbing lines can need less.

08

How long does a bathroom remodel take?

About 2 to 3 weeks on site for a refresh or a tub-to-shower conversion, 4 to 6 weeks for a full remodel and 8 to 12 weeks for a primary bath with a new layout. Tile work sets the pace: waterproofing, setting and grout each need time to cure before the next step, and the inspections fall between them.

Free estimate

Get a price for your bathroom

We look at the drains, the fan, the subfloor and the wiring before we price, so the number you get is for your bathroom and not for an average one.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

When would you like to start?

We use your details to answer you. Nothing else.